Storage (Duration 2h)
502 unique locations (1690 components) - Page 19 of 21
St Owens Cross, Peterstow, Hereford, HR9 6AU (1 component)
A lithium-ion Energy Storage Plant
St Philips energy storage facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)
New Build CMU comprising of battery storage and associated plant (2)
St Philips Energy Storage Facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (1 component)
New Build CMU comprising of battery storage and associated plant
Surteco UK Ltd, Widow Hill Road, Burnley, BB10 2TB (1 component)
New Build CMU comprising of battery storage and associated plant
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (5 components)
Tees Dock Road Redcar and Cleveland Tees Valley England TS6 7AB (1 component)
A new build 100MW/200MWh battery storage facility connected to the Transmission network, located in Teesworks, Redcar
Templeton Farm, Birkhill, Dundee, Scotland. DD3 0QH (1 component)
A 2-hour duration containerized battery
The Common, Malmesbury, SN16 9RJ (2 components)
The fields close to The Cottage, The Priory, Priory Lane, Little Wymondley, Hitchin, SG4 7HD (1 component)
WYBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).
The fields close to the Land at Little Hale Drove, Sleaford, NG34 9BG, United Kingdom (1 component)
LHBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).
The Hollies Croft Skegness Lincolnshire PE24 4SH (1 component)
20MW-40MWh Battery Energy Storage system. Number of Inverters/skid: 6 x 3950kVA UP-XT/MVPS 4600S2 @ 25C Number of Electric combiner Box: 12 Number of battery box: 24
The land at Rownall Hall Farm, Rownall Road, Wetley Rocks, Stoke-on-Trent, ST9 0BS (1 component)
Battery energy storage facility with a 2 hour duration and a maximum capacity of 300MW, located in Stoke.
The land South-West of the Dunoon Electrical Substation located on Ardnadam Farm, Sandbank, Dunoon, Argyll and Bute, PA23 8PN (2 components)
Battery energy storage system, together with associated equipment, infrastructure and ancillary works. (2)
the land to the south west of Middleton Road, Middleton, Morecambe extending to approximately 3 acres (1 component)
75.00 MW of Battery Energy Storage Units with associated infrastructure.
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)
A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is … (3)
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
The Manorway, Stanford-leHope, SS17 9LL (5 components)
The Wagon Hovel, The Borrows, Sibthorpe, Newark, NG23 5LU (1 component)
A 2 hour BESS connecting directly to the DNO network.
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (11 components)
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (4 components)
New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
Tillingdown Lane, Caterham, CR3 7JA (2 components)
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (4 components)
Titchfield Lane, Wickham, Fareham PO15 6DY (3 components)
CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System) (3)
Todrig Farm Coldstream TD12 4JA (5 components)
A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and … (2)
Tredington Fields Farm, Claydon Solar B, Tredington, Tewkesbury, GL20 7BS (2 components)
Battery Storage (2)