Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (18 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Inactive •
Clay Tye Road, Upminister, RM14 3PL (13 components)
• 48MW Battery Energy Storage facility connected to 132kv network
• 49.5MW Battery Energy Storage facility connected to 132kv network
Inactive •
Cooklands farm, Old Snydale, Pontefract, WF7 6HA (1 component)

A 50MW Distribution Connected Battery Energy Storage System

ROOT-POWER (NORTH) LIMITED Not Prequalified
Inactive •
Coxhall Power, Coxhall Road, Tattingstone, Ipswich, IP9 2NH (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Inactive •
Deep Lane BESS, Plympton, Devon, PL7 5AA (4 components)

New Build CMU comprising of battery storage and associated plant

Inactive •
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (125 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Inactive •
Dounreay, Thurso KW14 7RE (3 components)
Inactive •
Duniface Farm, Windygates, Fife, KY8 5RH (1 component)

New build Battery Energy Storage CMU

Inactive •
Dunkeswell Power Generation Plant, Unit 24A, Flightway, Dunkeswell Business Bark, Honiton, Devon, EX14 4LG (1 component)

New Build CMU comprising of battery storage and associated plant

Inactive •
East Tarelgin Farm, Ayr, KA6 6NF (6 components)
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Inactive •
Elvanfoot BESS, Leadhills Road, Elvanfoot, ML12 6TE (1 component)

circa 10MW 2hr lithium Ion battery system connected at 33kV to the SPT transmission system

Inactive •
Emmers Farm, Holt Road, BH21 7HJ (6 components)

2h-duration battery system

Inactive •
Farnham Battery Storage, Wrecclesham Hill, Farnham, GU10 4JU (4 components)

A new build 20MW battery energy storage system

Inactive •
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (1 component)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.

Inactive •
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (1 component)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.

Inactive •
Former Scrap Yard, Town Lane, Charnock Richard, Chorley, PR7 5HQ (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Inactive •
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (4 components)

CMU to comprise multiple individual storage units metered and despatched centrally

Inactive •
Greenfield site, Stainton, Rotherham, S66 7RQ (1 component)

Battery Storage 2 hour duration

Inactive •