Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

8 unique locations (11 components)

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Farnham Battery Storage, Wrecclesham Hill, Farnham, GU10 4JU (1 component)

A new build 20MW battery energy storage system

Storage (Duration 2h) HARMONY FM LIMITED New Build Generating CMU Farnham ESS GU10
Inactive • 2023-24 (T-1)
7.40 MW
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Coventry CV2
Inactive • 2023-24 (T-1)
16.66 MW
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Bustleholm WS5
Inactive • 2023-24 (T-1)
16.66 MW
Land on Jameston Farm, Dalry Ayrshire KA24 4EY (1 component)

Array of lithium ion batteries in a power generation environment, proving power to National Grid. Change of use of land from agricultural to new build generation.

Inactive • 2022-23 (T-4)
LAND ON THE SOUTH SIDE OF, PURLIEUS FARM, MINETY, MALMESBURY, SN16 9RP (Nearest postcode SN16 9DX) (2 components)

Battery Storage Plant (2)

Storage Storage (Duration 2h) MINETY SOUTH STORAGE LIMITED New Build Generating CMU Minety South Storage 008 Minety South Storage 049 Conditional SN16
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Mannington Depot, Mannington Depot Service Road Mannington Swindon SN5 8BA (2 components)

A Battery Energy Storage System. (2)

Storage (Duration 2h) SW MANNINGTON LIMITED Existing Generating CMU Mannington Mannington SN5
Inactive • 2023-24 (T-1), 2022-23 (T-1)
10.29 MW
Plot 10 Dunnikier Business Park Midfield Drive Mitchelston Industrial Estate Kirkcaldy Fife KY1 3LW (2 components)

BATTERY STORAGE UNIT WITH 13.5 MWh energy supply and 20 MW power capacity (2)

Storage Storage (Duration 2h) Sainc Energy Limited New Build Generating CMU DPG-002 DPG-002 Rejected KY1
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Timsbury Manor, Romsey SO51 0NE (1 component)

Lithium ion battery operating as a power plant. Change of use from redundant quarry.

Inactive • 2022-23 (T-4)
Loading map...
Showing 8 locations