land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery …
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a gas …
Active • 2027-28 (T-4), 2026-27 (T-4) ...
817.08 MW
Land At Westerton Road, Keith, Moray, AB55 5NR (1 component)

CMU 24KEI4 is a battery storage CMU.

Active • 2028-29 (T-4)
7.23 MW
Land at Whitegate Substation, Broadgate, Oldham, OL9 9XA (3 components)
• A Battery Energy Storage System. (2)
• A New Build Gas fuelled power plant.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land close to Smeaton Shaw Farm, Dalkeith, EH22 2NL (2 components)

2H duration Lithium Ion Battery Storage New Build CMU. (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
70.27 MW
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
Land east and west of 2 Riversdale Way, Lemington, Newcastle, NE15 8AB (1 component)

CMU ID 22STE4, a new build battery storage CMU

Active • 2026-27 (T-4)
12.65 MW
LAND EAST AND WEST OF HONILEY ROAD (A4177), HONILEY, KENILWORTH, WARWICKSHIRE (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
11.67 MW
Land east of A981, Fraserburgh, Aberdeenshire (2 components)

12 x 3.800MW / 7.491MWh storage units installed on land adjacent to A981, Fraserburgh (2)

Active • 2026-27 (T-4), 2023-24 (T-1)
10.63 MW
Land East of Bowbridge Lane, New Balderton, Newark, Nottinghamshire, NG24 3BY (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
6.71 MW
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
22.99 MW
Land east of Grahamston Road, Paisley, PA2 7DA (1 component)

60MW / 120MWh BESS

Active • 2026-27 (T-4)
14.18 MW
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (4 components)
• New Build Battery Energy Storage system (2)
• New Build 49.99 MW Battery Energy Storage system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.54 MW
LAND EAST OF LEDSTON SUBSTATION, LEDSTON, WEST YORKSHIRE, WF10 2AW (2 components)

New Build 25 MW Battery Energy Storage system (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
7.52 MW
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (3 components)

Lithium-based battery energy storage system (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
17.92 MW
Land lying at Southfields Farm, Garsdon, Malmesbury, SN16 9PQ (3 components)

A Battery Energy Storage System. (2)

Active • 2028-29 (T-4), 2025-26 (T-4)
79.30 MW
Land lying to the east of Rectory Lane, Upton Warren, Bromsgrove, B61 7ET (1 component)

This is a 29.700 MW battery storage facility connected at 66kV.

Active • 2028-29 (T-4)
4.67 MW
Land Lying To The South Of Manor Farm, Ratcliffe On Soar, Nottingham NG11 0EA (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Active • 2027-28 (T-4)
18.47 MW
Land lying to the south west of Rouncil Lane, Kenilworth (CV8 1NN) (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2027-28 (T-4)
5.85 MW
20.94 MW
Land near Ellbridge Lane, Ellbridge, Landulph, Saltash, Cornwall, PL12 6PU (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
5.34 MW