Storage (Duration 2h)

5 unique locations (132 components)

Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (4 components)
• Chemical manufacturer
• New Build Battery Energy Storage system
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2022-23 (T-3) ...
15.50 MW
Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL (18 components)
• Battery Storage Plant
• Hamms Hall - Existing Site CHP
• Poole Existing Site CHP
Active • 2028-29 (T-4), 2026-27 (T-4) ...
18.43 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (20 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
13.89 MW
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (17 components)
• New build battery storage.
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
31.11 MW