Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

362 unique locations (1367 components) - Page 3 of 15

Duniface Farm, Windygates, Fife, KY8 5RH (1 component)

New build Battery Energy Storage CMU

Active • 2028-29 (T-4)
3.19 MW
Dunkeswell Power Generation Plant, Unit 24A, Flightway, Dunkeswell Business Bark, Honiton, Devon, EX14 4LG (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
0.50 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2025-26 (T-4)
74.41 MW
Eccles Birgham Farm TD12 4LU (3 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.76 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (46 components)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 6)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4371.10 MW
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (5 components)

New Build Battery Storage Facility

Active • 2025-26 (T-1), 2023-24 (T-1)
80.51 MW
Elvanfoot BESS, Leadhills Road, Elvanfoot, ML12 6TE (1 component)

circa 10MW 2hr lithium Ion battery system connected at 33kV to the SPT transmission system

Active • 2027-28 (T-4)
1.51 MW
Emmers Farm, Holt Road, BH21 7HJ (4 components)

2h-duration battery system

Active • 2028-29 (T-4), 2025-26 (T-1)
31.74 MW
Farburn?Place, Dyce, Aberdeen, AB21 7GP (2 components)

Battery Storage 2 hour duration

Active • 2024-25 (T-1)
13.60 MW
Farnham Battery Storage, Wrecclesham Hill, Farnham, GU10 4JU (3 components)

A new build 20MW battery energy storage system

Inactive • 2023-24 (T-1)
18.39 MW
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (1 component)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.

Active • 2027-28 (T-4)
15.01 MW
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (1 component)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.

Active • 2026-27 (T-4)
35.45 MW
Former Sanmex Site, Land at Dalmarnock Road, Rutherglen, South Lanarkshire, G73 1NY (2 components)
• New Build Battery Storage
• New build battery Storage
Active • 2028-29 (T-4)
15.22 MW
Former Scrap Yard, Town Lane, Charnock Richard, Chorley, PR7 5HQ (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Active • 2025-26 (T-1)
8.15 MW
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (4 components)

CMU to comprise multiple individual storage units metered and despatched centrally

Active • 2026-27 (T-4), 2025-26 (T-4)
73.76 MW
Gerard Hall Battery Site, Mill Lane, Nursling SO16 0YE (3 components)

New Battery Storage Site comprising brand new batteries & inverters

Active • 2025-26 (T-4)
18.91 MW
Gladstone St, Blackburn, BB1 3ES (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
11.71 MW
Goyt Hall Farm, Dark Lane, Romiley, Stockport SK6 3LH (2 components)
• A Battery Energy Storage System
• A distribution connected Battery Energy Storage System
Active • 2028-29 (T-4), 2025-26 (T-4)
24.27 MW
Greenfields Farm Worcester Road Upton Warren Bromsgrove B61 7JD (10 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2027-28 (T-4)
10.86 MW
Greenfield site, Stainton, Rotherham, S66 7RQ (1 component)

Battery Storage 2 hour duration

Active • 2026-27 (T-4)
18.90 MW
Green Lane, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (2 components)

A New build generating storage CMU

Active • 2028-29 (T-4)
20.94 MW
Grendon Lakes, Main Road, Grendon, Northampton, Northamptonshire NN7 1JW. (4 components)

Battery Storage Plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.07 MW
Hamble Lane, Old Netley, Southampton, SO31 5FT (2 components)

A Battery Energy Storage System

Active • 2025-26 (T-4)
2.84 MW
Loading map...
Showing 25 locations