Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

521 unique locations (1480 components) - Page 5 of 21

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Former Sanmex Site, Land at Dalmarnock Road, Rutherglen, South Lanarkshire, G73 1NY (2 components)
• New Build Battery Storage
• New build battery Storage
Storage (Duration 2h) DALMARNOCK BESS LTD New Build Generating CMU Dalmarnock A Dalmarnock BESS Not Prequalified G73
Active • 2028-29 (T-4)
15.22 MW
Former Scrap Yard, Town Lane, Charnock Richard, Chorley, PR7 5HQ (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (3)

Storage (Duration 2h) PULSE CLEAN ENERGY SPV ANNING LIMITED New Build Generating CMU TL2023 Town Lane PR7
Active • 2027-28 (T-4), 2025-26 (T-1) ...
18.72 MW
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (6 components)

CMU to comprise multiple individual storage units metered and despatched centrally (3)

Storage (Duration 2h) Sembcorp Utilities (UK) Limited New Build Generating CMU S25BS3 Not Prequalified TS6
Active • 2026-27 (T-4), 2025-26 (T-4) ...
66.67 MW
Former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (1 component)

CMU to comprise multiple individual storage units metered and despatched centrally

Active • 2025-26 (T-4)
GCC Cathkin, Cairnmuir Road, Glasgow, G74 4GY (1 component)

60MW / 120MWh

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU CATHKIN Not Prequalified G74
Active • 2026-27 (T-4)
14.18 MW
GCC Summerston, Balmore Road, Glasgow, G23 5HD (1 component)

60MW / 120MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU SUMMERSTON Not Prequalified G23
Active • 2026-27 (T-4)
14.18 MW
Gerard Hall Battery Site, Mill Lane, Nursling SO16 0YE (2 components)

New Battery Storage Site comprising brand new batteries & inverters

Active • 2025-26 (T-4)
Gladstone St, Blackburn, BB1 3ES (3 components)
• New Build CMU comprising of battery storage and associated plant (2)
• New Build Generating CMU comprising of battery storage and associated plant.
Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Blackburn B Blackburn B +1 more BB1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.24 MW
Goyt Hall Farm, Dark Lane, Romiley, Stockport SK6 3LH (2 components)
• A Battery Energy Storage System
• A distribution connected Battery Energy Storage System
Storage (Duration 2h) GOYT HALL PROJECT COMPANY LTD ETP-QQR ENERGY LIMITED New Build Generating CMU Goyt Farm Goyt Hall SK6
Active • 2028-29 (T-4), 2025-26 (T-4)
8.38 MW
Great Elm Farm, Pond Lane, Charlton, Wiltshire, SN16 9DS (2 components)

A Battery Energy Storage System (2)

Storage (Duration 2h) HD381GRE LTD New Build Generating CMU Minety 4 Minety 4 Not Prequalified SN16
Active • 2026-27 (T-4), 2025-26 (T-4)
11.22 MW
Greenfields Farm Worcester Road Upton Warren Bromsgrove B61 7JD (12 components)

Battery energy storage unit (2)

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Greenfields Farm Greenfields Farm B61
Active • 2028-29 (T-4), 2027-28 (T-4)
12.70 MW
Greenfield site, Stainton, Rotherham, S66 7RQ (1 component)

Battery Storage 2 hour duration

Storage (Duration 2h) CBS ENERGY STORAGE ASSETS UK LIMITED New Build Generating CMU Not Prequalified S66
Active • 2026-27 (T-4)
18.90 MW
Green Lane, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (1 component)

A New build generating storage CMU

Storage (Duration 2h) HC ESS7 LIMITED New Build Generating CMU Not Prequalified S66
Active • 2028-29 (T-4)
10.47 MW
Grendon Lakes, Main Road, Grendon, Northampton, Northamptonshire NN7 1JW. (4 components)

Battery Storage Plant (3)

Storage (Duration 1h) Storage (Duration 2h) GRENDON LAKES STORAGE LIMITED New Build Generating CMU Grendon Lakes Storage Limited Grendon Lakes Storage Limited +2 more Not Prequalified NN7
Active • 2028-29 (T-4), 2027-28 (T-4) ...
20.22 MW
Haddon Farm, Haddons Lane, Claveshay, North Petherton, Bridgwater, TA6 6PG (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
7.09 MW
Haigh Park Road, Stourton, Rothwell, Leeds, West Yorkshire. LS10 1RT (2 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) WESSEX ENERGY STORAGE LTD New Build Generating CMU WES001 WES001 Not Prequalified LS10
Active • 2025-26 (T-4)
Hamble Lane, Old Netley, Southampton, SO31 5FT (2 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Hamble Hamble2 Not Prequalified SO31
Active • 2025-26 (T-4)
Hams Lane, Lea Marston CP, North Warwickshire, Warwickshire, England, B76 0BL (1 component)

98MW / 196MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU LEA MARSTON Not Prequalified B76
Active • 2026-27 (T-4)
23.16 MW
Harrop Lane, Hare Croft, Wilsden, Bradford, West Yorkshire,BD15 0BZ (3 components)

New build battery storage. (3)

Storage (Duration 2h) UK BATTERY STORAGE LTD New Build Generating CMU Bradford Bradford +1 more BD15
Active • 2025-26 (T-4), 2024-25 (T-1) ...
45.36 MW
Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (2 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Dellsome Power AL4
Active • 2026-27 (T-4), 2025-26 (T-4)
1.20 MW
HAWK'S NEST FARM, MISLINGFORD, FAREHAM, PO17 5AR (1 component)

A standalone 2 hour BESS connecting directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 2 Rejected PO17
Active • 2025-26 (T-1)
0.26 MW
Hele Road, Hele, Taunton, Somerset TA4 1AH (2 components)

Energy facility comprising of battery energy storage sets and ancillary equipment. (2)

Storage (Duration 2h) STOR 107 LTD New Build Generating CMU Hele Hele TA4
Active • 2027-28 (T-4), 2026-27 (T-4)
7.80 MW
Higglers Farm, Titchfield Lane, Wickham, Hampshire, PO17 5PQ (2 components)
• New Build CMU comprising of Solar PV and associated plant
• New Build CMU comprising of battery storage and associated plant
Solar Photovoltaic Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Wickham Wickham Not Prequalified PO17
Active • 2028-29 (T-4), 2027-28 (T-4)
8.48 MW
Higglers Farm, Titchfield Lane, Wickham, PO17 5PQ (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Wickham Not Prequalified PO17
Active • 2026-27 (T-4)
9.93 MW
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation G74 4GY (1 component)

Standalone battery storage system connecting at 33kV to the East Killbride substation

Storage (Duration 2h) CATHKIN ENERGY STORAGE LIMITED New Build Generating CMU CATHKIN G74
Active • 2025-26 (T-1)
12.90 MW
Loading map...
Showing 25 locations