Storage (Duration 2h)

159 unique locations (343 components) - Page 1 of 7

Wright Street, Paisley, Renfrew, PA4 8AN (1 component)

Battery Energy Storage, 49.990 MW installed for a 2hr system.

Active • 2028-29 (T-4)
10.47 MW
Worset Lane, Whelley Hill Farm, Hart, Hartlepool, TS27 3BH. (1 component)

The CMU component consist of Li-ion (or equivalent) Battery Storage and Inverter units to be installed on designated land at Worset Lane, Whelley Hill Farm, Hart, Hartlepool, TS27 3BH.

Active • 2027-28 (T-4)
5.54 MW
Withy Place, Bramley Road, Silchester, Reading, RG7 2LN (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.47 MW
Wise Warren Farm, Warren Lane, Tadcaster, LS24 9NU (1 component)

A new-build energy storage site

Active • 2027-28 (T-4)
4.31 MW
Widow Hill, Balderstone Lane, Burnley, BB10 2TA (1 component)

70MW BESS installation made up of 38 units of 4MW batteries - resulting in a storage capacity of >2 hours.

Active • 2027-28 (T-4)
10.77 MW
Wansborough Paper Mill, Watchet, Somerset, TA23 0AY (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
1.64 MW
Uskmouth Power Station, West Nash Road, Newport, NP18 2BZ (2 components)

115MW battery energy storage system on a shared transmission connection

Active • 2028-29 (T-4)
16.12 MW
Tyne Tunnel Industrial Estate, North Shields, Tyne & Wear, NE29 7SE (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
5.34 MW
Todrig Farm Coldstream TD12 4JA (5 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and …

Active • 2028-29 (T-4), 2027-28 (T-4)
71.20 MW
Timsbury Manor, Romsey SO51 0NE (1 component)

Lithium ion battery operating as a power plant. Change of use from redundant quarry.

Inactive • 2022-23 (T-4)
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (4 components)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm.
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is currently in construction and due to be operational in Q4 ?23
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is currently in construction and due to be operational in Q4 ?23.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.47 MW
Tillingdown Lane, Caterham, CR3 7JA (2 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
7.52 MW
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (4 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Active • 2027-28 (T-4)
172.37 MW
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (11 components)
• New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
• New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
Active • 2028-29 (T-4), 2027-28 (T-4)
584.36 MW
The land at Rownall Hall Farm, Rownall Road, Wetley Rocks, Stoke-on-Trent, ST9 0BS (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 300MW, located in Stoke.

Active • 2027-28 (T-4)
31.54 MW
The fields close to The Cottage, The Priory, Priory Lane, Little Wymondley, Hitchin, SG4 7HD (1 component)

WYBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Active • 2028-29 (T-4)
6.28 MW
Surteco UK Ltd, Widow Hill Road, Burnley, BB10 2TB (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
2.63 MW
St Philips energy storage facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4)
2.32 MW
Staythorpe BESS, Staythorpe Road, Nottinghamshire, NG23 5RE (1 component)

The CMU is a Battery Energy Storage System with a planned 437MW active power output, consisting of containerised batteries.

Active • 2027-28 (T-4)
36.01 MW
Station Road, Southfleet, Dartford, Kent, England, DA13 9PA, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Active • 2027-28 (T-4)
46.02 MW
7.68 MW
Stammery Hill, Sector, Axminster, East Devon, Devon, England, EX13 5UH, United Kingdom (1 component)

The proposed power plant would consist of a number new highly efficient lithium-ion battery units plus ancillary equipment. Each genset is based on advanced battery technology.

Active • 2027-28 (T-4)
22.93 MW
Slack Lane, Bolton, Greater Manchester, BL5 3LJ (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4)
4.84 MW
Shipley Road, Goffsland Farm, Shipley, Horsham, West Sussex, England, RH13 8PA, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Active • 2027-28 (T-4)
61.41 MW