Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (6 components)
• 50MW of BESS to be installed within a future Greener Grid Park.
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
58.42 MW
Selby, North Yorkshire, YO8 6PG (3 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
33.45 MW
Scawby Brook, Brigg, Lincolnshire, DN20 9LT. (4 components)

Brigg Battery 2 hour duration

Active • 2028-29 (T-4), 2025-26 (T-4) ...
50.74 MW
Sanquhar II, Sanquhar, Dumfries and Galloway. DG4 6LJ (2 components)

New Build Generation CMU - Battery Energy Storage System.

Active • 2028-29 (T-4)
36.44 MW
Salisbury BESS, The Avenue, Salisbury, Wiltshire, South West England, England, SP2 0BU, United Kingdom (1 component)

The CMU is a Battery Energy Storage System with a planned 49.5MW active power output, consisting of containerised batteries.

Active • 2025-26 (T-4)
19.67 MW
Ryton Industrial Estate Blaydon NE21 4NT (1 component)

2 hour containerised battery storage

Active • 2028-29 (T-4)
10.47 MW
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF (2 components)

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel.

Active • 2026-27 (T-4), 2025-26 (T-4)
21.42 MW
Rusholme Grange, Drax, YO8 8PW (5 components)
• Lithium-ion Battery Energy Storage System
• New build 35MW Battery Energy Storage System
Active • 2024-25 (T-1), 2023-24 (T-1)
59.76 MW
Royle Barn Road, Rochdale, OL11 3DX (2 components)

Battery Energy Storage Site

Active • 2025-26 (T-4), 2025-26 (T-1)
16.49 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (10 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2024-25 (T-1) ...
1165.32 MW
Riversdale Way, Lemington, Newcastle upon Tyne, North of Tyne, England, NE15 8SF (1 component)

A Distribution Connected Battery Energy Storage System.

Active • 2028-29 (T-4)
10.45 MW
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (10 components)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
33.26 MW
Ravensroost Road, Minety, Malmesbury, Wiltshire, SN16 9RJ (4 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4)
29.48 MW
18.85 MW
Pyworthy, Torridge District, Devon, EX22 6LQ (1 component)

50 x 1.1MWh battery modules connected to provide 25MW max instantaneous output and 50MWh energy output per day. All batteries are class [XX]. Batteries are class 1.

Active • 2026-27 (T-4)
5.90 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (14 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
71.09 MW
Plot C, Land at Severn Road Avonmouth BS10 7SE (4 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Active • 2027-28 (T-4), 2026-27 (T-4)
52.81 MW
Plot 4A, Hurlawcrook Road, East Kilbride, Glasgow G75 0ZZ (1 component)

A distribution connected New Build Battery Energy Storage System

Active • 2028-29 (T-4)
4.19 MW
Plot 10 Dunnikier Business Park Midfield Drive Mitchelston Industrial Estate Kirkcaldy Fife KY1 3LW (3 components)

BATTERY STORAGE UNIT WITH 13.5 MWh energy supply and 20 MW power capacity

Inactive • 2022-23 (T-4), 2021-22 (T-4)
36.31 MW