Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

521 unique locations (1480 components) - Page 6 of 21

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Home Farm, Front Street, Hart, Hartlepool, TS27 3BL (1 component)

Battery Storage Plant

Storage (Duration 2h) WORCESTERSHIRE SOLAR 1 LIMITED New Build Generating CMU Worcestershire CL TS27
Active • 2027-28 (T-4)
5.08 MW
10.20 MW
Howick Cross Lane, Howick Cross, Penwortham, Hutton, South Ribble, PR1 0NT (1 component)

Standalone battery energy storage system

Storage (Duration 2h) PENWORTHAM (BES) LTD New Build Generating CMU QENER2_PENWORTHAM PR1
Active • 2026-27 (T-4)
9.93 MW
18.76 MW
Hurst Way, Northorpe, Mirfield, Lower Hopton, WF14 8LX (1 component)

A new build 40MW/80MWh battery storage facility connected to the Northern Power Distribution network at 33kV, located in Mirfield, West Yorkshire.

Storage (Duration 2h) MIRFIELD ENERGY STORAGE LTD New Build Generating CMU Mirfield BESS WF14
Active • 2026-27 (T-4)
9.22 MW
Immingham Road Stallingborough North East Lincolnshire DN41 8BS (1 component)

The construction involves the development of a Battery Storage Energy System on a site close to the grid connection point. The works involve ground works in preparation for the installation …

Active • 2028-29 (T-4)
3.24 MW
Indian Queens St Denis Cornwall PL26 8BY (1 component)

New build 47.5 MW, 95 MWh battery storage plant

Storage (Duration 2h) IQ Energy Centre Limited New Build Generating CMU IQBESS50 Not Prequalified PL26
Active • 2027-28 (T-4)
7.24 MW
Ipswich Road, Cardiff, CF23 9AQ (10 components)
• New build two-hour duration battery storage (2)
• New build one-hour duration storage
Active • 2028-29 (T-4), 2026-27 (T-4) ...
25.98 MW
Jameston Farm, Dalry, North Ayrshire, KA24 4EY (1 component)

9 x 2.222MW/4.874MWh storage units installed on designated land within a brownfield site at Jameston Farm, Dalry, North Ayrshire, KA24 4EY.

Storage (Duration 2h) ARRAN VIEW STORAGE LTD New Build Generating CMU Rejected KA24
Active • 2025-26 (T-4)
KIMPTON WOOD SOLAR FARM, SHODDESDEN GRANGE, GREAT SHODDESDEN, ANDOVER SP11 9LP (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site (2)

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Kimpton BESS Kimpton BESS SP11
Active • 2027-28 (T-4), 2025-26 (T-1)
3.32 MW
Kings Farm, Haddons Lane, North Petherton, Bridgwater, Somerset, TA6 6PG (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
5.35 MW
Kintore, Inverurie, Aberdeenshire, AB51 0XY (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Kintore Kintore Not Prequalified AB51
Active • 2028-29 (T-4), 2027-28 (T-4)
13.39 MW
Kirkby Substation,Molly's Lane, Northwood, L33 7TT, England, United Kingdom (1 component)

A Battery Energy Storage System.

Storage (Duration 2h) KIRKBY BATTERY STORAGE LTD New Build Generating CMU Iron Acton L33
Active • 2025-26 (T-4)
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (3 components)

This is a 99.9MW battery storage facility connected at 132kV. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
69.01 MW
Land 300M NE Of Bridge Of Dun Substation Dun Montrose (1 component) Geocoding Needed

2 hour containerised battery storage

Storage (Duration 2h) DUNMILL ENERGY STORAGE LIMITED New Build Generating CMU Dunmill Not Prequalified
Active • 2028-29 (T-4)
7.41 MW
Land 800m North of Suttieside Road, Forfar, Scotland, DD83NL (1 component)

2 hour Battery Energy Storage System

Storage (Duration 2h) SUTTIESIDE BATTERY LIMITED New Build Generating CMU Suttieside Battery DD8
Active • 2028-29 (T-4)
4.36 MW
Land 90 Metres South West Of Noahs Ark Old Gallows Road Perth PH1 1QE (1 component)

49.9 MW standalone battery energy storage project.

Storage (Duration 2h) GLENDEVON ENERGY STORAGE LIMITED New Build Generating CMU Glendoven PH1
Active • 2027-28 (T-4)
5.39 MW
Land adjacent Mount Pleasant Farm, Green Lane, Barton, Preston, PR3 0RP (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Preston0084 Not Prequalified PR3
Active • 2027-28 (T-4)
6.93 MW
Land Adjacent to Belfield Substation, Belfield Road, Rochdale, Manchester, Greater Manchester, OL16 2XX (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Rochdale Rochdale Not Prequalified OL16
Active • 2028-29 (T-4), 2027-28 (T-4)
7.62 MW
Land Adjacent to Belfield Substation, Belfield Road, Rochdale, Manchester, OL16 2XX (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Rochdale Not Prequalified OL16
Active • 2026-27 (T-4)
3.97 MW
Land adjacent to Berryburn Substation Moray (1 component) Geocoding Needed

Corshellach Energy Storage Limited is planning to install a 2-hr battery storage system.

Storage (Duration 2h) CORSHELLACH ENERGY STORAGE LIMITED New Build Generating CMU Corshellach
Active • 2028-29 (T-4)
7.41 MW
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (4 components)
• 49.5MW Battery Energy Storage facility (2)
• 49.9MW Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY (PW) 2 LIMITED New Build Generating CMU PILLSWOOD2 PILLSWOOD2 +2 more HU16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Land Adjacent to No 13 Westerton Road Keith, Moray, Scotland AB55 5FA (2 components)

50MW of BESS to be installed within existing Rotating Stabiliser site. (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
8.48 MW
Land adjacent to Norrington Common BSP, Norrington Lane, Broughton Gifford, Melksham, SN12 8LT (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Norrington Common Not Prequalified SN12
Active • 2026-27 (T-4)
3.59 MW
Land adjacent to Norrington Common BSP, Norrington Lane, Broughton Gifford, Melksham, Wiltshire, SN12 8LT (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Norrington Common Norrington Common Not Prequalified SN12
Active • 2028-29 (T-4), 2027-28 (T-4)
6.71 MW
Loading map...
Showing 25 locations