Land Adjacent Unit 66 Gravelly Industrial Park Walker Dr, Birmingham B24 9AW (1 component)

The CMU is a new build 50MW/100MWh battery storage facility connected to the Western Power distribution network at 33kV, located at the Gravelly Industrial Park, Birmingham.

Active • 2026-27 (T-4)
11.58 MW
Land adjoining Outclough Farm, Chatterley, Whitfield, Biddulph Road, Stoke on Trent, ST6 8UW (1 component)

The construction of a new build Battery Energy Storage System (BESS) will comprise of a number of new Batteries supplied by Trina Storage Elementa 2.0 solution and associated equipment required …

Active • 2028-29 (T-4)
10.45 MW
Land at Armshead Farm, Armshead Road, Werrington, Staffordshire, ST9 0NB (5 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4)
70.04 MW
Land at Axminster Substation, Pound Road, Axminster, Devon, EX13 5RX (3 components)
• A Battery Energy Storage System
• A Battery Energy Storage System.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
51.77 MW
Land at Birkhill Commercial Park, Coalburn, S Lanarkshire, ML11 0FT (4 components)
• New Build Battery Storage
• New build battery storage
Active • 2028-29 (T-4), 2025-26 (T-1)
167.25 MW
Land at Birkin Lane, Grassmoor, Chesterfield, S42 5BP (2 components)

A 2 hour BESS connected directly to the DNO network

Active • 2025-26 (T-1)
0.52 MW
Land At Bishops Bowl Fishery Stratford-upon-Avon CV47 2SR (11 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2027-28 (T-4)
12.36 MW
Land at Boreham Street Farm, Boreham Street, Hailsham, Sussex, BN27 4SJ (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
39.25 MW
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (10 components)
• A new build 10MW battery storage system
• A new build 11MW battery storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
13.52 MW
31.32 MW
Land at Brook Farm, 90 High Street, Loscoe, DE75 7LJ (7 components)

Battery energy storage unit

Active • 2028-29 (T-4)
8.37 MW
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (17 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• A new build battery energy storage system
Active • 2026-27 (T-4), 2025-26 (T-4) ...
156.98 MW
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (3 components)
• A New Build Battery Energy Storage System
• A New Build Gas fuelled power plant at Capenhurst substation
Active • 2024-25 (T-1), 2023-24 (T-4) ...
12.92 MW
Land at Davies Road, Blackburn, Lancashire BB1 3HR (2 components)
• CMU ID 22WHI4, a new build battery storage CMU
• CMU ID 24WHI1, a new build battery storage CMU
Active • 2026-27 (T-4), 2025-26 (T-1)
11.12 MW
31.32 MW
Land at Duddingston, Newton, West Lothian, EH30 9SN (2 components)

20MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

Active • 2028-29 (T-4)
8.38 MW
Land at Dunhams Lane, Letchworth Garden City, SG6 1JH (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2026-27 (T-4)
1.20 MW
LAND AT DUNHAMS LANE LETCHWORTH GARDEN CITY SG6 1JH (2 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
4.92 MW
Land at Finns Barn, Wellow Road, Eakring, Newark, NG22 0FW (2 components)

A standalone 0.949MW BESS connected directly to the DNO network.

Active • 2025-26 (T-1)
0.52 MW
Land at Frodo Solar Farm, Moss-side, Crimond, Fraserburgh, Grampian, AB43 8YH (1 component)

New Build CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
2.36 MW
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (31 components)
• Battery storage unit
• New reciprocating gensets in acoustic enclosure
• Reciprocating genset in acoustic enclosure
Active • 2025-26 (T-4), 2023-24 (T-4) ...
10.42 MW
Land at Guilsborough Lodge Farm, West Haddon Road, Guilsborough, Northampton, NN6 8QE (2 components)

A standalone 0.949MW Battery Energy Storage System connected directly to the DNO network.

Active • 2025-26 (T-1)
0.52 MW
Land at Harrow Lane, Bulphan, Thurrock, Essex RM14 3RE (1 component)

Lithium-based battery energy storage system.

Active • 2025-26 (T-1)
13.58 MW