Storage (Duration 2h)

343 unique locations (1286 components) - Page 14 of 14

Unit 1, Brindley Close, Cheney Manor Industrial Estate, Swindon, SN2 2YW (3 components)

12MW 24MWh battery storage located at Brindley Close in Swindon

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2025-26 (T-4)
Uskmouth Power Station West Nash Road, Nash, Newport, Wales, NP18 2BZ (1 component)

AW1 Energy Storage Limited (AW1) will develop a Battery Energy Storage System (BESS) at land adjacent to the substation and will initially develop a 120 MW / 240 MWh BESS …

Active • 2028-29 (T-4)
20.10 MW
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (3 components)
• New build 49.995MW / 99.990 MWh battery energy storage system.
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared grid connection.
Active • 2027-28 (T-4), 2025-26 (T-1)
6.52 MW
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (2 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
31.34 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (15 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2024-25 (T-4), 2023-24 (T-1) ...
25.17 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• A gas fuelled generating station.
• Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
10.64 MW
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
7.09 MW
Welwyn Power, Tewin Road, Welwyn Garden City, AL7 1BH (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2026-27 (T-4)
1.18 MW
Westfield Road, Carlton, Wakefield, WF3 3RJ (1 component)

Battery energy storage system

Active • 2028-29 (T-4)
10.45 MW
West House Farm, Scruton, Northallerton, DL7 0RQ (1 component)

18MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

Active • 2028-29 (T-4)
3.77 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
8.98 MW
West of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
8.03 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (4 components)
• New build generating CMU component - Whaddon Farm BESS
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park.
Active • 2027-28 (T-4), 2024-25 (T-1)
1.99 MW
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (5 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
2.69 MW
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (3 components)
• Two duration battery storage
• Two hour duration battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.33 MW
Loading map...
Showing 18 locations