Storage (Duration 2h)

553 unique locations (1600 components) - Page 6 of 23

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Ordsall Lane, Ordsall, Salford Quays, Salford, M5 3NB (2 components) Geocoding Needed

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) WESSEX ENERGY STORAGE LTD New Build Generating CMU Not Prequalified M5
Active • 2025-26 (T-4)
2.99 MW
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (4 components) Geocoding Needed
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in NGED's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Storage (Duration 2h) ECOTRICITY (SMART GRID) LIMITED New Build Generating CMU Alveston 10MW Battery Storage Alveston 10MW Battery Storage +1 more BS35
Active • 2026-27 (T-4), 2025-26 (T-1) ...
10.98 MW
Old Bush Inn PH, Hinksford Lane, Swindon, Wall Heath, South Staffordshire, Staffordshire, West Midlands Combined Authority, England, DY6 0BA (1 component) Geocoding Needed

A Distribution Connected Battery Energy Storage System

Storage (Duration 2h) BALANCE ENERGY 21 LTD New Build Generating CMU Mile Flat Not Prequalified DY6
Active • 2028-29 (T-4)
10.37 MW
Off Letch Lane, Stockton-on-Tees, TS21 1ED (1 component) Geocoding Needed

New Build CMU comprising of battery storage and associated plant.

Storage (Duration 2h) SIRIUS ECODEV (CALIFORNIA) LIMITED New Build Generating CMU California Not Prequalified TS21
Active • 2026-27 (T-4)
9.45 MW
North Tawton, Sampford Courtenay, West Devon, Devon, England, EX20 2DA, United Kingdom (3 components) Geocoding Needed

30MW/30MWh one hour battery

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
North of Hull Rd, Osbaldwick, York,YO10 3JA (2 components)

New build battery storage.

Storage (Duration 2h) MONETS GARDEN BATTERY LTD New Build Generating CMU Monets Monets Phase 2 YO10
Active • 2025-26 (T-4)
North of Hull Rd, Osbaldwick, York, YO10 3JA (2 components) Geocoding Needed

New build battery storage.

Active • 2025-26 (T-4)
19.07 MW
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (6 components) Geocoding Needed
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2026-27 (T-4), 2025-26 (T-4)
11.60 MW
Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham, SN12 8LW (3 components) Geocoding Needed

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 004 LIMITED New Build Generating CMU Norrington Gate Farm Norrington Gate Farm +1 more Rejected SN12
Active • 2026-27 (T-4)
79.82 MW
Newton Farm Newton South Queensferry West Lothian, It is to be noted that for Grid Connection correspondence post code of EH30 9SN was used. However, the project site`s post code is yet to be identified. We will notify the DB as soon as the exact post code is available. (6 components) Geocoding Needed
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 20MW import
• Solar photovoltaic generation scheme connected to the distribution network
• bess photovoltaic generation scheme connected to the distribution network (33kV). 29.9MW export and 20MW import
Active • 2027-28 (T-4), 2026-27 (T-4)
37.87 MW
Newton Farm Newton South Queensferry West Lothian It is to be noted that for Grid Connection correspondence post code of EH30 9SN was used. However, the project site`s post code is yet to be identified. We will notify the DB as soon as the exact post cod (6 components)
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 20MW import (2)
• Solar photovoltaic generation scheme connected to the distribution network
Solar Photovoltaic Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) ASE UK HOLDINGS LIMITED New Build Generating CMU Aithrie BESS 3 Aithrie BESS 4 +4 more Rejected EH30
Active • 2027-28 (T-4), 2026-27 (T-4)
37.87 MW
New Road, Featherstone, Wolverhampton, WV10 7NS (1 component) Geocoding Needed

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Shareshill Not Prequalified WV10
Active • 2026-27 (T-4)
9.93 MW
Newnham Road, Radwell, Baldock, North Hertfordshire, Hertfordshire, England, SG7 5DP (1 component) Geocoding Needed

