Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

362 unique locations (1367 components) - Page 6 of 15

Land To The North Of Folly Road, Deanshanger, MK19 6EY (2 components)

A 2 hour BESS connecting directly to the DNO network.

Active • 2025-26 (T-1)
0.52 MW
Land to the north of East Howle Farm Ferryhill DL17 8SA (1 component)

2 hour containerised battery storage

Active • 2028-29 (T-4)
13.82 MW
15.50 MW
Land to the East of Warley Substation Clay Tye Road Upminister RM14 3PL (1 component)

35.000MW standalone battery energy storage

Active • 2027-28 (T-4)
5.39 MW
Land to North of Wey Manor Road, Addlestone, New Haw Surrey, KT15 3JR (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
23.87 MW
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (1 component)

This is a 49.99MW battery storage facility connected at 33kV.

Active • 2025-26 (T-1)
13.16 MW
Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY (3 components)

47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site.

Active • 2027-28 (T-4), 2025-26 (T-1)
31.26 MW
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components)

Lithium-based battery energy storage system.

Active • 2025-26 (T-1), 2024-25 (T-1)
42.29 MW
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (2 components)
• A new build 99.9MW battery energy storage system
• A new build battery energy storage system
Active • 2028-29 (T-4), 2026-27 (T-4)
33.46 MW
Land south of the Rayleigh Main Substation, SS11 8TZ (1 component)

New build generating battery storage unit

Active • 2028-29 (T-4)
83.76 MW
75.38 MW
Land South of National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester, CH66 2HD (2 components)

Standalone Battery Storage Asset

Active • 2025-26 (T-1), 2024-25 (T-1)
28.40 MW
Land South of Inglis Farm, Cockenzie, East Lothian, EH32 0JT (1 component)

New build generating storage asset

Active • 2028-29 (T-4)
20.94 MW
Land South East of the Carrs Fishing Lakes, Letch Lane, Carlton, Stockton-on-Tees, TS21 1EA (1 component)

CMU is a 57MW/114MWh Battery Electric Storage System, which will connect to the Transmission network via a tertiary winding at the Norton 275kV substation. The Facility will comprise of 32 …

Active • 2027-28 (T-4)
5.76 MW
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4), 2025-26 (T-1)
32.75 MW
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (6 components)
• A 48MW battery energy storage system
• A 49.5MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.04 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (12 components)

Battery Storage Plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
68.11 MW
10.43 MW
Land On The South East Side Of Medlock Road, Failsworth, Manchester M35 9WG (1 component)

A 30MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
6.28 MW
Loading map...
Showing 25 locations