Storage (Duration 2h)

521 unique locations (1480 components) - Page 4 of 21

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
DB Cargo, Toton, Nottingham, NG10 1HA (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Toton Not Prequalified NG10
Active • 2027-28 (T-4)
2.24 MW
Deep Lane BESS, Plympton, Devon, PL7 5AA (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Plympton Plympton PL7
Active • 2028-29 (T-4), 2027-28 (T-4)
4.12 MW
Denmead Farm Edneys Lane Denmead Waterlooville Hampshire PO7 6JN (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU LOVEDEAN Not Prequalified PO7
Active • 2026-27 (T-4)
11.67 MW
Dig Gate Lane, Lady House, Milnrow, Rochdale, Greater Manchester, England, OL16 4NR (2 components)
• A Distribution Connected Battery Energy Storage System.
• A Distribution Connected gas fueled generating station.
Active • 2028-29 (T-4)
10.40 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (60 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Dolphingstone Farm, Cockenzie, East Lothian, EH21 8GW (1 component)

The CMU component is an energy storage system comprised of lithium ion batteries with associated infrastructure

Storage (Duration 2h) BSSL EAST LOTHIAN 1 LTD New Build Generating CMU Dolphingstone Not Prequalified EH21
Active • 2028-29 (T-4)
9.21 MW
Dounreay, Thurso KW14 7RE (2 components)
• A 34MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) REAY POWER LIMITED New Build Generating CMU Reay Reay 2 Rejected KW14
Active • 2028-29 (T-4)
21.31 MW
Dunbar BESS, Dunbar, East Lothian, EH42 1RG, Scotland, UK (1 component)

Total Connection capacity of 49.99MW for Energy Storage. The component will be LFP BESS.

Storage (Duration 2h) FRV POWERTEK LIMITED New Build Generating CMU FPL Dunbar BESS EH42
Active • 2028-29 (T-4)
8.17 MW
Duniface Farm, Windygates, Fife, KY8 5RH (1 component)

New build Battery Energy Storage CMU

Storage (Duration 2h) BERYL STREET GENERATION LIMITED New Build Generating CMU Leven BESS KY8
Active • 2028-29 (T-4)
3.19 MW
Dunkeswell Power Generation Plant, Unit 24A, Flightway, Dunkeswell Business Bark, Honiton, Devon, EX14 4LG (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (DUNKESWELL) LIMITED New Build Generating CMU Dunkeswell Not Prequalified EX14
Active • 2027-28 (T-4)
0.50 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.02 MW
Eccles Birgham Farm TD12 4LU (9 components)
• 50MW battery storage located near to the SPT Eccles substation
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant.
Storage (Duration 2h) Storage (Duration 4h) ZENOBE ECCLES LIMITED New Build Generating CMU Blackhillock extension Eccles +4 more TD12
Active • 2027-28 (T-4), 2026-27 (T-4)
171.47 MW
Eden Meadows, Evershill Lane, Morton CP, North East Derbyshire, DE55 6HA (1 component)

Battery Storage

Storage (Duration 2h) RWE RENEWABLES UK SOLAR AND STORAGE LIMITED New Build Generating CMU CMU_EDMB-1 Not Prequalified DE55
Active • 2028-29 (T-4)
8.14 MW
Edwin Richards Quarry, Rowley Regis, B65 9DN (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Rowley Regis Not Prequalified B65
Active • 2026-27 (T-4)
7.09 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (45 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (2 components)

New Build Battery Storage Facility (2)

Storage (Duration 2h) SWANGATE ENERGY STORAGE LIMITED New Build Generating CMU SWANBT SWANBT S63
Active • 2025-26 (T-1), 2023-24 (T-1)
31.02 MW
Elvanfoot BESS, Leadhills Road, Elvanfoot, ML12 6TE (1 component)

circa 10MW 2hr lithium Ion battery system connected at 33kV to the SPT transmission system

Storage (Duration 2h) ELVANFOOT ENERGY STORAGE LIMITED New Build Generating CMU Elvanfoot 9.8 Not Prequalified ML12
Active • 2027-28 (T-4)
1.51 MW
Emmers Farm, Holt Road, BH21 7HJ (2 components)

2h-duration battery system (2)

Storage (Duration 2h) MANNINGTON ENERGY CENTRE LIMITED New Build Generating CMU Rejected BH21
Active • 2028-29 (T-4), 2025-26 (T-1)
15.87 MW
Fairy Lane, Sale, Trafford, Greater Manchester M33 2JU (2 components)

Energy facility comprising of battery energy storage sets and ancillary equipment. (2)

Storage (Duration 2h) STOR 149 LTD New Build Generating CMU Sale Sale M33
Active • 2027-28 (T-4), 2026-27 (T-4)
38.98 MW
Farburn?Place, Dyce, Aberdeen, AB21 7GP (2 components)

Battery Storage 2 hour duration (2)

Active • 2026-27 (T-4), 2024-25 (T-1)
13.89 MW
Farnham Battery Storage, Wrecclesham Hill, Farnham, GU10 4JU (1 component)

A new build 20MW battery energy storage system

Storage (Duration 2h) HARMONY FM LIMITED New Build Generating CMU Farnham ESS GU10
Inactive • 2023-24 (T-1)
7.40 MW
Felindre Pumping Station Substation, Pant Lasau Road, Llangyfelach, Morriston, SA5 7PA (1 component)

16MW/32MWh BESS on a future Greener Grid Park.

Storage (Duration 2h) STATKRAFT UK LTD New Build Generating CMU Rejected SA5
Active • 2025-26 (T-4)
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (3)

Storage (Duration 2h) SSE FERRYBRIDGE BATTERY LIMITED SSE UTILITY SOLUTIONS LIMITED New Build Generating CMU Ferrybridge BESS Ferrybridge BESS +1 more WF11
Active • 2027-28 (T-4), 2026-27 (T-4) ...
89.14 MW
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (2 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (2)

Storage (Duration 2h) SSE UTILITY SOLUTIONS LIMITED SSE FIDDLERS FERRY BATTERY LIMITED New Build Generating CMU Fiddlers BESS Fiddlers BESS WA5
Active • 2027-28 (T-4), 2026-27 (T-4)
50.45 MW
Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection) (2 components)
• CMU is a 28MW/56MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the BESS will be separately metered and registered as separate BMUs. The BESS will connect to the grid via the 20/66 kV substation of the Facility, connecting to additional panels on the 20kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 28 containers with Lithium Ion battery modules (LFP), containers further including HVAC, fire extinguishing system and controls; 7 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/20kV step up transformer and a 630A 20 kV Ring Main Unit (RMU);
• CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the BESS will be separately metered, and registered as separate BMUs. The BESS will connect to the grid via the 20/66 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 16 containers with Lithium Ion battery modules (LFP), containers further including HVAC, fire extinguishing system and controls; 8 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU);
Storage (Duration 1h) Storage (Duration 2h) DRIFFIELD SOLAR AND STORAGE LIMITED New Build Generating CMU Driffield Solar and Storage Driffield Solar and Storage YO25
Active • 2027-28 (T-4), 2026-27 (T-4)
6.32 MW
Loading map...
Showing 25 locations