Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

362 unique locations (1367 components) - Page 6 of 15

Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP, (4 components)

This is a 20MW battery storage facility connected at 33kV.

Inactive • 2023-24 (T-1), 2022-23 (T-1)
14.81 MW
Land at Hydes Lane, Hinckley, LE10 3DP (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
16.07 MW
Land at Impens Farm, Petherton Road, North Newton, Bridgwater, Somerset, TA7 0BB (2 components)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
23.35 MW
Land at Inchbean Farm, Kilmarnock, East Ayrshire, KA1 5JP (1 component)

The CMU component is an energy storage system comprised of lithium ion batteries and associated infrastructure.

Active • 2028-29 (T-4)
8.80 MW
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ (18 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.52 MW
land at Keelings Road, Southminster, CM0 7JF (5 components)
• New build generating CMU component known as Dengie BESS
• New build generating CMU component known as Dengie Solar Park
Active • 2027-28 (T-4), 2025-26 (T-1)
4.43 MW
Land at Legacy Substation, Bronwylfa Road, Legacy, Wrexham, LL14 4HY (2 components)

A Battery Energy Storage System

Active • 2025-26 (T-1)
30.95 MW
Land at Lincomb Farm, Lincomb, Stourport-On-Severn, DY13 9RB (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Active • 2027-28 (T-4)
18.47 MW
Land at Mill Hill Substation, Partingdale Road, Barnet, NW7 1NT (1 component)

A Battery Energy Storage System.

Active • 2027-28 (T-4)
8.77 MW
Land At Mitchells Ind Park, Barnsley, S73 8HR (8 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2027-28 (T-4)
7.13 MW
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF (4 components)
• 49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
• 49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
Active • 2024-25 (T-1), 2023-24 (T-1)
66.80 MW
Land at Nineveh Farm, Nuneham Courtenay, Oxford OX44 9PA (2 components)

Lithium-based battery energy storage system

Active • 2025-26 (T-1)
27.15 MW
Land at Oaklands Farm Featherstone Lane, Wolverhampton, Staffordshire, WV10 7JZ (2 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
22.70 MW
Land at Ocker Hill Substation, Power Way, Tipton, DY4 0PW (1 component)

A Battery Energy Storage System.

Active • 2024-25 (T-1)
12.92 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (5 components)

A Battery Energy Storage System.

Active • 2028-29 (T-4), 2026-27 (T-4)
140.24 MW
15.50 MW
Land at Private Road No.5, Colwick Industrial Estate, Nottingham, NG4 2JU (7 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2026-27 (T-4) ...
2.68 MW
Land at Rothienorman, Badenscoth, Aberdeenshire, Scotland, AB51 8XQ (1 component)

49.9 MW Grid connection Battery Storage site.

Active • 2026-27 (T-4)
9.93 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Active • 2026-27 (T-4)
2.36 MW
Land at Smith Road, Wednesbury, WS10 0PD (2 components)
• New build generating battery storage unit.
• New build generating storage unit
Active • 2028-29 (T-4)
48.64 MW
Land at Sterte Avenue West, Poole, BH15 2AL (20 components)
• A 7 MW Battery Energy Storage System
• A 7.5MW Tesla Battery Energy Storage System
• A 7MW Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-4) ...
11.01 MW
Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (4 components)

Lithium ion battery storage system capable of charging, storing and discharging electricity.

Active • 2028-29 (T-4), 2025-26 (T-1)
5.23 MW
Land at STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (2 components)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16MW, located in Buxton.

Active • 2025-26 (T-1)
19.73 MW
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Active • 2024-25 (T-1)
3.46 MW
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP (2 components)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Active • 2026-27 (T-4)
4.96 MW
Loading map...
Showing 25 locations