Storage (Duration 2h)
506 unique locations (1605 components) - Page 10 of 21
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL (4 components)
Battery Storage Plant (2)
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
Land At Westerton Road, Keith, Moray, AB55 5NR (1 component)
CMU 24KEI4 is a battery storage CMU.
Land at Whitegate Substation, Broadgate, Oldham, OL9 9XA (3 components)
LAND BETWEEN SHILTON COTTAGE AND M898, SHILTON LANE, BISHOPTON. DRUMCROSS FARM, DRUMCROSS ROAD, BISHOPTON, PA7 5NU (3 components)
BATTERY STORAGE PLANT (3)
Land close to Smeaton Shaw Farm, Dalkeith, EH22 2NL (2 components)
2H duration Lithium Ion Battery Storage New Build CMU. (2)
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 component)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 component)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land east and west of 2 Riversdale Way, Lemington, Newcastle, NE15 8AB (1 component)
CMU ID 22STE4, a new build battery storage CMU
LAND EAST AND WEST OF HONILEY ROAD (A4177), HONILEY, KENILWORTH, WARWICKSHIRE (1 component)
A 49.400 MW / 98.800 MWh battery energy storage system
Land east of A981, Fraserburgh, Aberdeenshire (2 components)
12 x 3.800MW / 7.491MWh storage units installed on land adjacent to A981, Fraserburgh (2)
Land East of Bowbridge Lane, New Balderton, Newark, Nottinghamshire, NG24 3BY (2 components)
New Build CMU comprising of battery storage and associated plant (2)
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)
Land east of Grahamston Road, Paisley, PA2 7DA (1 component)
60MW / 120MWh BESS
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (4 components)
Land East of Langford Mill and Tye Farm, Langford, Devon, EX15 2JY (1 component)
Battery storage
LAND EAST OF LANGFORD MILL AND TYE FARM, LANGFORD, DEVON, EX15 2JY (1 component)
Battery Storage
LAND EAST OF LEDSTON SUBSTATION, LEDSTON, WEST YORKSHIRE, WF10 2AW (2 components)
New Build 25 MW Battery Energy Storage system (2)
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (3 components)
Lithium-based battery energy storage system (3)
Land lying at Southfields Farm, Garsdon, Malmesbury, SN16 9PQ (3 components)
A Battery Energy Storage System. (2)
Land lying to the east of Rectory Lane, Upton Warren, Bromsgrove, B61 7ET (1 component)
This is a 29.700 MW battery storage facility connected at 66kV.
Land Lying To The South Of Manor Farm, Ratcliffe On Soar, Nottingham NG11 0EA (1 component)
Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
Land lying to the south west of Rouncil Lane, Kenilworth (CV8 1NN) (1 component)
Battery energy storage system, together with associated equipment, infrastructure and ancillary works.
LAND LYING TO THE WEST OF STEPHENSON ROAD, WILSDEN, BRADFORD, BD15 0BZ (1 component)
New Build Battery Storage
Land near Ellbridge Lane, Ellbridge, Landulph, Saltash, Cornwall, PL12 6PU (1 component)
New Build CMU comprising of battery storage and associated plant