Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

362 unique locations (1367 components) - Page 4 of 15

73.01 MW
Pikevy Farm, Glenrothes, Fife, KY6 3HD (1 component)

This is a 49.9MW battery storage facility connected at 33kV.

Active • 2025-26 (T-1)
12.82 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (4 components)

New Build CMU comprising of battery storage and associated plant

Active • 2026-27 (T-4), 2023-24 (T-1)
9.02 MW
Park Farm Solar and Battery, Shaftesbury Road, Gillingham, SP8 5JG (1 component)

This CMU component represents the BESS system of a co-located (solar and storage) site

Active • 2025-26 (T-1)
5.03 MW
Overlea Farm , New Mills, High Peak, Stockport SK22 4QJ (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
3.18 MW
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (7 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in NGED's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.03 MW
Off Letch Lane, Stockton-on-Tees, TS21 1ED (1 component)

New Build CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
9.45 MW
North of Hull Rd, Osbaldwick, York,YO10 3JA (1 component)

New build battery storage.

Active • 2025-26 (T-4)
9.54 MW
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (2 components)

New build two-hour duration battery storage

Active • 2026-27 (T-4)
4.16 MW
35.45 MW
New Road, Featherstone, Wolverhampton, WV10 7NS (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
9.93 MW
Newnham Road, Radwell, Baldock, North Hertfordshire, Hertfordshire, England, SG7 5DP (1 component)

A Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.37 MW
Newburth, Perth, Scotland, KY14 6EW (1 component)

Storage battery 2h duration

Active • 2028-29 (T-4)
13.61 MW
Netherton Farm, Keith AB55 5PE (2 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
Active • 2025-26 (T-1)
54.30 MW
Mount Stamper Road, St Austell, Cornwall, PL25 5QP (1 component)

New-Build Li-Ion BESS, 2hr duration.

Active • 2028-29 (T-4)
2.09 MW
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (3 components)

The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries.

Active • 2027-28 (T-4), 2026-27 (T-4)
183.24 MW
McQuittiston Farm, A70, Ochiltree, East Ayrshire, Scotland, KA6 6NF (1 component)

A Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
6.26 MW
Mannington Depot, Telford Way, Swindon, SN5 8BA (3 components)

A Battery Energy Storage System

Inactive • 2022-23 (T-1)
Mannington Depot, Mannington Depot Service Road Mannington Swindon SN5 8BA (5 components)

A Battery Energy Storage System.

Inactive • 2023-24 (T-1), 2022-23 (T-1)
20.58 MW
Lowfields Way, Lowfields Business Park, HX5 9DA (4 components)
• New build battery storage
• New build generating storage unit
Active • 2028-29 (T-4), 2023-24 (T-1)
66.79 MW
Loading map...
Showing 25 locations