Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

Search Guide

This registry provides comprehensive search capabilities across all Capacity Market components:

  • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
  • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
  • CMU ID Search: Enter a specific CMU ID to find exact components
  • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

The search is intelligent and will try to determine what you're looking for based on your query.

You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

Understanding Auctions

The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

  • T-4 auctions: Held 4 years ahead of the delivery year
  • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

Search Results

Search results are grouped by location and show important details about each component:

  • Active Components with auction years 2024-25 or later
  • In-Active Components with only auction years before 2024-25
  • Company Name Click to view all components for this company
  • Technology Click to search for this technology type
  • CMU: XXX Click to search for this CMU ID
  • Auction Year Click to view details for this specific auction

Each result shows the component's capacity, location details, and participation in specific auction years.

You can sort results by relevance, location, or date using the sort options.

Pagination controls appear at the bottom when there are multiple pages of results.

Component Grouping

Components at the same location with the same description are grouped together to reduce duplication.

Each group shows:

  • All CMU IDs for components at that location
  • All auction years, sorted with newest first
  • An Active/Inactive status based on auction years

Grouping helps identify multi-year contracts and related components at the same site.

The total capacity shown combines all components in the group.

Components can be expanded to show individual details by clicking the expand icon.

Sorting and Filtering

You can sort search results by:

  • Relevance: Most relevant matches first
  • Location: Alphabetical order by location name
  • Date: By auction year (newest or oldest first)
  • Capacity: Highest or lowest capacity first

Click the column headers to change sort order.

You can filter results using the search refinements at the top of the results page:

  • Filter by technology type (e.g., only show batteries)
  • Filter by active status (show only active or inactive components)
  • Filter by auction year (show only components from specific auctions)

Map Explorer & Map View

We provide two map-based tools for exploring capacity market data:

Map Explorer

The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

  • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
  • Advanced Filtering: Filter by technology type, company, delivery year, and active status
  • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
  • Full-Screen Map: Maximizes map space for detailed geographical analysis
Search Map View

The Search Map View combines search functionality with map visualization, offering:

  • Search-First Approach: Start with text searches, then visualize results on the map
  • Integrated Results: Search results and map display work together
  • Performance Optimized: Streamlined for fast search result mapping

Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

Map Features:
  • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
    GasDSRNuclearCHPSolarWind
    BatteryBiomassHydroInterconnectorCoalOther
  • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
  • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
  • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
  • Interactive Markers: Click on individual markers to see detailed information about components at that location

Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

Contact Us

We're here to help with any questions about the Capacity Market Registry.

Email

For general inquiries and support:

Loading...
Loading...
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • Trading Board
  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Storage (Duration 2h)

    506 unique locations (1605 components) - Page 3 of 21

    All
  • Active
  • Inactive
  • Sort by: A-Z Components MW Date
    St Philips energy storage facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA(2 components)

    New Build CMU comprising of battery storage and associated plant (2)

    BatteryStorage (Duration 2h)CONRAD (ST PHILIPS) LIMITEDBS2
    Active • 2028-29 (T-4), 2027-28 (T-4)
    1.84 MW
    St Owens Cross, Peterstow, Hereford, HR9 6AU(1 component)

    A lithium-ion Energy Storage Plant

    BatteryStorage (Duration 2h)ST OWENS CROSS BATTERY STORAGE LIMITEDHR9
    Active • 2028-29 (T-4)
    7.18 MW
    STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP(1 component)

    Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.

    BatteryStorage (Duration 2h)Buxton Power LimitedSK17
    Active • 2026-27 (T-4)
    2.20 MW
    STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB(2 components)
    • Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.
    • Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton
    BatteryStorage (Duration 2h)Buxton Power LimitedSK17
    Active • 2025-26 (T-1), 2024-25 (T-1)
    Stonehill, Charlton, Malmesbury, SN16 9RP(1 component)

    49.900MW OF BATTERY ENERGY STORAGE SYSTEMS

    BatteryStorage (Duration 2h)STONEHILL ENERGY STORAGE LIMITEDSN16
    Active • 2024-25 (T-4)
    Stobhill Hospital, Fife Way, Balgrayhill, Glasgow, Glasgow City, Scotland, G21 3UW(1 component)

    60MW / 120MWh BESS

    BatteryStorage (Duration 2h)BLUESTONE ENERGY LTDG21
    Active • 2026-27 (T-4)
    14.18 MW
    Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH(9 components)

    Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH. (3)

    BatteryStorageStorage (Duration 2h)Storage (Duration 0.5h)NEVENDON ENERGY STORAGE LTDSS14
    Active • 2025-26 (T-4), 2024-25 (T-1) ...
    Steam Lane, Avonmouth industrial Estate, Bristol, BS11 0YT(2 components)

    20 x 1.1MWh battery modules connected to provide 10MW max instantaneous output and 20MWh energy output per day. All batteries are class [XX]. (2)

    BatteryStorage (Duration 2h)AVILS CONSULTING LIMITEDBS11
    Active • 2026-27 (T-4), 2023-24 (T-1)
    2.36 MW
    Staythorpe BESS, Staythorpe Road, Nottinghamshire, NG23 5RE(1 component)

    The CMU is a Battery Energy Storage System with a planned 437MW active power output, consisting of containerised batteries.

