Storage (Duration 2h)
553 unique locations (1600 components) - Page 6 of 23
Ordsall Lane, Ordsall, Salford Quays, Salford, M5 3NB (2 components) Geocoding Needed
A Battery Energy Storage System
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (4 components) Geocoding Needed
Old Bush Inn PH, Hinksford Lane, Swindon, Wall Heath, South Staffordshire, Staffordshire, West Midlands Combined Authority, England, DY6 0BA (1 component) Geocoding Needed
A Distribution Connected Battery Energy Storage System
Off Letch Lane, Stockton-on-Tees, TS21 1ED (1 component) Geocoding Needed
New Build CMU comprising of battery storage and associated plant.
North Tawton, Sampford Courtenay, West Devon, Devon, England, EX20 2DA, United Kingdom (3 components) Geocoding Needed
30MW/30MWh one hour battery
North of Hull Rd, Osbaldwick, York,YO10 3JA (2 components)
New build battery storage.
North of Hull Rd, Osbaldwick, York, YO10 3JA (2 components) Geocoding Needed
New build battery storage.
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (6 components) Geocoding Needed
Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham, SN12 8LW (3 components) Geocoding Needed
A Battery Energy Storage System
Newton Farm Newton South Queensferry West Lothian, It is to be noted that for Grid Connection correspondence post code of EH30 9SN was used. However, the project site`s post code is yet to be identified. We will notify the DB as soon as the exact post code is available. (6 components) Geocoding Needed
Newton Farm Newton South Queensferry West Lothian It is to be noted that for Grid Connection correspondence post code of EH30 9SN was used. However, the project site`s post code is yet to be identified. We will notify the DB as soon as the exact post cod (6 components)
New Road, Featherstone, Wolverhampton, WV10 7NS (1 component) Geocoding Needed
New Build Generating CMU comprising of battery storage and associated plant.
Newnham Road, Radwell, Baldock, North Hertfordshire, Hertfordshire, England, SG7 5DP (1 component) Geocoding Needed
A Distribution Connected Battery Energy Storage System
Newby Power, Unit 9, Newby Road Industrial Estate, Stockport, SK7 5DA (2 components) Geocoding Needed
Newburth, Perth, Scotland, KY14 6EW (1 component) Geocoding Needed
Storage battery 2h duration
Newburn Bridge Road, Peth Lane Farm, Stella, NE21 4NT (2 components) Geocoding Needed
2 hour containerised battery storage
Netherton Farm, Keith AB55 5PE (14 components) Geocoding Needed
Napoleon Solar Farm, Tonbridge, TN12 6SS (1 component) Geocoding Needed
This CMU component represents a stand-alone BESS system
Mount Stamper Road, St Austell, Cornwall, PL25 5QP (1 component) Geocoding Needed
New-Build Li-Ion BESS, 2hr duration.
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (2 components) Geocoding Needed
The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries.
Mill Hill Farm, Woodend Road, Poynton, SK12 1EG (2 components) Geocoding Needed
A Battery Energy Storage System
Mill Hill Farm, Hazel Grove, SK12 1EG (1 component) Geocoding Needed
A Battery Energy Storage System
McQuittiston Farm, A70, Ochiltree, East Ayrshire, Scotland, KA6 6NF (2 components) Geocoding Needed
Mannington Depot, Telford Way, Swindon, SN5 8BA (2 components) Geocoding Needed
A Battery Energy Storage System
Mannington Depot, Mannington Depot Service Road Mannington, Swindon SN5 8BA (3 components) Geocoding Needed
A Battery Energy Storage System.