Land at Sturts Farm, Three Cross Road, West Moors, Ferndown, BH21 6QU (1 component)

98MW / 196MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU STURTS FARM Not Prequalified BH21
Active • 2026-27 (T-4)
23.16 MW
Land at The Magazine, Hull Road, Selby, YO8 5BJ (24 components)
• Battery energy storage unit (2)
• Battery storage unit
Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Hull Road Hull Road Not Prequalified YO8
Active • 2028-29 (T-4), 2027-28 (T-4)
29.76 MW
Land at the Risby Estate or in the vicinity of the Creyke Beck 400kV National Grid substation, Yorkshire, HU16 5SR (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CB BATTERY LIMITED New Build Generating CMU Creyke Beck 1 HU16
Active • 2025-26 (T-4)
Land at Tuxton Farm, Plympton, Plymouth, PL7 5AA (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Plympton Not Prequalified PL7
Active • 2026-27 (T-4)
7.08 MW
Land at Vause Farm, Town Lane, Charnock Richard, Chorley, PR7 5HL (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) SIRIUS ECODEV (VAUSE) LTD New Build Generating CMU Vause Farm Not Prequalified PR7
Active • 2025-26 (T-4)
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL (4 components)

Battery Storage Plant (2)

Storage (Duration 2h) THURROCK STORAGE LIMITED New Build Generating CMU Thurrock Storage Limited Thurrock Storage Limited +2 more RM18
Active • 2027-28 (T-4), 2025-26 (T-1)
63.81 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a gas power facility on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
817.08 MW
Land At Westerton Road, Keith, Moray, AB55 5NR (1 component)

CMU 24KEI4 is a battery storage CMU.

Storage (Duration 2h) FIELD KEITH LTD New Build Generating CMU Field Keith AB55
Active • 2028-29 (T-4)
7.23 MW
Land at Whitegate Substation, Broadgate, Oldham, OL9 9XA (3 components)
• A Battery Energy Storage System. (2)
• A New Build Gas fuelled power plant.
Reciprocating engines Storage (Duration 2h) HD144WHI LTD New Build Generating CMU Whitegate Whitegate +1 more OL9
Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.92 MW
23.10 MW
Land close to Smeaton Shaw Farm, Dalkeith, EH22 2NL (2 components)

2H duration Lithium Ion Battery Storage New Build CMU. (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
70.27 MW
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Coventry CV2
Inactive • 2023-24 (T-1)
16.66 MW
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Coventry CV2
Active • 2024-25 (T-4)
Land east and west of 2 Riversdale Way, Lemington, Newcastle, NE15 8AB (1 component)

CMU ID 22STE4, a new build battery storage CMU

Storage (Duration 2h) PEGANA GREEN ENERGY LIMITED New Build Generating CMU Stella North Not Prequalified NE15
Active • 2026-27 (T-4)
12.65 MW
LAND EAST AND WEST OF HONILEY ROAD (A4177), HONILEY, KENILWORTH, WARWICKSHIRE (1 component) Geocoding Needed

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU BERKSWELL Rejected
Active • 2026-27 (T-4)
11.67 MW
Land east of A981, Fraserburgh, Aberdeenshire (2 components) Geocoding Needed

12 x 3.800MW / 7.491MWh storage units installed on land adjacent to A981, Fraserburgh (2)

Storage (Duration 2h) FRASERBURGH ENERGY LTD New Build Generating CMU Not Prequalified
Active • 2026-27 (T-4), 2023-24 (T-1)
13.31 MW
Land East of Bowbridge Lane, New Balderton, Newark, Nottinghamshire, NG24 3BY (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Newark B Newark B Not Prequalified NG24
Active • 2028-29 (T-4), 2027-28 (T-4)
6.71 MW
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 4h) DAMSONGREEN ENERGYFARM LIMITED New Build Generating CMU Pivot Power Bramford Pivot Power Bramford +1 more IP8
Active • 2026-27 (T-4), 2025-26 (T-1) ...
35.45 MW
Land east of Grahamston Road, Paisley, PA2 7DA (1 component)

60MW / 120MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU DYKEBAR Not Prequalified PA2
Active • 2026-27 (T-4)
14.18 MW
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (3 components)
• New Build Battery Energy Storage system (2)
• New Build 49.99 MW Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CAS LIMITED New Build Generating CMU Castleford ESS Castleford ESS +1 more Rejected WF11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.79 MW
3.23 MW
LAND EAST OF LEDSTON SUBSTATION, LEDSTON, WEST YORKSHIRE, WF10 2AW (2 components)

New Build 25 MW Battery Energy Storage system (2)

Storage (Duration 2h) Storage (Duration 1.5h) HARMONY LS LIMITED New Build Generating CMU Leadstone ESS Leadstone ESS Not Prequalified WF10
Active • 2027-28 (T-4), 2026-27 (T-4)
7.52 MW
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (3 components)

Lithium-based battery energy storage system (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
26.97 MW
Loading map...
Showing 25 locations