Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

2 unique locations (4 components)

COTTAGE SOUTH BANTASKINE FALKIRK FK1 (2 components)
• CMU consists of reciprocating engines located in Swansea connected to the WPD system at 33kV. Auxiliary load is fed from before the metering and is therefore taken into account when delivering. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
• Lithium-based battery energy storage system
Active • 2025-26 (T-1), 2018-19 (T-4)
29.56 MW
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (2 components)

Lithium-based battery energy storage system

Active • 2026-27 (T-4), 2025-26 (T-1)
17.92 MW
Loading map...
Showing 2 locations