Storage (Duration 2h)

553 unique locations (1600 components) - Page 5 of 23

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Royle Farm, Burton upon Trent, Derbyshire, DE15 9TU (2 components) Geocoding Needed
β€’ A 90 MW battery storage system comprising approx 11 battery skid units units at Royle Farm Business Park
β€’ Containerised battery storage asset, 2 hour duration
Storage (Duration 1h) Storage (Duration 2h) ALUDRA BESS LTD New Build Generating CMU ALUDRA BESS LTD (Drakelow) DE15
Active β€’ 2026-27 (T-4), 2025-26 (T-4)
39.23 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components) Geocoding Needed

Battery Energy Storage Site

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 003 LIMITED New Build Generating CMU Royle Barn Road Royle Barn Road +3 more OL11
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
35.11 MW
Rosper Road, Immingham, North Lincolnshire, DN40 3DZ (18 components) Geocoding Needed
β€’ Battery storage unit
β€’ Gas CHP on South bank of river Humber providing electricity and industrial steam
β€’ New build gas reciprocating multi-engine generating plant
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
11434.68 MW
Riversdale Way, Lemington, Newcastle upon Tyne, North of Tyne, England, NE15 8SF (1 component) Geocoding Needed

A Distribution Connected Battery Energy Storage System.

Storage (Duration 2h) NEWBURN HAUGH POWER LIMITED New Build Generating CMU Newburn NE15
Active β€’ 2028-29 (T-4)
10.45 MW
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (6 components) Geocoding Needed
β€’ A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
β€’ A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
Storage Storage (Duration 2h) VATTENFALL WIND POWER LTD New Build Generating CMU Battery@Ray Battery@Ray +2 more
Active β€’ 2024-25 (T-4), 2024-25 (T-1) ...
23.57 MW
Rawmarsh Road, Rotherham, S60 1RU (1 component) Geocoding Needed

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Rotherham Not Prequalified S60
Active β€’ 2026-27 (T-4)
2.13 MW
Ravensroost Road, Minety, Malmesbury, Wiltshire, SN16 9RJ (2 components) Geocoding Needed

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Malmesbury Malmesbury Not Prequalified SN16
Active β€’ 2028-29 (T-4), 2027-28 (T-4)
13.39 MW
9.42 MW
Pyworthy, Torridge District, Devon, EX22 6LQ (1 component) Geocoding Needed

50 x 1.1MWh battery modules connected to provide 25MW max instantaneous output and 50MWh energy output per day. All batteries are class [XX]. Batteries are class 1.

Storage (Duration 2h) AVILS CONSULTING LIMITED New Build Generating CMU Rejected EX22
Active β€’ 2026-27 (T-4)
5.90 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components) Geocoding Needed
β€’ A New Build battery energy storage system.
β€’ An existing battery energy storage system.
β€’ The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active β€’ 2026-27 (T-4), 2025-26 (T-1) ...
111.74 MW
Plot C, Land at Severn Road Avonmouth BS10 7SE (3 components) Geocoding Needed

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Storage (Duration 2h) FPC (Ipswich) Limited New Build Generating CMU Avonmouth B1 Avonmouth B2 +1 more Not Prequalified BS10
Active β€’ 2027-28 (T-4), 2026-27 (T-4)
27.31 MW
Plot 4A, Hurlawcrook Road, East Kilbride, Glasgow G75 0ZZ (1 component) Geocoding Needed

A distribution connected New Build Battery Energy Storage System

Storage (Duration 2h) EAST KILBRIDE PROJECT COMPANY LTD New Build Generating CMU East Kilbride Not Prequalified G75
Active β€’ 2028-29 (T-4)
4.19 MW
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (5 components) Geocoding Needed

Battery storage plant

Storage (Duration 1h) Storage (Duration 2h) COUPAR LIMITED New Build Generating CMU Coupar 20MW 2 hour BESS Coupar 21MW 2 hour BESS +3 more PH13
Active β€’ 2025-26 (T-4), 2024-25 (T-1) ...
33.51 MW
Pleasance Road - Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (1 component) Geocoding Needed

Battery storage plant

Storage (Duration 2h) COUPAR LIMITED Existing Generating CMU PH13
Active β€’ 2024-25 (T-1)
8.16 MW
Pillswood Phase 2, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (1 component) Geocoding Needed

LFP Battery Energy Storage facility

Storage (Duration 2h) HARMONY (PW) 2 LIMITED Existing Generating CMU PILLSWOOD 2 HU16
Active β€’ 2024-25 (T-1)
10.88 MW
Pillswood Phase 1, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (2 components) Geocoding Needed
β€’ A 49.9MW battery energy storage system
β€’ A battery energy storage system
Storage (Duration 2h) HARMONY (PW) LIMITED Existing Generating CMU PILLSWOOD PILLSWOOD HU16
Active β€’ 2024-25 (T-1), 2023-24 (T-1)
29.21 MW
Pikevy Farm, Glenrothes, Fife, KY6 3HD (2 components) Geocoding Needed

This is a 49.9MW battery storage facility connected at 33kV.

Active β€’ 2027-28 (T-4), 2025-26 (T-1)
20.72 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components) Geocoding Needed

New Build CMU comprising of battery storage and associated plant

Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
4.55 MW
Perimeter Road, Ince, Elton, Cheshire West & Chester, CH2 4RX (2 components) Geocoding Needed

A new build, battery energy storage system

Storage (Duration 2h) BERYL STREET GENERATION LIMITED New Build Generating CMU Protos BESS Protos BESS CH2
Active β€’ 2028-29 (T-4), 2027-28 (T-4)
5.47 MW
PENN CROFT FARM, FARNHAM, GU10 5PX (1 component) Geocoding Needed

A Distribution Connected Battery Energy Storage System.

Storage (Duration 2h) FLEET BESS LIMITED New Build Generating CMU Lower Larks GU10
Active β€’ 2028-29 (T-4)
20.94 MW
Pembroke Battery Storage Unit, Adjacent to Pembroke Power Station, Pembroke, Dyfed, SA71 5SS (1 component) Geocoding Needed

Battery storage unit

Storage (Duration 2h) RWE GENERATION UK PLC New Build Generating CMU CMU_PMBS-1 SA71
Active β€’ 2028-29 (T-4)
73.29 MW
Park Farm Solar and Battery, Shaftesbury Road, Gillingham, SP8 5JG (2 components) Geocoding Needed

This CMU component represents the BESS system of a co-located (solar and storage) site

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Shaftesbury BESS Shaftesbury BESS SP8
Active β€’ 2027-28 (T-4), 2025-26 (T-1)
7.09 MW
Overlea Farm, New Mills, High Peak, Stockport SK22 4QJ (1 component) Geocoding Needed

A Battery Energy Storage System

Active β€’ 2025-26 (T-4)
3.18 MW
Overlea Farm , New Mills, High Peak, Stockport SK22 4QJ (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Overlea Not Prequalified SK22
Active β€’ 2025-26 (T-4)
Overhill Farm, Rothienorman, Scotland, AB51 8YN (2 components) Geocoding Needed
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2.5 hours.
Active β€’ 2027-28 (T-4), 2025-26 (T-1)
23.40 MW
Loading map...
Showing 25 locations