Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

553 unique locations (1600 components) - Page 16 of 23

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Land at Bilbo Farm, Crimond, Fraserburgh, AB43 8YP (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) LEL BILBO BATTERY LIMITED New Build Generating CMU Bilbo AB43
Active • 2025-26 (T-4)
9.93 MW
Land at Axminster Substation, Pound Road, Axminster, Devon, EX13 5RX (4 components)
• A Battery Energy Storage System
• A Battery Energy Storage System.
Storage (Duration 2h) HB825AXM LTD HB411MIN LTD New Build Generating CMU Axminster Axminster +2 more Not Prequalified EX13
Active • 2027-28 (T-4), 2026-27 (T-4) ...
63.56 MW
Land at Armshead Farm, Armshead Road, Werrington, Staffordshire, ST9 0NB (2 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Cellarhead Cellarhead Not Prequalified ST9
Active • 2028-29 (T-4), 2027-28 (T-4)
27.04 MW
Land at Armshead Farm, Armshead Road, Werrington, ST9 0NB (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Cellarhead Not Prequalified ST9
Active • 2026-27 (T-4)
14.18 MW
LAND AND BUILDINGS ON THE SOUTH EAST SIDE AND ON THE NORTH WEST SIDE OF CRANBORNE ROAD, POTTERS BAR, EN6 3JF (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
2.46 MW
LAND AND BUILDINGS ON THE SOUTH EAST SIDE AND ON THE NORTH WEST SIDE OF CRANBORNE ROAD POTTERS BAR EN6 3JF (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Cranborne Power Not Prequalified EN6
Active • 2024-25 (T-4)
Land and buildings lying to the East and West of Swinderby Road, Eagle and Swinethorpe being part of the Eagle Hall Estates, LN6 9JA (1 component)

A 2 hour BESS connected directly to the DNO network

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 5 Not Prequalified LN6
Active • 2025-26 (T-1)
0.26 MW
Land adjoining Outclough Farm, Chatterley, Whitfield, Biddulph Road, Stoke on Trent, ST6 8UW (1 component)

The construction of a new build Battery Energy Storage System (BESS) will comprise of a number of new Batteries supplied by Trina Storage Elementa 2.0 solution and associated equipment required …

Storage (Duration 2h) CHATTERLEY ENERGY STORAGE LIMITED New Build Generating CMU Chatterley ST6
Active • 2028-29 (T-4)
10.45 MW
LAND ADJOINING BATES ROAD, QUAYSIDE INDUSTRIAL ESTATE, MALDON, CM9 5FA (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
2.46 MW
LAND ADJOINING BATES ROAD QUAYSIDE INDUSTRIAL ESTATE MALDON CM9 5FA (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Bates Power Not Prequalified CM9
Active • 2024-25 (T-4)
Land Adjacent Unit 66, Gravelly Industrial Park, Walker Dr, Birmingham, B24 9AW (1 component)

The CMU is a new build 50MW/100MWh battery storage facility connected to the Western Power distribution network at 33kV, located at the Gravelly Industrial Park, Birmingham.

Active • 2026-27 (T-4)
11.58 MW
Land adjacent to Worset Lane, Hart. TS27 3BL (1 component)

Battery Energy Storage System connecting into the Hartmoor GSP, to connect into the Transmission system via new bay.

Storage (Duration 2h) FIELD HARTMOOR LTD New Build Generating CMU TS27
Active • 2028-29 (T-4)
35.47 MW
LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX (4 components)
• Battery Energy Storage System
• Energy Storage Site
• New Build 33 MW Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HEIT WG LIMITED New Build Generating CMU Wormald Green BESS Wormald Green ESS +1 more HG3
Active • 2026-27 (T-4), 2025-26 (T-1) ...
30.43 MW
Land adjacent to Taunton GSP Substation, Taunton, Somerset, TA4 1AG (2 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Taunton Taunton TA4
Active • 2028-29 (T-4), 2027-28 (T-4)
13.41 MW
Land adjacent to Taunton GSP Substation, TA4 1AG (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
7.09 MW
Land adjacent to SSE ( South West to) substation on B9134 Old Brechin Road, Forfar. DD8 3DX (1 component)

"49.9 MW standalone battery energy storage project. The site will comprise of batteries, power conversion systems, transformers, switchgear,monitoring and control systems."

Active • 2027-28 (T-4)
5.39 MW
Land adjacent to Salisbury Substation, Salisbury, SP2 0BL (1 component)

49.5MW Battery Energy Storage System

Storage (Duration 2h) SSE BATTERY SALISBURY LIMITED New Build Generating CMU Not Prequalified SP2
Active • 2024-25 (T-4)
24.07 MW
Land adjacent to Norrington Common BSP, Norrington Lane, Broughton Gifford, Melksham, Wiltshire, SN12 8LT (2 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Norrington Common Norrington Common Not Prequalified SN12
Active • 2028-29 (T-4), 2027-28 (T-4)
6.71 MW
Land adjacent to Norrington Common BSP, Norrington Lane, Broughton Gifford, Melksham, SN12 8LT (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Norrington Common Not Prequalified SN12
Active • 2026-27 (T-4)
3.59 MW
Land Adjacent to No 13 Westerton Road, Keith, Moray, Scotland, AB55 5FA (2 components)

50MW of BESS to be installed within existing Rotating Stabiliser site.

Active • 2026-27 (T-4), 2025-26 (T-4)
28.35 MW
Land Adjacent to No 13 Westerton Road Keith, Moray, Scotland AB55 5FA (2 components)

50MW of BESS to be installed within existing Rotating Stabiliser site. (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
8.48 MW
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (4 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• 49.9MW Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY (PW) 2 LIMITED New Build Generating CMU PILLSWOOD2 PILLSWOOD2 +2 more HU16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
84.42 MW
Land adjacent to Berryburn Substation Moray (1 component) Geocoding Needed

Corshellach Energy Storage Limited is planning to install a 2-hr battery storage system.

Storage (Duration 2h) CORSHELLACH ENERGY STORAGE LIMITED New Build Generating CMU Corshellach
Active • 2028-29 (T-4)
7.41 MW
Land Adjacent to Belfield Substation, Belfield Road, Rochdale, Manchester, OL16 2XX (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Rochdale Not Prequalified OL16
Active • 2026-27 (T-4)
3.97 MW
Land Adjacent to Belfield Substation, Belfield Road, Rochdale, Manchester, Greater Manchester, OL16 2XX (2 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Rochdale Rochdale Not Prequalified OL16
Active • 2028-29 (T-4), 2027-28 (T-4)
7.62 MW
Loading map...
Showing 25 locations