A Distribution Connected Battery Energy Storage System

Storage (Duration 2h) Balance Energy 5 Ltd New Build Generating CMU Radwell Not Prequalified SG7
Active • 2028-29 (T-4)
10.37 MW
Newby Power, Unit 9, Newby Road Industrial Estate, Stockport, SK7 5DA (2 components) Geocoding Needed
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Storage (Duration 2h) Storage (Duration 3h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Newby Power Newby Power SK7
Active • 2027-28 (T-4), 2026-27 (T-4)
3.42 MW
Newburth, Perth, Scotland, KY14 6EW (1 component) Geocoding Needed

Storage battery 2h duration

Storage (Duration 2h) CBS ENERGY STORAGE ASSETS UK LIMITED New Build Generating CMU Not Prequalified KY14
Active • 2028-29 (T-4)
13.61 MW
Newburn Bridge Road, Peth Lane Farm, Stella, NE21 4NT (2 components) Geocoding Needed

2 hour containerised battery storage

Storage (Duration 2h) CAPELLA BESS LTD New Build Generating CMU Capella BESS Ltd (Newcastle) Capella BESS Ltd (Newcastle) NE21
Active • 2027-28 (T-4), 2026-27 (T-4)
35.59 MW
Netherton Farm, Keith AB55 5PE (14 components) Geocoding Needed
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
• Lithium ion battery storage plant
Storage (Duration 2h) Storage (Duration 4h) ZENOBE BLACKHILLOCK LIMITED New Build Generating CMU Blackhillock Blackhillock +2 more AB55
Active • 2026-27 (T-4), 2025-26 (T-4) ...
276.44 MW
Napoleon Solar Farm, Tonbridge, TN12 6SS (1 component) Geocoding Needed

This CMU component represents a stand-alone BESS system

Storage (Duration 2h) LOW CARBON UK SOLAR INVESTMENT COMPANY LIMITED New Build Generating CMU Tonbridge BESS Not Prequalified TN12
Active • 2027-28 (T-4)
2.06 MW
Mount Stamper Road, St Austell, Cornwall, PL25 5QP (1 component) Geocoding Needed

New-Build Li-Ion BESS, 2hr duration.

Storage (Duration 2h) GRIDBEYOND LIMITED New Build Generating CMU PL25
Active • 2028-29 (T-4)
2.09 MW
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (2 components) Geocoding Needed

The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries.

Storage (Duration 2h) SSE BATTERY MONK FRYSTON LIMITED SSE UTILITY SOLUTIONS LIMITED New Build Generating CMU Monk Fryston BESS Phase 1 Monk Fryston BESS Phase 1 LS25
Active • 2027-28 (T-4), 2026-27 (T-4)
107.63 MW
Mill Hill Farm, Woodend Road, Poynton, SK12 1EG (2 components) Geocoding Needed

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Hazel Grove Poynton Battery Not Prequalified SK12
Active • 2025-26 (T-4)
25.82 MW
Mill Hill Farm, Hazel Grove, SK12 1EG (1 component) Geocoding Needed

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Bramhall Not Prequalified SK12
Active • 2025-26 (T-4)
3.18 MW
McQuittiston Farm, A70, Ochiltree, East Ayrshire, Scotland, KA6 6NF (2 components) Geocoding Needed
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
9.71 MW
Mannington Depot, Telford Way, Swindon, SN5 8BA (2 components) Geocoding Needed

A Battery Energy Storage System

Storage (Duration 2h) SW MANNINGTON LIMITED New Build Generating CMU Mannington Mannington SN5
Active • 2024-25 (T-4), 2022-23 (T-1)
34.74 MW
Mannington Depot, Mannington Depot Service Road Mannington, Swindon SN5 8BA (3 components) Geocoding Needed

A Battery Energy Storage System.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
45.03 MW
Loading map...
Showing 25 locations