Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (80 components)
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
Dolphingstone Farm, Cockenzie, East Lothian, EH21 8GW (1 component)
The CMU component is an energy storage system comprised of lithium ion batteries with associated infrastructure
Dounreay, Thurso KW14 7RE (2 components)
Dunbar BESS, Dunbar, East Lothian, EH42 1RG, Scotland, UK (1 component)
Total Connection capacity of 49.99MW for Energy Storage. The component will be LFP BESS.
Duniface Farm, Windygates, Fife, KY8 5RH (1 component)
New build Battery Energy Storage CMU
Dunkeswell Power Generation Plant, Unit 24A, Flightway, Dunkeswell Business Bark, Honiton, Devon, EX14 4LG (1 component)
New Build CMU comprising of battery storage and associated plant
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
Eccles Birgham Farm TD12 4LU (9 components)
Eden Meadows, Evershill Lane, Morton CP, North East Derbyshire, DE55 6HA (1 component)
Battery Storage
Edwin Richards Quarry, Rowley Regis, B65 9DN (1 component)
New Build Generating CMU comprising of battery storage and associated plant.
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (3 components)
New Build Battery Storage Facility (3)
Elvanfoot BESS, Leadhills Road, Elvanfoot, ML12 6TE (1 component)
circa 10MW 2hr lithium Ion battery system connected at 33kV to the SPT transmission system
Emmers Farm, Holt Road, BH21 7HJ (2 components)
2h-duration battery system (2)
Fairy Lane, Sale, Trafford, Greater Manchester M33 2JU (2 components)
Energy facility comprising of battery energy storage sets and ancillary equipment. (2)
Farburn?Place, Dyce, Aberdeen, AB21 7GP (2 components)
Battery Storage 2 hour duration (2)
Felindre Pumping Station Substation, Pant Lasau Road, Llangyfelach, Morriston, SA5 7PA (1 component)
16MW/32MWh BESS on a future Greener Grid Park.
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)
The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (3)
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (2 components)
The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (2)
Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection) (2 components)
Former Sanmex Site, Land at Dalmarnock Road, Rutherglen, South Lanarkshire, G73 1NY (2 components)
Former Scrap Yard, Town Lane, Charnock Richard, Chorley, PR7 5HQ (3 components)
Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (3)
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (6 components)
CMU to comprise multiple individual storage units metered and despatched centrally (3)
Former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (1 component)
CMU to comprise multiple individual storage units metered and despatched centrally