Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

553 unique locations (1600 components) - Page 12 of 23

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Land Next To Bojea Farm, St Austell, PL25 5RU (2 components)
• A New Build Distribution Connected Battery Energy Storage System.
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Storage (Duration 2h) Storage (Duration 1.5h) BALANCE POWER PROJECTS LIMITED New Build Generating CMU ST AUSTELLS ST AUSTELLS PL25
Active • 2027-28 (T-4), 2026-27 (T-4)
17.52 MW
Land Near To Monks House, Westerleigh, BS37 8RD (2 components)

BESS with Lit-Ion technology, 2 hours duration

Storage (Duration 2h) RENBAT 6 LIMITED New Build Generating CMU Westerleigh1 Westerleigh2 Not Prequalified BS37
Active • 2027-28 (T-4)
30.60 MW
Land Near School Lane, Sittingbourne, ME9 8QG (1 component)

Battery Storage

Storage (Duration 2h) JBM SOLAR PROJECTS 27 LIMITED New Build Generating CMU CMU_RASP Not Prequalified ME9
Active • 2027-28 (T-4)
4.61 MW
Land near School Lane, Sittingbourne, ME9 8QG (1 component)

Battery Storage

Active • 2028-29 (T-4)
8.14 MW
Land Near Minety Substation, Minety, Wiltshire, SN16 9DX (1 component)

Battery Storage

Storage (Duration 2h) JBM SOLAR PROJECTS 14 LTD New Build Generating CMU CMU_MINE SN16
Active • 2027-28 (T-4)
4.39 MW
Land near Ellbridge Lane, Hatt, Saltash, PL12 6PU (2 components)
• New Build CMU comprising of Solar PV and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Solar Photovoltaic Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Landulph Battery Landulph Solar Not Prequalified PL12
Active • 2026-27 (T-4)
10.58 MW
Land near Ellbridge Lane, Ellbridge, Landulph, Saltash, Cornwall, PL12 6PU (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Landulph Battery PL12
Active • 2027-28 (T-4)
5.34 MW
LAND LYING TO THE WEST OF STEPHENSON ROAD, WILSDEN, BRADFORD, BD15 0BZ (1 component)

New Build Battery Storage

Storage (Duration 2h) 24 POWER LTD New Build Generating CMU BRADWESTBESS BD15
Active • 2028-29 (T-4)
20.94 MW
Land lying to the south west of Rouncil Lane, Kenilworth (CV8 1NN) (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Storage (Duration 2h) FLEXION ENERGY HOLDINGS UK LTD New Build Generating CMU Not Prequalified CV8
Active • 2027-28 (T-4)
5.85 MW
Land Lying To The South Of Manor Farm, Ratcliffe On Soar, Nottingham NG11 0EA (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Ratcliffe0082 Not Prequalified NG11
Active • 2027-28 (T-4)
18.47 MW
Land lying to the east of Rectory Lane, Upton Warren, Bromsgrove, B61 7ET (1 component)

This is a 29.700 MW battery storage facility connected at 66kV.

Storage (Duration 2h) RECTORY FARM ENERGY STORAGE LTD New Build Generating CMU Rectory Farm Not Prequalified B61
Active • 2028-29 (T-4)
4.67 MW
Land lying at Southfields Farm, Garsdon, Malmesbury, SN16 9PQ (3 components)

A Battery Energy Storage System.

Storage (Duration 2h) Storage (Duration 8h) PD688IRO LTD PD503HAN LTD New Build Generating CMU Minety 2 Southfields 1 +1 more SN16
Active • 2028-29 (T-4), 2025-26 (T-4)
98.17 MW
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (3 components)

Lithium-based battery energy storage system

Active • 2026-27 (T-4), 2025-26 (T-1) ...
26.97 MW
LAND EAST OF LEDSTON SUBSTATION, LEDSTON, WEST YORKSHIRE, WF10 2AW (2 components)

New Build 25 MW Battery Energy Storage system

Storage (Duration 2h) Storage (Duration 1.5h) HARMONY LS LIMITED New Build Generating CMU Leadstone ESS Leadstone ESS Not Prequalified WF10
Active • 2027-28 (T-4), 2026-27 (T-4)
7.52 MW
3.23 MW
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (3 components)
• New Build 49.99 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CAS LIMITED New Build Generating CMU Castleford ESS Castleford ESS +1 more Rejected WF11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.79 MW
Land east of Grahamston Road, Paisley, PA2 7DA (1 component)

60MW / 120MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU DYKEBAR Not Prequalified PA2
Active • 2026-27 (T-4)
14.18 MW
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) Storage (Duration 4h) DAMSONGREEN ENERGYFARM LIMITED New Build Generating CMU Pivot Power Bramford Pivot Power Bramford +1 more IP8
Active • 2026-27 (T-4), 2025-26 (T-1) ...
35.45 MW
Land East of Bowbridge Lane, New Balderton, Newark, Nottinghamshire, NG24 3BY (2 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Newark B Newark B Not Prequalified NG24
Active • 2028-29 (T-4), 2027-28 (T-4)
6.71 MW
Land east of A981, Fraserburgh, Aberdeenshire (2 components) Geocoding Needed

12 x 3.800MW / 7.491MWh storage units installed on land adjacent to A981, Fraserburgh

Storage (Duration 2h) FRASERBURGH ENERGY LTD New Build Generating CMU Not Prequalified
Active • 2026-27 (T-4), 2023-24 (T-1)
13.31 MW
LAND EAST AND WEST OF HONILEY ROAD (A4177), HONILEY, KENILWORTH, WARWICKSHIRE (1 component) Geocoding Needed

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU BERKSWELL Rejected
Active • 2026-27 (T-4)
11.67 MW
Land east and west of 2 Riversdale Way, Lemington, Newcastle, NE15 8AB (1 component)

CMU ID 22STE4, a new build battery storage CMU

Storage (Duration 2h) PEGANA GREEN ENERGY LIMITED New Build Generating CMU Stella North Not Prequalified NE15
Active • 2026-27 (T-4)
12.65 MW
Land directly South to Coventry Substation, Parrotts Grove, Coventry, CV2 1NQ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
19.45 MW
Land close to Smeaton Shaw Farm, Dalkeith, EH22 2NL (2 components)

2H duration Lithium Ion Battery Storage New Build CMU.

Active • 2028-29 (T-4), 2027-28 (T-4)
70.27 MW
Loading map...
Showing 25 locations