Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

553 unique locations (1600 components) - Page 14 of 23

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Land at Oaklands Farm Featherstone Lane, Wolverhampton, Staffordshire, WV10 7JZ (2 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Shareshill Shareshill WV10
Active • 2028-29 (T-4), 2027-28 (T-4)
19.09 MW
Land at Nineveh Farm, Nuneham Courtenay, Oxford OX44 9PA (1 component)

Lithium-based battery energy storage system

Storage (Duration 2h) COWLEY BALDON GREEN LIMITED New Build Generating CMU COWLEY OX44
Active • 2025-26 (T-1)
13.58 MW
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF (4 components)
• 49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
• 49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
• 49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
Storage (Duration 2h) Zenobe Wishaw Limited New Build Generating CMU Wishaw Wishaw +1 more ML2
Active • 2025-26 (T-4), 2024-25 (T-1) ...
49.66 MW
Land at Monk Fryston Substation, Rawfield Lane, Leeds, LS25 5JD (3 components)
• A Battery Energy Storage System
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant
Reciprocating engines Storage (Duration 2h) HD777FRY LTD New Build Generating CMU Fryston Fryston +1 more LS25
Active • 2025-26 (T-4), 2024-25 (T-4)
92.81 MW
Land At Mitchells Ind Park, Barnsley, S73 8HR (12 components)

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Mitchells Mitchells Not Prequalified S73
Active • 2028-29 (T-4), 2027-28 (T-4)
9.43 MW
Land at Mill Hill Substation, Partingdale Road, Barnet, NW7 1NT (3 components)

A Battery Energy Storage System.

Storage (Duration 2h) HB333MIL LTD New Build Generating CMU Mill Hill Mill Hill +1 more NW7
Active • 2027-28 (T-4), 2026-27 (T-4) ...
42.07 MW
Land at Midmill, Kintore, Aberdeenshire, AB51 0XB The located around 1.9km to the south of the centre of Kintore, on the western side of the A96 south of the Denhead Roundabout where the B987 leaves the A96.The site is bordered to the West by Sheriff (1 component)

Standalone battery energy storage project. The site will comprise of batteries, power conversion systems, transformers, switchgear,monitoring and control systems.

Storage (Duration 2h) GIGABOX NO 5 LIMITED New Build Generating CMU Broomhill BESS Not Prequalified AB51
Active • 2027-28 (T-4)
5.39 MW
Land at Lincomb Farm, Lincomb, Stourport-On-Severn, DY13 9RB (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Stourport0081 Not Prequalified DY13
Active • 2027-28 (T-4)
18.47 MW
Land at Legacy Substation, Bronwylfa Road, Legacy, Wrexham, LL14 4HY (3 components)
• A Battery Energy Storage System
• A gas fuelled generating station.
Reciprocating engines Storage (Duration 2h) HD639LEG LIMITED New Build Generating CMU Fryston Legacy +1 more LL14
Active • 2026-27 (T-4), 2025-26 (T-1) ...
76.08 MW
Land at Keithick Estate, PH13 9LZ (2 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) SIRIUS ECODEV (KEITHICK) LTD New Build Generating CMU Keithick Keithick Not Prequalified PH13
Active • 2026-27 (T-4), 2025-26 (T-4)
7.87 MW
land at Keelings Road, Southminster, CM0 7JF (4 components)
• New build generating CMU component known as Dengie BESS
• New build generating CMU component known as Dengie Solar Park
Solar Photovoltaic Storage (Duration 2h) BRITISH SOLAR RENEWABLES LIMITED New Build Generating CMU Dengie BESS Dengie Solar Park Not Prequalified CM0
Active • 2027-28 (T-4), 2025-26 (T-1)
3.33 MW
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ (21 components)

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Carlisle Road Carlisle Road +1 more S4
Active • 2028-29 (T-4), 2027-28 (T-4) ...
23.96 MW
Land at Jamesfield Farm, Abernethy, Fife, KY14 6EW (2 components)

A new build 19MW battery energy storage system

Active • 2025-26 (T-4), 2024-25 (T-1)
10.00 MW
Land at Iron Acton Substation, Larks Lane, Iron Acton, South Gloucestershire, BS37 9TX (2 components)

A Battery Energy Storage System.

Storage (Duration 2h) HD000ACT LTD New Build Generating CMU Fairholme Minety BS37
Active • 2027-28 (T-4), 2025-26 (T-4)
26.18 MW
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (2 components)
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant.
Reciprocating engines Storage (Duration 2h) HD000ACT LTD New Build Generating CMU Iron Acton Iron Acton 2 Rejected BS37
Active • 2027-28 (T-4), 2024-25 (T-4)
58.30 MW
Land at Inchbean Farm, Kilmarnock, East Ayrshire, KA1 5JP (1 component)

The CMU component is an energy storage system comprised of lithium ion batteries and associated infrastructure.

Storage (Duration 2h) BSSL EAST AYRSHIRE 1 LTD New Build Generating CMU Inchbean Not Prequalified KA1
Active • 2028-29 (T-4)
8.80 MW
Land at Impens Farm, Petherton Road, North Newton, Bridgwater, Somerset, TA7 0BB (2 components)

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU BRIDGWATER 2 WEST BURTON TA7
Active • 2026-27 (T-4)
23.35 MW
Land at Hydes Lane, Hinckley, LE10 3DP (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
16.07 MW
Land at Hooks Hole, Chestnut Street, Sittingbourne, Kent, ME9 8DA (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Sittingbourne BESS Not Prequalified ME9
Active • 2027-28 (T-4)
3.84 MW
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP, (4 components)

This is a 20MW battery storage facility connected at 33kV. (3)

Storage (Duration 2h) Storage (Duration 1.5h) HAWKERS HILL ENERGY PARK LIMITED New Build Generating CMU Hawkers Hill Hawkers Hill +2 more SP7
Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.71 MW
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP (4 components)

This is a 20MW battery storage facility connected at 33kV.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
27.83 MW
Land at Harrow Lane, Bulphan, Thurrock, Essex RM14 3RE (2 components)

Lithium-based battery energy storage system.

Storage (Duration 2h) WARLEY GREEN LIMITED New Build Generating CMU WARLEY RM14
Active • 2025-26 (T-1), 2024-25 (T-1)
24.91 MW
Land at Guilsborough Lodge Farm, West Haddon Road, Guilsborough, Northampton, NN6 8QE (1 component)

A standalone 0.949MW Battery Energy Storage System connected directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 1 Not Prequalified NN6
Active • 2025-26 (T-1)
0.26 MW
Land at Gagie Home Farm Holdings, Tealing, DD5 3PP (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) SIRIUS ECODEV (TEALING) LTD New Build Generating CMU Tealing Not Prequalified DD5
Active • 2025-26 (T-4)
31.78 MW
Loading map...
Showing 25 locations