Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

521 unique locations (1480 components) - Page 2 of 21

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
B970, Boat of Garten, Highland, Scotland, PH24 3BY, United Kingdom (1 component)

New build 49.9MW / 99.8MWh battery energy storage system

Active • 2027-28 (T-4)
4.62 MW
Barleylands Barleylands Road Billericay Essex CM11 2UD (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU RAYLEIGH 2 Not Prequalified CM11
Active • 2026-27 (T-4)
11.67 MW
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Storage (Duration 1h) Storage (Duration 2h) CONRAD (TORQUAY) LIMITED New Build Generating CMU Barton Hill Torquay +4 more TQ2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.74 MW
Basingstoke Energy Storage Facility, Basing Road, Old Basing, Basingstoke, Hampshire, RG24 7AL (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Storage (Duration 2h) CONRAD (BASINGSTOKE) LIMITED New Build Generating CMU Basingstoke Basingstoke +1 more RG24
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.71 MW
Beeston Park Farm, Ridge End Fold, Marple, Stockport, SK6 7EX (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Beeston Not Prequalified SK6
Active • 2025-26 (T-4)
Bengrove Farm, Base Lane, Sandhurst, Gloucestershire, GL2 9NU (1 component)

CMU ID 22BEN4, a new build battery storage CMU

Storage (Duration 2h) BENGROVE BESS LTD New Build Generating CMU Bengrove Farm Not Prequalified GL2
Active • 2026-27 (T-4)
8.66 MW
Bickley Solar Farm, Bickley Solar Farm, Albrighton, Wolverhampton, WV7 3AT (1 component)

This CMU component represents the BESS system of a co-located (solar and storage) site

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Pattingham BESS WV7
Active • 2027-28 (T-4)
0.83 MW
Birch Road, Colchester CO2 0EJ (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site (2)

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Layer 2 BESS Layer 2 BESS CO2
Active • 2027-28 (T-4), 2025-26 (T-1)
10.68 MW
Blandford Road, Poole, BH16 6AB (4 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR BLANDFORD ROAD LIMITED New Build Generating CMU Poise 1 Poise 1 +1 more BH16
Active • 2026-27 (T-4), 2025-26 (T-1) ...
23.04 MW
Boot Lane, Sandbach, Cheshire CW11 3PY (2 components)
• 20MW of Battery Energy Storage Systems
• 26.000MW of Reciprocating Engines
Active • 2025-26 (T-4)
Braehead Farm Riccarton Kilmarnock KA1 5LN (4 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land, approximately 250 Metres north of Kilmarnock Substation. …

Storage (Duration 2h) KILMARNOCK ENERGY CENTRE LIMITED New Build Generating CMU Kilmarnock Energy Centre Limited Not Prequalified KA1
Active • 2028-29 (T-4)
71.20 MW
Bristol Avenue, Blackpool, FY2 0JF (7 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Battery Storage Storage (Duration 1h) Storage (Duration 2h) CONRAD (BLACKPOOL) LIMITED New Build Generating CMU Blackpool Blackpool +3 more FY2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
24.11 MW
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (2 components)
• 2 hr duration Battery Energy Storage System located in England
• Energy Storage Facility
Storage (Duration 1h) Storage (Duration 2h) CHAPEL LANE ENERGY STORAGE LIMITED New Build Generating CMU Chapel Lane ES Chapel Lane ES WS9
Active • 2028-29 (T-4), 2026-27 (T-4)
14.62 MW
BSB Transport Ltd Trondheim Way, Redwood Park Estate, Stallingborough, Grimsby, North East Lincolnshire, DN41 8FD. (4 components)

A Battery Energy Storage System. (3)

Storage (Duration 2h) KXP IMMINGHAM LIMITED New Build Generating CMU Immingham Immingham +2 more Not Prequalified DN41
Active • 2026-27 (T-4), 2025-26 (T-1) ...
77.66 MW
Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH (1 component)

Two hour duration battery storage

Active • 2028-29 (T-4)
12.56 MW
Bumpers 1 BESS, Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A battery energy storage system

Storage (Duration 2h) HEIT BF LIMITED Existing Generating CMU Bumpers 1 HP27
Active • 2025-26 (T-1)
12.73 MW
Bumpers 2 BESS, Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A new build battery energy storage system

Storage (Duration 2h) HEIT BF LIMITED New Build Generating CMU Bumpers 2 ESS HP27
Active • 2024-25 (T-1)
11.11 MW
Bumpers 2 BESS, Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A battery energy storage system

Storage (Duration 2h) HEIT BF LIMITED Existing Generating CMU Bumpers 2 HP27
Active • 2025-26 (T-1)
12.73 MW
Bumpers Farm Phase 2, Princes, Risborough, HP27 9RE (1 component)

Battery Storage Plant

Storage (Duration 2h) GRESHAM HOUSE SOLAR DISTRIBUTION LLP New Build Generating CMU Bumpers BESS HP27
Active • 2027-28 (T-4)
0.46 MW
Burton Enterprise Park Hawkins Lane Burton upon Trent Staffordshire DE14 1QG (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU BURTON086 DE14
Active • 2028-29 (T-4)
5.24 MW
Burton Green Farm, Hobs Lane, Kenilworth, Warwickshire, CV8 1QB (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Burton Green Burton Green Not Prequalified CV8
Active • 2028-29 (T-4), 2027-28 (T-4)
27.04 MW
Calow Green, Calow, North East Derbyshire, S44 5XQ (8 components)

A stand alone Battery Energy Storage System. (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
53.52 MW
Calow Green, Calow, S44 5XQ (3 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 005 LIMITED New Build Generating CMU Calow Green Calow Green +1 more Not Prequalified S44
Active • 2026-27 (T-4)
53.16 MW
Carnegie Road, Stoneycroft, Liverpool, Merseyside, Liverpool City Region, L13 7GD (1 component)

Standalone battery energy storage system

Storage (Duration 2h) CARNEGIE (BES) LTD New Build Generating CMU QENER1_CANERGIE L13
Active • 2026-27 (T-4)
9.93 MW
Loading map...
Showing 25 locations