Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

159 unique locations (343 components) - Page 4 of 7

Land Off Grey Friars Way, Stafford, ST16 2PE (16 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2027-28 (T-4)
10.46 MW
Land Off Darnall Road, Sheffield, South Yorkshire, S9 5AB (21 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.37 MW
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (4 components)
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Active • 2028-29 (T-4), 2027-28 (T-4) ...
20.92 MW
7.68 MW
Land North Of Gala Bingo, Winterton Road, Scunthorpe, DN15 0DH. (1 component)

A Battery Energy Storage System.

Active • 2027-28 (T-4)
14.62 MW
Land North East of Sandyforth Farm, Ashton Road, Wigan WN5 7XZ (1 component)

New Build Battery Storage

Active • 2028-29 (T-4)
14.51 MW
12.15 MW
Land Northeast of Moat Lane, Moat Farm, Wickersley, Rotherham, S66 1DZ (1 component)

New-build energy storage asset

Active • 2028-29 (T-4)
15.71 MW
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
Land Near To Monks House, Westerleigh, BS37 8RD (2 components)

BESS with Lit-Ion technology, 2 hours duration

Active • 2027-28 (T-4)
30.60 MW
4.61 MW
Land near Ellbridge Lane, Ellbridge, Landulph, Saltash, Cornwall, PL12 6PU (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
5.34 MW
20.94 MW
Land lying to the south west of Rouncil Lane, Kenilworth (CV8 1NN) (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2027-28 (T-4)
5.85 MW
Land Lying To The South Of Manor Farm, Ratcliffe On Soar, Nottingham NG11 0EA (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Active • 2027-28 (T-4)
18.47 MW
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
16.66 MW
Land At Westerton Road, Keith, Moray, AB55 5NR (1 component)

CMU 24KEI4 is a battery storage CMU.

Active • 2028-29 (T-4)
7.23 MW
Land at Smith Road, Wednesbury, WS10 0PD (2 components)
• New build generating battery storage unit.
• New build generating storage unit
Active • 2028-29 (T-4)
48.64 MW
Land at Private Road No.5, Colwick Industrial Estate, Nottingham, NG4 2JU (7 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.28 MW
7.75 MW
Land at Oaklands Farm Featherstone Lane, Wolverhampton, Staffordshire, WV10 7JZ (3 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
22.70 MW
Loading map...
Showing 25 locations