Storage (Duration 2h)

553 unique locations (1600 components) - Page 15 of 23

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Land at Gagie Home Farm Holdings, Tealing, DD4 0PR (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) SIRIUS ECODEV (TEALING) LTD New Build Generating CMU Tealing Not Prequalified DD4
Active • 2026-27 (T-4)
7.56 MW
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (19 components)
• Battery storage unit
• New reciprocating gensets in acoustic enclosure
• Reciprocating gensets in acoustic enclosure
Reciprocating engines Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Fulwood Rd Fulwood Road - Battery +2 more NG17
Active • 2025-26 (T-4), 2023-24 (T-4) ...
23.78 MW
Land at Frodo Solar Farm, Moss-side, Crimond, Fraserburgh, Grampian, AB43 8YH (1 component)

New Build CMU comprising of battery storage and associated plant.

Storage (Duration 2h) LEL FRODO BATTERY LIMITED New Build Generating CMU Frodo AB43
Active • 2026-27 (T-4)
2.36 MW
Land at Finns Barn, Wellow Road, Eakring, Newark, NG22 0FW (1 component)

A standalone 0.949MW BESS connected directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 1 Not Prequalified NG22
Active • 2025-26 (T-1)
0.26 MW
Land at Fairholme, SN16 9PW (2 components)

A Battery Energy Storage System.

Storage (Duration 2h) HB222BRI LTD New Build Generating CMU Minety 5 Minety 5 Not Prequalified SN16
Active • 2026-27 (T-4), 2025-26 (T-4)
30.10 MW
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
41.91 MW
LAND AT DUNHAMS LANE, LETCHWORTH GARDEN CITY, SG6 1JH (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
2.46 MW
Land at Dunhams Lane, Letchworth Garden City, SG6 1JH (2 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Letchworth Power SG6
Active • 2026-27 (T-4), 2025-26 (T-4)
2.00 MW
Land at Duddingston, Newton, West Lothian, EH30 9SN (1 component)

20MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

Storage (Duration 2h) TOTLEYWELLS NET ZERO LIMITED New Build Generating CMU Aithrie Net Zero BESS EH30
Active • 2028-29 (T-4)
4.19 MW
LAND AT DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB (Nearest Postcode: SS11 8UA). (9 components)

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 3h) DOLLYMANS STORAGE LIMITED New Build Generating CMU Dollymans Storage Dollymans Storage +4 more SS11
Active • 2025-26 (T-4), 2024-25 (T-4) ...
162.73 MW
Land at Devilla Forest, Near Culross, Fife, KY12 8EW (2 components)
• New Build Battery Storage
• New build battery storage
Storage (Duration 2h) ALCEMI STORAGE DEVELOPMENTS 3 LIMITED New Build Generating CMU DEVILL DevillaSupplemental KY12
Active • 2028-29 (T-4), 2027-28 (T-4)
61.83 MW
Land at Davies Road, Blackburn, Lancashire BB1 3HR (2 components)
• CMU ID 22WHI4, a new build battery storage CMU
• CMU ID 24WHI1, a new build battery storage CMU
Storage (Duration 2h) FIELD WHITEBIRK LTD New Build Generating CMU Whitebirk Whitebirk BB1
Active • 2026-27 (T-4), 2025-26 (T-1)
11.12 MW
Land at Crown Farm, adjacent to Walpole Bank Road, Walpole, PE14 7JA (2 components)
• CMU ID 22KIN4, a new build battery storage CMU
• CMU ID 23KIN4, a new build battery storage CMU
Storage (Duration 2h) Storage (Duration 9h) TALSIE CROWN BESS LIMITED New Build Generating CMU Kings Lynn Kings Lynn Not Prequalified PE14
Active • 2027-28 (T-4), 2026-27 (T-4)
32.75 MW
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (3 components)
• A New Build Gas fuelled power plant at Kirkby substation.
• A New Build Transmission Connected Battery Energy Storage System.
Reciprocating engines Storage (Duration 2h) KIRKBY BATTERY STORAGE LTD New Build Generating CMU KIRKBY Kirkby BESS L33
Active • 2027-28 (T-4), 2023-24 (T-4) ...
54.63 MW
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (5 components)
• A New Build Battery Energy Storage System
• A New Build Gas fuelled power plant at Capenhurst substation
Reciprocating engines Storage (Duration 2h) HD888CAP LIMITED New Build Generating CMU CAPENHURST CAPENHURST +2 more CH66
Active • 2025-26 (T-4), 2024-25 (T-4) ...
129.72 MW
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• A new build battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT BF LIMITED New Build Generating CMU BUMPERS BUMPERS +7 more HP27
Active • 2026-27 (T-4), 2025-26 (T-4) ...
164.41 MW
Land at Brook Farm, 90 High Street, Loscoe, DE75 7LJ (14 components)

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Brook Farm Brook Farm DE75
Active • 2028-29 (T-4), 2027-28 (T-4)
14.52 MW
Land at Broken Cross, S Lanarkshire, ML11 9PB (2 components)
• New Build Battery Storage
• New build battery storage
Storage (Duration 2h) ALCEMI STORAGE DEVELOPMENTS 6 LIMITED New Build Generating CMU COALB2 Coalburn2Supplemental ML11
Active • 2028-29 (T-4), 2027-28 (T-4)
61.83 MW
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (6 components)
• A new build 10MW battery storage system
• A new build 11MW battery storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT BD LIMITED New Build Generating CMU BROADDITCH BROADDITCH +3 more DA13
Active • 2025-26 (T-4), 2024-25 (T-4) ...
19.42 MW
Land at Boreham Street Farm, Boreham Street, Hailsham, Sussex, BN27 4SJ (1 component)

A Battery Energy Storage System

Storage (Duration 2h) PD100NIN LTD New Build Generating CMU Ninfield Not Prequalified BN27
Active • 2025-26 (T-4)
39.25 MW
Land at Blackhill Quarry, Exeter, EX5 1JL (1 component)

44.1MW battery energy storage system with matching import and export capability

Active • 2027-28 (T-4)
6.79 MW
Land at Blackhill Quarry Exeter EX5 1JL (1 component)

44.1MW battery energy storage system with matching import and export capability

Storage (Duration 2h) LIVERTON BUSINESS PARK 2011 LIMITED New Build Generating CMU Blackhill Quarry Rejected EX5
Active • 2027-28 (T-4)
6.79 MW
Land At Bishops Bowl Fishery Stratford-upon-Avon CV47 2SR (14 components)

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Bishops Bowl Bishops Bowl CV47
Active • 2028-29 (T-4), 2027-28 (T-4)
14.52 MW
Land at Birkin Lane, Grassmoor, Chesterfield, S42 5BP (1 component)

A 2 hour BESS connected directly to the DNO network

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 3 Not Prequalified S42
Active • 2025-26 (T-1)
0.26 MW
Land at Birkhill Commercial Park, Coalburn, S Lanarkshire, ML11 0FT (3 components)
• New Build Battery Storage
• New build battery storage
Storage (Duration 2h) ALCEMI STORAGE DEVELOPMENTS 4 LIMITED New Build Generating CMU COALB1 COALB1 +1 more ML11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
197.67 MW
Loading map...
Showing 25 locations