Castlelaurie Industrial Estate, Bankside, Falkirk FK2 7XF (1 component)

New build battery storage

Storage (Duration 2h) FALKIRK POWER LTD New Build Generating CMU BANKSIDE FK2
Active • 2028-29 (T-4)
7.66 MW
Catahoula Fields, Eglantine Lane, Farningham, Kent, DA4 9JL (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Farningham Not Prequalified DA4
Active • 2027-28 (T-4)
0.68 MW
Catridge Farm, Wick Lane, Lacock, Chippenham, SN15 2LU (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Cartridge Not Prequalified SN15
Active • 2025-26 (T-4)
Causeway Power, The Causeway Industrial Site, Maldon, CM9 4GG (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Causeway Power Not Prequalified CM9
Active • 2026-27 (T-4)
1.18 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (6 components)

49.5 MW Battery Energy Storage facility (3)

Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CF LIMITED New Build Generating CMU CHAPELFARM CHAPELFARM +3 more LU4
Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.21 MW
Chapelton, Fraserburgh, Aberdeenshire, Scotland, AB43 7BL (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2027-28 (T-4)
4.62 MW
Chesterfield Road, Sheffield, West Yorkshire, S26 4XB (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Chesterfield Chesterfield Not Prequalified S26
Active • 2028-29 (T-4), 2027-28 (T-4)
5.40 MW
Chesterfield Road, Swallownest, Sheffield, S26 4SX (2 components)
• Gas fired reciprocating engines
• New Build Generating CMU comprising of battery storage and associated plant.
Storage (Duration 2h) OCGT and Reciprocating Engines (Fuel Type - Gas) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Chesterfield Chesterfield Road Not Prequalified S26
Active • 2026-27 (T-4), 2021-22 (T-4)
2.84 MW
Childerley Farm, Dry Drayton, Cambridgeshire, United Kingdom, CB23 8BA (1 component)

New build BESS alongside new build solar farm.

Storage (Duration 2h) STARGOOSE CLEAN ENERGY LIMITED New Build Generating CMU Not Prequalified CB23
Active • 2028-29 (T-4)
6.20 MW
Chinley House Farm, Dolly Lane, High Peak, Stockport, SK23 7NP (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Chinley Farm Not Prequalified SK23
Active • 2025-26 (T-4)
Church Road, Chelmsford, CM2 8UN (1 component)

This CMU component represents the BESS system of a co-located (solar and storage) site

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Sandon Brook BESS CM2
Active • 2027-28 (T-4)
3.72 MW
Claire Court, Rotherham - former Prince of Wales Power Station, Rotherham, South Yorkshire, S60 1RU (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Rotherham Not Prequalified S60
Active • 2027-28 (T-4)
4.18 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)

A new build 49.5MW battery energy storage system (3)

Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF LIMITED New Build Generating CMU CLAY TYE FARM CLAY TYE FARM +4 more Not Prequalified RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Road, Upminister, RM14 3PL (6 components)

49.5MW Battery Energy Storage facility connected to 132kv network (3)

Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF 2 LIMITED New Build Generating CMU CLAY TYE FARM 2 CLAYTYE2 +2 more Not Prequalified RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Cleve Hill, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (1 component)

A new build 230MW/460MWh battery storage facility connected to the National Grid Transmission network at 132kV, located at Cleve Hill.

Storage (Duration 2h) CLEVE HILL SOLAR PARK LIMITED New Build Generating CMU Uskmouth BESS CT5
Active • 2026-27 (T-4)
53.17 MW
Cleve Hill Solar Park, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (3 components)
• A transmission connected battery storage unit
• A transmission connected solar park.
Solar Photovoltaic Storage (Duration 2h) CLEVE HILL SOLAR PARK LIMITED New Build Generating CMU Cleve Hill A Cleve Hill B +1 more Not Prequalified CT5
Active • 2024-25 (T-4)
CMU-01 is located on previously developed land south of Bridge Road North, Wrexham Industrial Estate at nearest Grid Reference SJ 381495 and NGR 338124,349551 and closest identifiable Post Code of LL13 9RD. Post Code reference has also been taken as LL13 (2 components)

CMU-01 is for a 5MW-2 hour battery energy storage system, exporting at 11KV to the distribution system of Scottish Power Energy Networks (2)

Storage (Duration 2h) CLEAN BATTERY POWER UK 1 LIMITED New Build Generating CMU BRN Ash Road LL13
Active • 2028-29 (T-4), 2025-26 (T-1)
2.41 MW
CMU-02 is located on previously developed land south of Bridge Road North, Wrexham Industrial Estate at grid reference 381124,349551 and at Post Code LL13 9RD. An alternative less accurate Post Code has also been used LL13 9PS. CMU-02 is located on the (2 components)

CMU-02 is a 5 MW - 2hour battery energy storage system connected at 11 KV to the distribution network of Scottish Power Energy Networks (2)

Storage (Duration 2h) CLEAN BATTERY POWER UK 1 LIMITED New Build Generating CMU BRN - Marchweil LL13
Active • 2028-29 (T-4), 2025-26 (T-1)
2.41 MW
Coal Aston, Dronfield, S18 3AA (2 components)
• A 45MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (SOUTH) LIMITED New Build Generating CMU Dyche Lane Dyche Lane 2 Not Prequalified S18
Active • 2028-29 (T-4)
28.21 MW
Colton Farm Lochead Dunfermline Fife, KY 10. This address and pincode was used for grid correspondence. However, the site`s own post-code is yet to be identified. We will notify the DB as soon as it is available. Please see the cover letter for more det (4 components) Geocoding Needed
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
• Solar generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
Active • 2026-27 (T-4)
32.89 MW
Comhampton Lane, Stourport-on-Severn, DY13 9ST (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Stourport-on-Severn Not Prequalified DY13
Active • 2027-28 (T-4)
3.62 MW
Cooklands farm, Old Snydale, Pontefract, WF7 6HA (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Cooklands Not Prequalified WF7
Active • 2028-29 (T-4)
10.47 MW
Coxhall Power, Coxhall Road, Tattingstone, Ipswich, IP9 2NH (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Storage (Duration 2h) Storage (Duration 3h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Coxhall Power Coxhall Power IP9
Active • 2027-28 (T-4), 2026-27 (T-4)
2.28 MW
Craigton Interchange, Linburn, Bishopton, Renfrewshire, Scotland, PA7 5NT, United Kingdom (3 components)

30MW/30MWh one hour battery (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
Dadglow Farm, Bishops Itchington, Southam, CV47 2SW (1 component)

A 20MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (SOUTH) LIMITED New Build Generating CMU Dadglow Farm Not Prequalified CV47
Active • 2028-29 (T-4)
4.19 MW
Loading map...
Showing 25 locations