Storage (Duration 2h)

1 unique locations (4 components)

North Tawton, Sampford Courtenay, West Devon, Devon, England, EX20 2DA, United Kingdom (4 components)
• 30MW/30MWh one hour battery
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• On-site existing CHP generating unit
Active • 2025-26 (T-1), 2024-25 (T-1) ...
31.22 MW