Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

553 unique locations (1600 components) - Page 13 of 23

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
23.10 MW
Land at Whitegate Substation, Broadgate, Oldham, OL9 9XA (3 components) Geocoding Needed
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant.
Reciprocating engines Storage (Duration 2h) HD144WHI LTD New Build Generating CMU Whitegate Whitegate +1 more OL9
Active • 2025-26 (T-4), 2024-25 (T-4) ...
83.08 MW
Land At Westerton Road, Keith, Moray, AB55 5NR (1 component) Geocoding Needed

CMU 24KEI4 is a battery storage CMU.

Storage (Duration 2h) FIELD KEITH LTD New Build Generating CMU Field Keith AB55
Active • 2028-29 (T-4)
7.23 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components) Geocoding Needed
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a gas power facility on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
817.08 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL (4 components) Geocoding Needed

Battery Storage Plant

Storage (Duration 2h) THURROCK STORAGE LIMITED New Build Generating CMU Thurrock Storage Limited Thurrock Storage Limited +2 more RM18
Active • 2027-28 (T-4), 2025-26 (T-1)
63.81 MW
Land at Vause Farm, Town Lane, Charnock Richard, Chorley, PR7 5HL (1 component) Geocoding Needed

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) SIRIUS ECODEV (VAUSE) LTD New Build Generating CMU Vause Farm Not Prequalified PR7
Active • 2025-26 (T-4)
7.95 MW
Land at Tuxton Farm, Plympton, Plymouth, PL7 5AA (1 component) Geocoding Needed

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Plympton Not Prequalified PL7
Active • 2026-27 (T-4)
7.08 MW
Land at the Risby Estate or in the vicinity of the Creyke Beck 400kV National Grid substation, Yorkshire, HU16 5SR (1 component) Geocoding Needed

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
19.83 MW
Land at the Risby Estate or in the vicinity of the Creyke Beck 400kV National Grid substation, Yorkshire, HU16 5SR (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CB BATTERY LIMITED New Build Generating CMU Creyke Beck 1 HU16
Active • 2025-26 (T-4)
Land at The Magazine, Hull Road, Selby, YO8 5BJ (24 components) Geocoding Needed
• Battery energy storage unit
• Battery storage unit
Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Hull Road Hull Road YO8
Active • 2028-29 (T-4), 2027-28 (T-4)
29.76 MW
Land at Sturts Farm, Three Cross Road, West Moors, Ferndown, BH21 6QU (1 component) Geocoding Needed

98MW / 196MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU STURTS FARM Not Prequalified BH21
Active • 2026-27 (T-4)
23.16 MW
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP (1 component) Geocoding Needed

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Storage (Duration 2h) R&S ENERGY LIMITED New Build Generating CMU Buxton BESS SK17
Active • 2026-27 (T-4)
2.48 MW
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component) Geocoding Needed

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Storage (Duration 2h) R&S ENERGY LIMITED New Build Generating CMU Buxton BESS SK17
Active • 2024-25 (T-1)
3.46 MW
Land at STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component) Geocoding Needed

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16MW, located in Buxton.

Storage (Duration 2h) R&S ENERGY LIMITED Existing Generating CMU Buxton BESS SK17
Active • 2025-26 (T-1)
3.73 MW
Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (2 components) Geocoding Needed

Lithium ion battery storage system capable of charging, storing and discharging electricity.

Active • 2028-29 (T-4), 2025-26 (T-1)
2.61 MW
Land at Sterte Avenue West, Poole, BH15 2AL (12 components) Geocoding Needed
• A 7.5MW Tesla Battery Energy Storage System
• A 7MW Battery Energy Storage System
• Tesla Battery Energy Storage System
Storage Storage (Duration 1h) Storage (Duration 2h) HARMONY HB LIMITED Existing Generating CMU HOLES BAY HOLESBAY +4 more BH15
Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.69 MW
Land at Somerford Farm, SN16 9RN (4 components) Geocoding Needed
• A Battery Energy Storage System
• A Battery Energy Storage System.
Storage (Duration 2h) Storage (Duration 8h) PD813ETY LTD PD688IRO LTD New Build Generating CMU Minety 3 Minety 3 +2 more SN16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
77.05 MW
Land at Smith Road, Wednesbury, WS10 0PD (2 components) Geocoding Needed
• New build generating battery storage unit.
• New build generating storage unit
Active • 2028-29 (T-4)
48.64 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components) Geocoding Needed
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Westhoughton
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Bolton0077 Bolton0078 +3 more Not Prequalified BL5
Active • 2027-28 (T-4), 2026-27 (T-4) ...
20.00 MW
Land at Rothienorman, Badenscoth, Aberdeenshire, Scotland, AB51 8XQ (1 component) Geocoding Needed

49.9 MW Grid connection Battery Storage site.

Active • 2026-27 (T-4)
9.93 MW
Land at Private Road No.5, Colwick Industrial Estate, Nottingham, NG4 2JU (6 components) Geocoding Needed

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO LIMITED New Build Generating CMU Private Road Battery Private Road Battery +1 more NG4
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.95 MW
LAND AT PRESTON FARM INDUSTRIAL ESTATE, OFF WESTLAND WAY, PRESTON FARM, TS18 3TG (1 component) Geocoding Needed

New-build energy storage site.

Storage (Duration 2h) HARMONY ST LIMITED New Build Generating CMU Stockton BESS TS18
Active • 2028-29 (T-4)
7.75 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components) Geocoding Needed

A Battery Energy Storage System.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
153.94 MW
Land at Ocker Hill Substation, Power Way, Tipton, DY4 0PW (3 components) Geocoding Needed
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant.
Reciprocating engines Storage (Duration 2h) HD143OCK LTD New Build Generating CMU Ocker Hill Ocker Hill +1 more DY4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
83.08 MW
Loading map...
Showing 25 locations