Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

359 unique locations (1549 components) - Page 11 of 15

Land West Of Slack Lane, Westhoughton, Bolton BL5 3LB (3 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
6.28 MW
Land West Of Slack Lane, Westhoughton, Bolton, BL5 3LB (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
6.28 MW
Lark's Lane, Iron Acton, Latteridge, South Gloucestershire, West of England, England, BS37 9TX (1 component)

A Distribution Connected Battery Energy Storage System.

Active • 2028-29 (T-4)
20.94 MW
Latteridge Lane, Iron Acton, Tytherington, South Gloucestershire, West of England, England, BS35 3TF (2 components)

A Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
20.73 MW
Leafield Battery Site, Monks Lane, Corsham SN13 9PH (2 components)

electricity storage site comprising brand new batteries, inverters and associated connection plant

Active • 2026-27 (T-4)
7.09 MW
Leylodge, Aberdeenshire, AB51 0XY (2 components)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
14.15 MW
Link Road, Launceston, Cornwall, PL15 9LP England (8 components)
• New-Build Li-Ion BESS, 2hr duration.
• Recently-commissioned, existing Li-Ion BESS, 2hr duration.
Active • 2024-25 (T-1), 2025-26 (T-4) ...
5.13 MW
Linwood WWTW, Linwood, Paisley, PA3 3DP (1 component)

60MW/120MWh BESS

Active • 2026-27 (T-4)
14.18 MW
Little Raith Farm, Auchtertool, Fife, KY5 0AX (12 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• Battery Energy Storage facility
Active • 2023-24 (T-1), 2023-24 (T-4) ...
106.91 MW
lLand off Lincomb Lane, Lincomb, Stourport On Severn, DY13 9RB (3 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
41.46 MW
Lowfields Way, Lowfields Business Park, HX5 9DA (6 components)
• New build battery storage
• New build generating storage unit
Active • 2023-24 (T-1), 2028-29 (T-4)
66.79 MW
Mannington Depot, Mannington Depot Service Road Mannington Swindon SN5 8BA (5 components)

A Battery Energy Storage System.

Inactive • 2022-23 (T-1), 2023-24 (T-1)
20.58 MW
Mannington Depot, Telford Way, Swindon, SN5 8BA (3 components)

A Battery Energy Storage System

Inactive • 2022-23 (T-1)
McQuittiston Farm, A70, Ochiltree, East Ayrshire, Scotland, KA6 6NF (1 component)

A Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
6.26 MW
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (3 components)

The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries.

Active • 2026-27 (T-4), 2027-28 (T-4)
183.24 MW
Mount Stamper Road, St Austell, Cornwall, PL25 5QP (2 components)

New-Build Li-Ion BESS, 2hr duration.

Active • 2028-29 (T-4)
2.09 MW
Netherton Farm, Keith AB55 5PE (3 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
Active • 2025-26 (T-1), 2026-27 (T-4)
54.30 MW
Newburth, Perth, Scotland, KY14 6EW (1 component)

Storage battery 2h duration

Active • 2028-29 (T-4)
13.61 MW
Newnham Road, Radwell, Baldock, North Hertfordshire, Hertfordshire, England, SG7 5DP (1 component)

A Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.37 MW
New Road, Featherstone, Wolverhampton, WV10 7NS (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
9.93 MW
35.45 MW
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (2 components)

New build two-hour duration battery storage

Active • 2026-27 (T-4)
4.16 MW
North of Hull Rd, Osbaldwick, York,YO10 3JA (1 component)

New build battery storage.

Active • 2025-26 (T-4)
9.54 MW
Loading map...
Showing 25 locations