Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

521 unique locations (1480 components) - Page 1 of 21

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Reciprocating engines Storage (Duration 2h) Storage (Duration 5h) Combined Cycle Gas Turbine (CCGT) CARRINGTON STORAGE LIMITED CARLTON ENERGY NO: 5 LIMITED New Build Generating CMU Trafford Power Battery Storage Unit 1 Trafford Power Battery Storage Unit 1 +15 more Not Prequalified M31
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Glowhouse Power PR26
Active • 2025-26 (T-4)
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (3 components)
• CMU consisting of multiple reciprocating engines and alternators (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Reciprocating engines Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Glowhouse Power Glowhouse Power Not Prequalified PR26
Active • 2024-25 (T-4), 2023-24 (T-4) ...
165 Fordhouse Lane Stirchley Birmingham B30 3AG (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Stirchley Rejected B30
Active • 2028-29 (T-4)
4.19 MW
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (10 components)

Battery Storage Plant (3)

Storage Storage (Duration 1h) Storage (Duration 2h) MINETY SOUTH STORAGE 2 LTD New Build Generating CMU Minety North Storage Minety North Storage 009 +6 more SN16
Active • 2025-26 (T-4), 2024-25 (T-1) ...
22.86 MW
322 Broomloan Rd, Glasgow G51 2JQ (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) CHECKERS ENERGY LIMITED New Build Generating CMU Checkers G51
Active • 2028-29 (T-4)
10.47 MW
34 Bochum Parkway, S8 8JR (1 component)

A Distribution Connected Battery Energy Storage System

Storage (Duration 2h) JORDANTHORPE POWER LTD New Build Generating CMU Bochum Not Prequalified S8
Active • 2027-28 (T-4)
3.08 MW
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated land within a compound at Hyde
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
30.65 MW
72-77 Lower Tower Street, Hockley, Birmingham, B19 3NF (1 component)

New build battery storage

Storage (Duration 2h) VOLTARIA BES 101 LTD New Build Generating CMU Hockley B19
Active • 2028-29 (T-4)
8.90 MW
A89, Deans, West Lothian, Scotland, EH54 8TB, United Kingdom (2 components)

29.9MW/29.9MWh one hour battery (2)

Active • 2026-27 (T-4), 2024-25 (T-1)
10.31 MW
A981, Fraserburgh, Aberdeenshire, Scotland, AB43 7FW, United Kingdom (1 component)

A new build 45MW / 90MWh battery energy storage system

Active • 2027-28 (T-4)
4.16 MW
Abbey Home Farm, Burford Road, Cirencester, GL7 5HF (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Abbey Not Prequalified GL7
Active • 2025-26 (T-4)
adjacent to Kilmarnock South Substation KA1 3TN (2 components)
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
Storage (Duration 2h) ZENOBE KILMARNOCK SOUTH LIMITED New Build Generating CMU Kilmarnock South Not Prequalified KA1
Active • 2026-27 (T-4)
47.26 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Storage (Duration 2h) Storage (Duration 4h) Zenobe Stalybridge Limited New Build Generating CMU Stalybridge Stalybridge Not Prequalified SK15
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
Adswood Road, Cheadle Hulme, Stockport, Greater Manchester, SK8 5QY (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Stockport BESS Stockport BESS Not Prequalified SK8
Active • 2028-29 (T-4), 2027-28 (T-4)
20.56 MW
Aikengall 2a Wind Farm Innerwick EH42 1SG (1 component)

New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.

Storage (Duration 2h) AIK2A SUSTAINABLE ENERGY LTD New Build Generating CMU Aikengall IIA BESS Yr 1 Not Prequalified EH42
Active • 2024-25 (T-1)
11.34 MW
Aikengall 2a Wind Farm Innerwick EH42 1SG (1 component)

New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.

Active • 2027-28 (T-4)
6.70 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (7 components)
• Battery storage plant (2)
• Existing generating battery storage unit.
Storage (Duration 1h) Storage (Duration 2h) ARBROATH LIMITED New Build Generating CMU Arbroath 17.5MW 2hour BESS Arbroath 17.5MW 2hour BESS +4 more DD11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.89 MW
Ardencaple Farm, Rhu, Helensburgh, Argyll & Bute, G84 8JX (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Ardencaple Rejected G84
Active • 2028-29 (T-4)
10.47 MW
Arran View Jameston Farm Dalry North Ayrshire KA24 4EY (1 component)

13 x 3.800MW / 7.491MWh storage units installed on designated land within a brownfield site at Jameston Farm, Dalry, North Ayrshire, KA24 4EY

Storage (Duration 2h) ARRAN VIEW STORAGE LTD New Build Generating CMU Not Prequalified KA24
Active • 2026-27 (T-4)
11.79 MW
Ash Lane, Bramley, Little London, Basingstoke and Deane, Hampshire, RG26 5FL, United Kingdom (1 component)

New build 49.995MW / 99.990MWh battery energy storage system.

Active • 2027-28 (T-4)
4.62 MW
Ashlett Creek, Fawley, Hampshire, SO45 1DT (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Fawley Not Prequalified SO45
Active • 2027-28 (T-4)
11.08 MW
Ashley Clinton Estate, Milford-on-Sea, Lymington, SO41 0LA (1 component)

A standalone 0.949MW BESS connected directly to the DNO network

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 2 Rejected SO41
Active • 2025-26 (T-1)
0.26 MW
Ashorne Solar, Chesterton Fields Farm, Fosse Way, Ashorne Hill, CV33 9JY (1 component)

Battery Storage

Active • 2028-29 (T-4)
1.81 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (4 components)
• New build battery storage CMU with CMU ID 22AUC4
• New build battery storage CMU with CMU ID 23AUC1
• New build battery storage CMU with CMU ID 24AUC1
Storage (Duration 2h) FIELD AUCHTERAW LTD. New Build Generating CMU FIELD AUCHTERAW FIELD AUCHTERAW +2 more PH32
Active • 2026-27 (T-4), 2025-26 (T-1) ...
49.76 MW
Loading map...
Showing 25 locations