Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

159 unique locations (343 components) - Page 2 of 7

Selby, North Yorkshire, YO8 6PG (2 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
25.07 MW
Sanquhar II, Sanquhar, Dumfries and Galloway. DG4 6LJ (1 component)

New Build Generation CMU - Battery Energy Storage System.

Active • 2028-29 (T-4)
18.22 MW
Sanquhar II Sanquhar Dumfries and Galloway DG4 6LF (1 component)

250 MW 2h BESS (on Day 1) that is entered at 217 MW 2h to account for degradation through 15year life.

Active • 2027-28 (T-4)
33.40 MW
Ryton Industrial Estate Blaydon NE21 4NT (1 component)

2 hour containerised battery storage

Active • 2028-29 (T-4)
10.47 MW
19.06 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1118.24 MW
Riversdale Way, Lemington, Newcastle upon Tyne, North of Tyne, England, NE15 8SF (1 component)

A Distribution Connected Battery Energy Storage System.

Active • 2028-29 (T-4)
10.45 MW
Ravensroost Road, Minety, Malmesbury, Wiltshire, SN16 9RJ (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4)
16.09 MW
9.42 MW
Plot 4A, Hurlawcrook Road, East Kilbride, Glasgow G75 0ZZ (1 component)

A distribution connected New Build Battery Energy Storage System

Active • 2028-29 (T-4)
4.19 MW
Plot 10 Dunnikier Business Park Midfield Drive Mitchelston Industrial Estate Kirkcaldy Fife KY1 3LW (2 components)

BATTERY STORAGE UNIT WITH 13.5 MWh energy supply and 20 MW power capacity

Inactive • 2022-23 (T-4), 2021-22 (T-4)
10.37 MW
Newburth, Perth, Scotland, KY14 6EW (1 component)

Storage battery 2h duration

Active • 2028-29 (T-4)
13.61 MW
Napoleon Solar Farm, Tonbridge, TN12 6SS (1 component)

This CMU component represents a stand-alone BESS system

Active • 2027-28 (T-4)
2.06 MW
Mount Stamper Road, St Austell, Cornwall, PL25 5QP (1 component)

New-Build Li-Ion BESS, 2hr duration.

Active • 2028-29 (T-4)
2.09 MW
McQuittiston Farm, A70, Ochiltree, East Ayrshire, Scotland, KA6 6NF (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
6.26 MW
Malton Road, Malton YO17 8JF (1 component)

A 40MW new build of battery storage unit.

Active • 2027-28 (T-4)
6.16 MW
Lowfields Way, Lowfields Business Park, HX5 9DA (6 components)
• BATTERY STORAGE PLANT
• New build battery storage
• New build generating storage unit
Active • 2028-29 (T-4), 2025-26 (T-4) ...
15.71 MW
32.32 MW
Latteridge Lane, Iron Acton, Tytherington, South Gloucestershire, West of England, England, BS35 3TF (2 components)

A Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
20.73 MW
Lark's Lane, Iron Acton, Latteridge, South Gloucestershire, West of England, England, BS37 9TX (1 component)

A Distribution Connected Battery Energy Storage System.

Active • 2028-29 (T-4)
20.94 MW
Land West Of Slack Lane, Westhoughton, Bolton, BL5 3LB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
6.28 MW
Land West Of Slack Lane, Westhoughton, Bolton BL5 3LB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
3.14 MW
Land West Of Kegworth Road, Ratcliffe On Soar, Nottinghamshire,NG11 0EA (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
20.92 MW
Loading map...
Showing 25 locations