Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Storage (Duration 2h)

499 unique locations (1595 components) - Page 5 of 20

Plot C, Land at Severn Road Avonmouth BS10 7SE (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
27.31 MW
Plot 4A, Hurlawcrook Road, East Kilbride, Glasgow G75 0ZZ (1 component)

A distribution connected New Build Battery Energy Storage System

Active • 2028-29 (T-4)
4.19 MW
Pillswood Phase 1, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (3 components)
• A 49.9MW battery energy storage system
• A battery energy storage system
Active • 2024-25 (T-1), 2023-24 (T-1)
18.33 MW
Pikevy Farm, Glenrothes, Fife, KY6 3HD (2 components)

This is a 49.9MW battery storage facility connected at 33kV. (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
20.72 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.02 MW
Perimeter Road, Ince, Elton, Cheshire West & Chester, CH2 4RX (2 components)

A new build, battery energy storage system (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
5.47 MW
Park Farm Solar and Battery, Shaftesbury Road, Gillingham, SP8 5JG (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
7.09 MW
Overlea Farm , New Mills, High Peak, Stockport SK22 4QJ (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Overhill Farm, Rothienorman, Scotland, AB51 8YN (2 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2.5 hours.
Active • 2027-28 (T-4), 2025-26 (T-1)
23.40 MW
Ordsall Lane, Ordsall, Salford Quays, Salford, M5 3NB (2 components)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (4 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable … (2)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable …
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.06 MW
Off Letch Lane, Stockton-on-Tees, TS21 1ED (1 component)

New Build CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
9.45 MW
North of Hull Rd, Osbaldwick, York,YO10 3JA (2 components)

New build battery storage.

Active • 2025-26 (T-4)
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (6 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2026-27 (T-4), 2025-26 (T-4)
6.29 MW
New Road, Featherstone, Wolverhampton, WV10 7NS (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
9.93 MW
Newnham Road, Radwell, Baldock, North Hertfordshire, Hertfordshire, England, SG7 5DP (1 component)

A Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.37 MW
Newby Power, Unit 9, Newby Road Industrial Estate, Stockport, SK7 5DA (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2026-27 (T-4)
3.42 MW
Newburth, Perth, Scotland, KY14 6EW (1 component)

Storage battery 2h duration

Active • 2028-29 (T-4)
13.61 MW
Loading map...
Showing 25 locations