Storage (Duration 2h)
159 unique locations (343 components) - Page 5 of 7
Land At Mitchells Ind Park, Barnsley, S73 8HR (12 components)
Battery energy storage unit (2)
Land at Lincomb Farm, Lincomb, Stourport-On-Severn, DY13 9RB (1 component)
Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
Land at Inchbean Farm, Kilmarnock, East Ayrshire, KA1 5JP (1 component)
The CMU component is an energy storage system comprised of lithium ion batteries and associated infrastructure.
Land at Hydes Lane, Hinckley, LE10 3DP (2 components)
Land at Hooks Hole, Chestnut Street, Sittingbourne, Kent, ME9 8DA (1 component)
New Build CMU comprising of battery storage and associated plant
Land at Devilla Forest, Near Culross, Fife, KY12 8EW (2 components)
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (4 components)
Land at Brook Farm, 90 High Street, Loscoe, DE75 7LJ (14 components)
Battery energy storage unit
Land at Broken Cross, S Lanarkshire, ML11 9PB (2 components)
Land at Blackhill Quarry Exeter EX5 1JL (1 component)
44.1MW battery energy storage system with matching import and export capability
Land at Armshead Farm, Armshead Road, Werrington, Staffordshire, ST9 0NB (4 components)
New Build CMU comprising of battery storage and associated plant (2)
Land adjacent to Worset Lane, Hart. TS27 3BL (1 component)
Battery Energy Storage System connecting into the Hartmoor GSP, to connect into the Transmission system via new bay.
Land adjacent to Taunton GSP Substation, Taunton, Somerset, TA4 1AG (3 components)
New Build CMU comprising of battery storage and associated plant
Land adjacent to SSE ( South West to) substation on B9134 Old Brechin Road, Forfar. DD8 3DX (1 component)
"49.9 MW standalone battery energy storage project. The site will comprise of batteries, power conversion systems, transformers, switchgear,monitoring and control systems."
Land adjacent to Berryburn Substation Moray (1 component)
Corshellach Energy Storage Limited is planning to install a 2-hr battery storage system.
Land Adjacent to Belfield Substation, Belfield Road, Rochdale, Manchester, Greater Manchester, OL16 2XX (3 components)
New Build CMU comprising of battery storage and associated plant (2)
Land adjacent Mount Pleasant Farm, Green Lane, Barton, Preston, PR3 0RP (1 component)
Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
Land 300M NE Of Bridge Of Dun Substation Dun Montrose (1 component)
2 hour containerised battery storage
Kintore, Inverurie, Aberdeenshire, AB51 0XY (3 components)
New Build CMU comprising of battery storage and associated plant
Kings Farm, Haddons Lane, North Petherton, Bridgwater, Somerset, TA6 6PG (1 component)
New Build CMU comprising of battery storage and associated plant
Ipswich Road, Cardiff, CF23 9AQ (11 components)
Indian Queens St Denis Cornwall PL26 8BY (2 components)
New build 47.5 MW, 95 MWh battery storage plant
Immingham Road Stallingborough North East Lincolnshire DN41 8BS (1 component)
The construction involves the development of a Battery Storage Energy System on a site close to the grid connection point. The works involve ground works in preparation for the installation …
Home Farm, Front Street, Hart, Hartlepool, TS27 3BL (1 component)
Battery Storage Plant