Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

362 unique locations (1367 components) - Page 5 of 15

lLand off Lincomb Lane, Lincomb, Stourport On Severn, DY13 9RB (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
41.46 MW
Little Raith Farm, Auchtertool, Fife, KY5 0AX (11 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
106.91 MW
Linwood WWTW, Linwood, Paisley, PA3 3DP (1 component)

60MW/120MWh BESS

Active • 2026-27 (T-4)
14.18 MW
Link Road, Launceston, Cornwall, PL15 9LP England (5 components)
• New-Build Li-Ion BESS, 2hr duration.
• Recently-commissioned, existing Li-Ion BESS, 2hr duration.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.13 MW
Leylodge, Aberdeenshire, AB51 0XY (2 components)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
14.15 MW
Leafield Battery Site, Monks Lane, Corsham SN13 9PH (2 components)

electricity storage site comprising brand new batteries, inverters and associated connection plant

Active • 2026-27 (T-4)
7.09 MW
Latteridge Lane, Iron Acton, Tytherington, South Gloucestershire, West of England, England, BS35 3TF (2 components)

A Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
20.73 MW
Lark's Lane, Iron Acton, Latteridge, South Gloucestershire, West of England, England, BS37 9TX (1 component)

A Distribution Connected Battery Energy Storage System.

Active • 2028-29 (T-4)
20.94 MW
Land West Of Slack Lane, Westhoughton, Bolton, BL5 3LB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
6.28 MW
Land West Of Slack Lane, Westhoughton, Bolton BL5 3LB (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
6.28 MW
Land west of Roman Camp Road, Calderwood Broxburn West Lothian EH52 5PF (1 component)

Standalone battery storage system connecting at 33kV to the Broxburn substation

Active • 2025-26 (T-1)
12.90 MW
Land West Of Kegworth Road, Ratcliffe On Soar, Nottinghamshire,NG11 0EA (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
41.84 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (6 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 50MW New Build Battery Storage site
Active • 2025-26 (T-4), 2024-25 (T-4) ...
31.39 MW
Land to the west of Slack Lane, West Houghton, Bolton, Greater Manchester, BL5 3LJ (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
14.51 MW
Land To The West Of Meardsall Lane,, Swinderby,, North Kesteven, LN6 9JA (2 components)

A standalone 2 hour BESS connecting directly onto the DNO network.

Active • 2025-26 (T-1)
0.52 MW
Land to the Westfield Farm, Town Street, Westborough, Newark, NG23 5HG (2 components)

A 2 hour BESS connecting directly to the DNO network.

Active • 2025-26 (T-1)
0.52 MW
30.95 MW
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR (3 components)
• A 49.9 Energy Storage System
• A Lithium Ion Battery Energy Storage System
• A Lithium Ion Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1)
35.25 MW
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (5 components)
• A new build 19MW battery energy storage system
• A new build 20MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
LAND TO THE REAR OF HUMBERSTON SUBSTATION, HUMBERSTON, DN36 4RJ (2 components)

New Build Battery Energy Storage system

Active • 2028-29 (T-4), 2027-28 (T-4)
13.90 MW
Land to the north of Stoke Lane, Norwich, NR14 8QD (2 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.

Active • 2028-29 (T-4)
22.20 MW
Loading map...
Showing 25 locations