Storage (Duration 2h)

18 unique locations (429 components)

Batchworth Cryptosporidium Barrier, Church Street, Rickmansworth, Hertfordshire, WD3 1JJ (6 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Water Pumping Station
• Water pumping station
Active • 2028-29 (T-4), 2017-18 (TR)
62.77 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (11 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
• Generators on hospital site
Active • 2025-26 (T-4), 2024-25 (T-4) ...
75.39 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
EDF Energy, Heysham 1 power station, Morecambe, Lancashire, LA3 2XF (14 components)
• 49.99MW Lithium-ion Energy Storage System
• Battery energy storage unit
• Peak power plant
Active • 2027-28 (T-4), 2024-25 (T-1) ...
709.09 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2472.54 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (56 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4657.99 MW
Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL (18 components)
• Battery Storage Plant
• Hamms Hall - Existing Site CHP
• Poole Existing Site CHP
Active • 2028-29 (T-4), 2026-27 (T-4) ...
18.43 MW
Land at Brook Farm, 90 High Street, Loscoe, DE75 7LJ (8 components)
• Battery energy storage unit
• CHPs at Queen Elizabeth Hospital
Active • 2028-29 (T-4), 2024-25 (T-1)
10.53 MW
Land At Woolaston Road, Woolaston Road, Redditch, Worcestershire B98 7SG Redditch (7 components)
• Battery Storage Plant
• Heysham 1 Power Station CMU 2: [HY1223] T_HEYM12
• New reciprocating gensets in acoustic enclosure
Active • 2027-28 (T-4), 2025-26 (T-4) ...
6.52 MW
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (18 components)
• Battery Storage Plant
• Small gas fired OCGT.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
98.37 MW
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (4 components)
• Chemical manufacturer
• New Build Battery Energy Storage system
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2022-23 (T-3) ...
15.50 MW
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (7 components)
• A new build 19MW battery energy storage system
• A new build 20MW battery energy storage system
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (7 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery Project on Greenfield Site
• New Build transmission connected Battery Storage site on land Adjacent to National Grid's Rainhill Substation
Active • 2028-29 (T-4), 2024-25 (T-1) ...
48.57 MW
Maentwrog Power Station Magnox Ltd Maentwrog nr Blaenau Ffestiniog Gwynedd LL414HY UK (15 components)
• Battery energy storage unit
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.39 MW
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (4 components)
• CHP Plant
• The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
183.24 MW
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (23 components)
• CHP at a horticultural environment.
• CHP at horticultural site
• Gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.83 MW
Southend University Hospital, Trust Prittlewell Chase, Southend-on-Sea, Westcliff on-Sea, SS0 0RY (12 components)
• A new build 19MW battery energy storage system
• CHP
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
2.45 MW
Toray 2 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (4 components)
• CMU consisting of multiple reciprocating engines and alternators
• Gas reciprocating engines.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
3.39 MW
Loading map...
Showing 18 locations