Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (3 components)
• New build 49.995MW / 99.990 MWh battery energy storage system. (2)
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared grid connection.
Active • 2027-28 (T-4), 2025-26 (T-1)
14.67 MW
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (2 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Wadsworth Wadsworth 2 Rejected DL14
Active • 2028-29 (T-4)
31.34 MW
Wansborough Paper Mill, Watchet, Somerset, TA23 0AY (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (WATCHET) LIMITED New Build Generating CMU Watchet TA23
Active • 2027-28 (T-4)
1.64 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (9 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Storage Storage (Duration 1h) Storage (Duration 2h) HARMONY CS LIMITED New Build Generating CMU CONTEGO CONTEGO +3 more BN6
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment. (2)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Reciprocating engines Storage (Duration 2h) STOR 108 LTD HAMILTON LANE POWER LIMITED New Build Generating CMU Hamilton Hamilton +3 more OL4
Active • 2026-27 (T-4), 2024-25 (T-1) ...
25.00 MW
Welwyn Power, Tewin Road, Welwyn Garden City, AL7 1BH (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Welwyn Power Not Prequalified AL7
Active • 2026-27 (T-4)
1.18 MW
Westfield Road, Carlton, Wakefield, WF3 3RJ (1 component)

Battery energy storage system

Storage (Duration 2h) FVS WESTFIELD ROAD LTD New Build Generating CMU WESTFIELD ROAD BESS Not Prequalified WF3
Active • 2028-29 (T-4)
10.45 MW
West House Farm, Scruton, Northallerton, DL7 0RQ (1 component)

18MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

Storage (Duration 2h) LEEMING SOLAR FARM LIMITED New Build Generating CMU Leeming Solar Farm BESS DL7
Active • 2028-29 (T-4)
3.77 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (13 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is … (3)

Storage (Duration 2h) Storage (Duration 4h) SPALDING ENERGY PARK LIMITED New Build Generating CMU SPBB18 SPBC18 +7 more PE11
Active • 2025-26 (T-4), 2024-25 (T-4) ...
West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Landulph Not Prequalified PL12
Active • 2026-27 (T-4)
8.98 MW
West of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Sellindge Not Prequalified TN25
Active • 2026-27 (T-4)
8.03 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (4 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Solar Photovoltaic Storage (Duration 2h) BRITISH SOLAR RENEWABLES LIMITED New Build Generating CMU Whaddon Farm BESS Whaddon Farm Solar Park BA14
Active • 2027-28 (T-4), 2024-25 (T-1)
4.42 MW
WHITLEY GOLF COURSE CORSHAM ROAD, SHAW, MELKSHAM SN12 8EQ. (Nearest postcode to grid reference: SN12 8EH). (10 components)

Battery Storage Plant (3)

Storage Storage (Duration 2h) MELKSHAM WEST STORAGE LIMITED MELKSHAM EAST STORAGE LIMITED MELKSHAM WEST STORAGE LIMITED +1 more New Build Generating CMU Melksham East Storage Melksham East Storage 010 +4 more SN12
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Widow Hill, Balderstone Lane, Burnley, BB10 2TA (1 component)

70MW BESS installation made up of 38 units of 4MW batteries - resulting in a storage capacity of >2 hours.

Storage (Duration 2h) P3P ENERGY MANAGEMENT LIMITED New Build Generating CMU Widow Hill BESS Not Prequalified BB10
Active • 2027-28 (T-4)
10.77 MW
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (4 components)
• Existing CMU comprising of battery storage and associated plant (2)
• New Build CMU comprising of battery storage and associated plant
Storage (Duration 2h) CONRAD (WINCHESTER) LIMITED New Build Generating CMU Winchester Winchester +2 more SO21
Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.26 MW
Wise Warren Farm, Warren Lane, Tadcaster, LS24 9NU (1 component)

A new-build energy storage site

Storage (Duration 2h) HARMONY BH LIMITED New Build Generating CMU Bramham BESS Not Prequalified LS24
Active • 2027-28 (T-4)
4.31 MW
Withy Place, Bramley Road, Silchester, Reading, RG7 2LN (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (SOUTH) LIMITED New Build Generating CMU Withy Place Not Prequalified RG7
Active • 2028-29 (T-4)
10.47 MW
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (3 components)
• Two hour duration battery storage (2)
• Two duration battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.56 MW
Worset Lane, Whelley Hill Farm, Hart, Hartlepool, TS27 3BH. (1 component)

The CMU component consist of Li-ion (or equivalent) Battery Storage and Inverter units to be installed on designated land at Worset Lane, Whelley Hill Farm, Hart, Hartlepool, TS27 3BH.

Active • 2027-28 (T-4)
5.54 MW
Wright Street, Paisley, Renfrew, PA4 8AN (1 component)

Battery Energy Storage, 49.990 MW installed for a 2hr system.

Active • 2028-29 (T-4)
10.47 MW
Loading map...
Showing 21 locations