Storage (Duration 2h)

553 unique locations (1600 components) - Page 11 of 23

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Land off Bilport Lane, Wednesbury, Ws10 0PD (1 component) Geocoding Needed

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Wednesbury B1 Not Prequalified WS10
Active • 2026-27 (T-4)
17.72 MW
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (4 components) Geocoding Needed
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU KEMSLEY089 Kemsley B1 +2 more Rejected ME10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
67.74 MW
Land off Balbeggie Avenue, Thornton, Fife, Scotland, KY1 3NS, United Kingdom (1 component) Geocoding Needed

2 hour battery energy storage system

Storage (Duration 2h) RELAY BALBEGGIE LIMITED New Build Generating CMU Relay Balbeggie Limited Not Prequalified KY1
Active • 2027-28 (T-4)
7.68 MW
Land off A130, Rettendon, Chelmsford, Essex, East of England, England, SS11 7RL, United Kingdom (3 components) Geocoding Needed

A Battery Energy Storage System

Storage (Duration 2h) HD192RAY LTD New Build Generating CMU Rayleigh Rayleigh +1 more SS11
Active • 2027-28 (T-4), 2026-27 (T-4) ...
78.67 MW
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components) Geocoding Needed
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Atherton
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 hour battery storage system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.28 MW
Land north west of Bredbury Substation, Welkin Road, Bredbury, Stockport, SK6 2BS (4 components) Geocoding Needed

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
43.43 MW
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Bredbury SK6
Active • 2025-26 (T-1)
13.07 MW
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (4 components) Geocoding Needed

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
48.66 MW
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Braintree Pivot Power Braintree +1 more CM77
Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.89 MW
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (6 components) Geocoding Needed
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity.
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.
Storage (Duration 2h) Storage (Duration 1.5h) GRIDSOURCE (WOBURN RD) LIMITED New Build Generating CMU Woburn Road Woburn Road +2 more MK43
Active • 2027-28 (T-4), 2026-27 (T-4) ...
15.66 MW
Land North Of Stoke Lane Dunston Norfolk, NR14 8QD (1 component) Geocoding Needed

" Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration"

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Norwich2 Rejected NR14
Active • 2028-29 (T-4)
14.66 MW
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (5 components) Geocoding Needed
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Storage (Duration 1h) Storage (Duration 2h) CONRAD (MIDSOMER) LIMITED CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Midsomer Norton Midsomer Norton +3 more BA3
Active • 2026-27 (T-4), 2025-26 (T-4) ...
6.46 MW
Land North of Melksham Substation, Wiltshire, Melksham, SN15 2LU (1 component) Geocoding Needed

Battery Storage

Storage (Duration 2h) JBM SOLAR PROJECTS 13 LIMITED New Build Generating CMU CMU_WICK SN15
Active • 2027-28 (T-4)
4.61 MW
Land north of Indian Queens Substation, Domellick Hill (B3279), St Dennis, St Austell, Cornwall, PL26 8BY (2 components) Geocoding Needed

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Indian Queens Pivot Power Indian Queens PL26
Active • 2026-27 (T-4), 2025-26 (T-1)
19.56 MW
Land North Of Gala Bingo, Winterton Road, Scunthorpe, DN15 0DH. (1 component) Geocoding Needed

A Battery Energy Storage System.

Storage (Duration 2h) KXP WINTERTON LIMITED New Build Generating CMU Winterton DN15
Active • 2027-28 (T-4)
14.62 MW
Land, North of A683 & Heysham substation, Lancaster, Morecambe Bypass, Morecambe, Lancashire. (1 component) Geocoding Needed

2H duration Lithium Ion Battery Storage New Build CMU.

Active • 2026-27 (T-4)
47.26 MW
Land North East of Sandyforth Farm, Ashton Road, Wigan WN5 7XZ (1 component) Geocoding Needed

New Build Battery Storage

Storage (Duration 2h) UKGEA 1 LIMITED New Build Generating CMU UKGEASBESS Not Prequalified WN5
Active • 2028-29 (T-4)
14.51 MW
Land North East Of Sandyforth Farm Ashton Road Billinge Wigan WN5 7XZ (1 component) Geocoding Needed

New Build Battery Storage

Storage (Duration 2h) UKGEA 1 LIMITED New Build Generating CMU UKGEA Not Prequalified WN5
Active • 2028-29 (T-4)
12.15 MW
Land Northeast of Moat Lane, Moat Farm, Wickersley, Rotherham, S66 1DZ (1 component) Geocoding Needed

New-build energy storage asset

Storage (Duration 2h) HARMONY TC LIMITED New Build Generating CMU Thurcroft BESS Rejected S66
Active • 2028-29 (T-4)
15.71 MW
Land northeast of Kingston Road, Slimbridge, Gloucestershire, GL2 7BW (1 component) Geocoding Needed

2 hour Battery Energy Storage System

Active • 2028-29 (T-4)
7.54 MW
Land northeast of Kingston Road, Slimbridge, Gloucestershire, GL27BW (1 component)

2 hour Battery Energy Storage System

Storage (Duration 2h) SLIMBRIDGE ENERGY LIMITED New Build Generating CMU SlimbridgeBESS GL2
Active • 2028-29 (T-4)
7.54 MW
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components) Geocoding Needed
• A new build 29MW battery energy storage system
• A new build 30MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HARMONY JF LIMITED New Build Generating CMU JAMESFIELD JAMESFIELD +3 more KY14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
55.69 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application), Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (5 components) Geocoding Needed
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.71 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (3 components)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU) (2)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
Storage (Duration 1h) Storage (Duration 2h) FP LUX SCURF DYKE SOLAR LIMITED New Build Generating CMU Scurf Dyke Solar Limited Scurf Dyke Solar Limited YO25
Active • 2025-26 (T-1), 2024-25 (T-1) ...
12.03 MW
Land north east of Bustleholm Substation, Painswick Close, Walsall, WS5 4SJ (1 component) Geocoding Needed

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
19.45 MW
Loading map...
Showing 25 locations