    BatteryStorage (Duration 2h)SSE UTILITY SOLUTIONS LIMITEDNG23
    Active • 2027-28 (T-4)
    36.01 MW
    Station Road, Southfleet, Dartford, Kent, England, DA13 9PA, United Kingdom(1 component)

    The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

    BatteryStorage (Duration 2h)CSE41 LimitedDA13
    Active • 2027-28 (T-4)
    46.02 MW
    Star Inn Farm, Land off the Main Street, Invergowrie, Perth and Kinross, Scotland, DD2 5EG, United Kingdom(1 component)

    2 hour Battery Energy Storage System

    BatteryStorage (Duration 2h)SUNSHINE PROJECT 01 LIMITEDDD2
    Active • 2027-28 (T-4)
    7.68 MW
    Stanely WWTW, Gleniffer Rd, Paisley, PA2 8UE(1 component)

    60MW/120MWh BESS

    BatteryStorage (Duration 2h)BLUESTONE ENERGY LTDPA2
    Active • 2026-27 (T-4)
    14.18 MW
    Stammery Hill, Sector, Axminster, East Devon, Devon, England, EX13 5UH, United Kingdom(1 component)

    The proposed power plant would consist of a number new highly efficient lithium-ion battery units plus ancillary equipment. Each genset is based on advanced battery technology.

    BatteryStorage (Duration 2h)CSE25 LimitedEX13
    Active • 2027-28 (T-4)
    22.93 MW
    Speke Hall Avenue, Speke, Liverpool, L24 8DA(3 components)
    • A new build, battery energy storage system (2)
    • A new build, gas fueled generation station.
    Reciprocating enginesStorage (Duration 2h)BAKER STREET GENERATION LIMITEDL24
    Active • 2028-29 (T-4), 2027-28 (T-4) ...
    5.47 MW
    South West side of the A444, Castle Gresley, DE11 9ES(1 component)

    Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

    BatteryStorage (Duration 2h)ENERSYST LIMITEDA4
    Active • 2026-27 (T-4)
    3.13 MW
    SOUTH OF NATIONAL GRID IVER SUBSTATION, SLOUGH ROAD, IVER HEATH UB8 2FX(1 component)

    The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

    BatteryStorage (Duration 2h)PIVOTED POWER LLPUB8
    Active • 2026-27 (T-4)
    7.56 MW
    South of Carnegie Road, Liverpool, L13 3AT(1 component)

    New build battery storage

    BatteryStorage (Duration 2h)LISTER BATTERY LTDL13
    Active • 2025-26 (T-4)
    Southmoor Lane, Havant, Hampshire, PO9 1JW(1 component)

    New Build Generating CMU comprising of battery storage and associated plant.

    BatteryStorage (Duration 2h)CONRAD ENERGY (DEVELOPMENTS) II LIMITEDPO9
    Active • 2026-27 (T-4)
    7.09 MW
    South Fambridge Hall Solar Farm Fambridge Road, South Fambridge, Rochford, SS4 3LS(1 component)

    20MW/40MWh of Lithium Iron Battery Electric Storage System, comprising 6 storage containers, and associated metering, switchgear and electrical infrastructure. the Battery will be its own BMU and will be co-located …

    BatteryStorage (Duration 2h)SOUTH FAMBRIDGE HALL SOLAR PARK LIMITEDSS4
    Active • 2026-27 (T-4)
    4.61 MW
    South East of Norwich Substation, Ipswich Road, Stoke Holy Cross, South Norfolk, Norfolk, England, NR14 8PQ(1 component)

    The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

    BatteryStorage (Duration 2h)PIVOTED POWER LLPNR14
    Active • 2026-27 (T-4)
    8.98 MW
    Smithyard Lane, Williton, TA4 4NN(2 components)

    New Build CMU comprising of battery storage and associated plant (2)

    BatteryStorage (Duration 2h)CONRAD ENERGY (DEVELOPMENTS) LIMITEDTA4
    Active • 2026-27 (T-4), 2023-24 (T-1)
    2.18 MW
    Smithyard Lane, Watchet, TA4 4NN(1 component)

    New Build CMU comprising of battery storage and associated plant

    BatteryStorage (Duration 2h)CONRAD (WATCHET) LIMITEDTA4
    Active • 2025-26 (T-1)
    3.22 MW
    Slack Lane, Westhoughton, BL5 3QH(1 component)

    New Build Generating CMU comprising of battery storage and associated plant.

    BatteryStorage (Duration 2h)CONRAD ENERGY (DEVELOPMENTS) II LIMITEDBL5
    Active • 2026-27 (T-4)
    4.25 MW
    Slack Lane, Westhoughton, BL5 3LB(1 component)

    New Build Generating CMU comprising of battery storage and associated plant.

    BatteryStorage (Duration 2h)CONRAD ENERGY (DEVELOPMENTS) II LIMITEDBL5
    Active • 2026-27 (T-4)
    2.13 MW
    Slack Lane, Bolton, Greater Manchester, BL5 3LJ(2 components)

    New Build CMU comprising of battery storage and associated plant (2)

    BatteryStorage (Duration 2h)CONRAD ENERGY (DEVELOPMENTS) II LIMITEDBL5
    Active • 2028-29 (T-4), 2027-28 (T-4)
    4.01 MW
    Loading map...
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access