Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

561 unique locations (1611 components) - Page 13 of 23

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Land north west of Bredbury Substation, Welkin Road, Bredbury, Stockport, SK6 2BS (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
43.43 MW
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Atherton
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 hour battery storage system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.28 MW
Land off A130, Rettendon, Chelmsford, Essex, East of England, England, SS11 7RL, United Kingdom (3 components)

A Battery Energy Storage System

Storage (Duration 2h) HD192RAY LTD New Build Generating CMU Rayleigh Rayleigh +1 more SS11
Active • 2027-28 (T-4), 2026-27 (T-4) ...
78.67 MW
Land off Balbeggie Avenue, Thornton, Fife, Scotland, KY1 3NS, United Kingdom (1 component)

2 hour battery energy storage system

Storage (Duration 2h) RELAY BALBEGGIE LIMITED New Build Generating CMU Relay Balbeggie Limited Not Prequalified KY1
Active • 2027-28 (T-4)
7.68 MW
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (4 components)
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU KEMSLEY089 Kemsley B1 +2 more Rejected ME10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
67.74 MW
Land off Bilport Lane, Wednesbury, Ws10 0PD (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Wednesbury B1 Not Prequalified WS10
Active • 2026-27 (T-4)
17.72 MW
Land off Bilport Lane, Wednesbury, WS10 0PD (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Wednesbury B2 Not Prequalified WS10
Active • 2026-27 (T-4)
5.91 MW
Land off, Dale Road, Spondon, Derby, East Midlands, England, DE21 7DL (5 components)

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU 50MW Battery 1 Not Prequalified DE21
Active • 2025-26 (T-4)
19.60 MW
Land Off Darnall Road, Sheffield, South Yorkshire, S9 5AB (21 components)

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Darnall Road Darnall Road +1 more S9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
23.97 MW
Land off Fordhouse Lane, Stirchley, Birmingham B30 3AG (3 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Stirchley B1 Stirchley B2 +1 more B30
Active • 2027-28 (T-4), 2026-27 (T-4)
7.80 MW
Land off Fordhouse Lane, Stirchley, Birmingham B30 3AG (3 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Active • 2027-28 (T-4), 2026-27 (T-4)
7.80 MW
Land Off Grey Friars Way, Stafford, ST16 2PE (16 components)

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Greyfriars Way Greyfriars Way Not Prequalified ST16
Active • 2028-29 (T-4), 2027-28 (T-4)
18.14 MW
Land off Hogshaw Road, Granborough, Buckingham, MK18 3NL (2 components)

Battery Storage Plant

Storage (Duration 2h) Storage (Duration 5h) EAST CLAYDON STORAGE LIMITED New Build Generating CMU East Claydon Storage Limited East Claydon Storage Limited Not Prequalified MK18
Active • 2028-29 (T-4), 2027-28 (T-4)
181.63 MW
Land off Kingston Road, Slimbridge, Stroud, Gloucestershire, England, GL2 7BN (1 component)

2 hour Battery Energy Storage System

Storage (Duration 2h) SLIMBRIDGE ENERGY LIMITED New Build Generating CMU Relay Slimbridge Not Prequalified GL2
Active • 2027-28 (T-4)
5.54 MW
Land off, Little Morton Farm, Little Morton, Retford, DN22 8BE (5 components)

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU 50MW Battery 2 Not Prequalified DN22
Active • 2025-26 (T-4)
19.60 MW
Land off Mansfield Road, Little Morton Farm, Little Morton, Retford, DN22 8HE (18 components)

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Mansfield Road Mansfield Road +1 more DN22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.97 MW
Land off Petre Street, Grimesthorpe, Sheffield, Yorkshire and the Humber, S4 8LU (24 components)

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Petre Street Petre Street +1 more S4
Active • 2028-29 (T-4), 2027-28 (T-4) ...
29.95 MW
Land off Saundercroft Road, Broadclyst, Devon, EX5 2PF (1 component)

Battery Storage Plant

Storage (Duration 2h) EXETER STORAGE LIMITED New Build Generating CMU Exeter Storage Limited EX5
Active • 2027-28 (T-4)
44.63 MW
Land off School Lane, Sittingbourne, Kent, ME9 8BY (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Sittingbourne B Not Prequalified ME9
Active • 2028-29 (T-4)
5.68 MW
Land Off Severn Road Hallen Bristol South Gloucestershire BS10 7SE (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU AVONMOUTH094 Rejected BS10
Active • 2028-29 (T-4)
14.66 MW
Land off Sir William Smith Road, Kirkton Industrial Estate, D11 3RD (1 component) Geocoding Needed

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU ARBROATH092 Rejected D11
Active • 2028-29 (T-4)
10.47 MW
Land off Stoke Lane, Norwich, NR14 8QD (3 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 50MW for a 1 hour duration installed on designated land within a compound at Wood Farm
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Norwich A Norwich B +1 more Not Prequalified NR14
Active • 2027-28 (T-4), 2025-26 (T-4)
30.73 MW
Land off Suttieside Road, Station Place Industrial Estate, North Whitehills, Forfar, Angus, Scotland, DD8 3NH (1 component)

2 hour Battery Energy Storage System

Storage (Duration 2h) SUTTIESIDE BATTERY LIMITED New Build Generating CMU Relay Suttieside Battery Not Prequalified DD8
Active • 2027-28 (T-4)
3.39 MW
Land off Walton Road, Drakelow, Derbyshire, DE15 9TX (1 component)

New-build energy storage site

Storage (Duration 2h) HARMONY DL LIMITED New Build Generating CMU Drakelow BESS Rejected DE15
Active • 2028-29 (T-4)
31.41 MW
Land off West Bromwich Street, Oldbury, West Midlands, B69 3AZ (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Rowley Regis Not Prequalified B69
Active • 2027-28 (T-4)
11.08 MW
Loading map...
Showing 25 locations