Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

159 unique locations (343 components) - Page 3 of 7

Land to the west of Slack Lane, West Houghton, Bolton, Greater Manchester, BL5 3LJ (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4)
9.67 MW
Land to the north of East Howle Farm Ferryhill DL17 8SA (1 component)

2 hour containerised battery storage

Active • 2028-29 (T-4)
13.82 MW
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (4 components)
• New Build 49.5 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.50 MW
Land to the East of Warley Substation Clay Tye Road Upminister RM14 3PL (1 component)

35.000MW standalone battery energy storage

Active • 2027-28 (T-4)
5.39 MW
Land to North of Wey Manor Road, Addlestone, New Haw Surrey, KT15 3JR (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
11.94 MW
Land south of the Rayleigh Main Substation, SS11 8TZ (1 component)

New build generating battery storage unit

Active • 2028-29 (T-4)
83.76 MW
Land South of Inglis Farm, Cockenzie, East Lothian, EH32 0JT (1 component)

New build generating storage asset

Active • 2028-29 (T-4)
20.94 MW
Land South East of the Carrs Fishing Lakes, Letch Lane, Carlton, Stockton-on-Tees, TS21 1EA (1 component)

CMU is a 57MW/114MWh Battery Electric Storage System, which will connect to the Transmission network via a tertiary winding at the Norton 275kV substation. The Facility will comprise of 32 …

Active • 2027-28 (T-4)
5.76 MW
Land South East Of A6108, Darlington Road, Richmond, North Yorkshire, DL10 7ED (1 component)

A new build 2 hr duration Lithium-Ion Energy Storage Site

Active • 2027-28 (T-4)
4.16 MW
Land On The South East Side Of Medlock Road, Failsworth, Manchester M35 9WG (1 component)

A 30MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
6.28 MW
Land On The North And South Of Brinsworth Road, Brinsworth, Rotherham S60 5EN (1 component)

A 40MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
8.38 MW
Land on Jameston Farm, Dalry Ayrshire KA24 4EY (1 component)

Array of lithium ion batteries in a power generation environment, proving power to National Grid. Change of use of land from agricultural to new build generation.

Inactive • 2022-23 (T-4)
Land off Widow Hill Road, Burnley, BB10 2TB (2 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
8.16 MW
Land off West Bromwich Street, Oldbury, West Midlands, B69 3AZ (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
11.08 MW
Land off Walton Road, Drakelow, Derbyshire, DE15 9TX (1 component)

New-build energy storage site

Active • 2028-29 (T-4)
31.41 MW
Land Off Severn Road Hallen Bristol South Gloucestershire BS10 7SE (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
14.66 MW
Land off School Lane, Sittingbourne, Kent, ME9 8BY (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
5.68 MW
44.63 MW
5.54 MW
Land off Hogshaw Road, Granborough, Buckingham, MK18 3NL (2 components)

Battery Storage Plant

Active • 2028-29 (T-4), 2027-28 (T-4)
104.68 MW
Loading map...
Showing 25 locations