Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

362 unique locations (1367 components) - Page 2 of 15

Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH (2 components)

Two hour duration battery storage

Active • 2028-29 (T-4)
25.13 MW
Bumpers 1 BESS, Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A battery energy storage system

Active • 2025-26 (T-1)
12.73 MW
Bumpers 2 BESS, Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A new build battery energy storage system

Active • 2024-25 (T-1)
11.11 MW
Bumpers 2 BESS, Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A battery energy storage system

Active • 2025-26 (T-1)
12.73 MW
Burton Enterprise Park Hawkins Lane Burton upon Trent Staffordshire DE14 1QG (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
10.47 MW
Burton Green Farm, Hobs Lane, Kenilworth, Warwickshire, CV8 1QB (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
47.89 MW
Calow Green, Calow, North East Derbyshire, S44 5XQ (4 components)

A stand alone Battery Energy Storage System.

Active • 2028-29 (T-4), 2027-28 (T-4)
26.23 MW
Castlelaurie Industrial Estate, Bankside, Falkirk FK2 7XF (2 components)

New build battery storage

Active • 2028-29 (T-4)
15.33 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (8 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
75.39 MW
Chesterfield Road, Sheffield, West Yorkshire, S26 4XB (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
9.68 MW
Chesterfield Road, Swallownest, Sheffield, S26 4SX (3 components)
• Gas fired reciprocating engines
• New Build Generating CMU comprising of battery storage and associated plant.
Active • 2026-27 (T-4), 2021-22 (T-4)
2.84 MW
Childerley Farm, Dry Drayton, Cambridgeshire, United Kingdom, CB23 8BA (1 component)

New build BESS alongside new build solar farm.

Active • 2028-29 (T-4)
6.20 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (16 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
91.05 MW
Clay Tye Road, Upminister, RM14 3PL (11 components)
• 48MW Battery Energy Storage facility connected to 132kv network
• 49.5MW Battery Energy Storage facility connected to 132kv network
Active • 2025-26 (T-4), 2024-25 (T-4) ...
100.45 MW
Coal Aston, Dronfield, S18 3AA (3 components)
• A 45MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
37.63 MW
Cooklands farm, Old Snydale, Pontefract, WF7 6HA (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.47 MW
Coxhall Power, Coxhall Road, Tattingstone, Ipswich, IP9 2NH (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2026-27 (T-4)
1.18 MW
Dadglow Farm, Bishops Itchington, Southam, CV47 2SW (1 component)

A 20MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
4.19 MW
Deep Lane BESS, Plympton, Devon, PL7 5AA (4 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4)
9.09 MW
Dig Gate Lane, Lady House, Milnrow, Rochdale, Greater Manchester, England, OL16 4NR (2 components)
• A Distribution Connected Battery Energy Storage System.
• A Distribution Connected gas fueled generating station.
Active • 2028-29 (T-4)
10.40 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (113 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5209.30 MW
Dolphingstone Farm, Cockenzie, East Lothian, EH21 8GW (1 component)

The CMU component is an energy storage system comprised of lithium ion batteries with associated infrastructure

Active • 2028-29 (T-4)
9.21 MW
Dounreay, Thurso KW14 7RE (3 components)
• A 34MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
28.43 MW
Dunbar BESS, Dunbar, East Lothian, EH42 1RG, Scotland, UK (1 component)

Total Connection capacity of 49.99MW for Energy Storage. The component will be LFP BESS.

Active • 2028-29 (T-4)
8.17 MW
Loading map...
Showing 25 locations