Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

159 unique locations (343 components) - Page 6 of 7

Green Lane, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (1 component)

A New build generating storage CMU

Active • 2028-29 (T-4)
10.47 MW
Former Sanmex Site, Land at Dalmarnock Road, Rutherglen, South Lanarkshire, G73 1NY (2 components)
• New Build Battery Storage
• New build battery Storage
Active • 2028-29 (T-4)
15.22 MW
Farnham Battery Storage, Wrecclesham Hill, Farnham, GU10 4JU (2 components)

A new build 20MW battery energy storage system

Inactive • 2023-24 (T-1)
7.40 MW
Elvanfoot BESS, Leadhills Road, Elvanfoot, ML12 6TE (1 component)

circa 10MW 2hr lithium Ion battery system connected at 33kV to the SPT transmission system

Active • 2027-28 (T-4)
1.51 MW
Dunkeswell Power Generation Plant, Unit 24A, Flightway, Dunkeswell Business Bark, Honiton, Devon, EX14 4LG (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
0.50 MW
Duniface Farm, Windygates, Fife, KY8 5RH (1 component)

New build Battery Energy Storage CMU

Active • 2028-29 (T-4)
3.19 MW
Dunbar BESS, Dunbar, East Lothian, EH42 1RG, Scotland, UK (1 component)

Total Connection capacity of 49.99MW for Energy Storage. The component will be LFP BESS.

Active • 2028-29 (T-4)
8.17 MW
Dounreay, Thurso KW14 7RE (2 components)
• A 34MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
21.31 MW
Dolphingstone Farm, Cockenzie, East Lothian, EH21 8GW (1 component)

The CMU component is an energy storage system comprised of lithium ion batteries with associated infrastructure

Active • 2028-29 (T-4)
9.21 MW
Deep Lane BESS, Plympton, Devon, PL7 5AA (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4)
6.60 MW
DB Cargo, Toton, Nottingham, NG10 1HA (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
2.24 MW
Dadglow Farm, Bishops Itchington, Southam, CV47 2SW (1 component)

A 20MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
4.19 MW
Cooklands farm, Old Snydale, Pontefract, WF7 6HA (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.47 MW
Comhampton Lane, Stourport-on-Severn, DY13 9ST (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
3.62 MW
Coal Aston, Dronfield, S18 3AA (2 components)
• A 45MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
28.21 MW
Claire Court, Rotherham - former Prince of Wales Power Station, Rotherham, South Yorkshire, S60 1RU (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
4.18 MW
Church Road, Chelmsford, CM2 8UN (1 component)

This CMU component represents the BESS system of a co-located (solar and storage) site

Active • 2027-28 (T-4)
3.72 MW
Childerley Farm, Dry Drayton, Cambridgeshire, United Kingdom, CB23 8BA (1 component)

New build BESS alongside new build solar farm.

Active • 2028-29 (T-4)
6.20 MW
Chesterfield Road, Sheffield, West Yorkshire, S26 4XB (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4)
6.45 MW
Chapelton, Fraserburgh, Aberdeenshire, Scotland, AB43 7BL (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2027-28 (T-4)
4.62 MW
Catahoula Fields, Eglantine Lane, Farningham, Kent, DA4 9JL (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
0.68 MW
Castlelaurie Industrial Estate, Bankside, Falkirk FK2 7XF (1 component)

New build battery storage

Active • 2028-29 (T-4)
7.66 MW
Calow Green, Calow, North East Derbyshire, S44 5XQ (8 components)

A stand alone Battery Energy Storage System.

Active • 2028-29 (T-4), 2027-28 (T-4)
8.17 MW
Burton Enterprise Park Hawkins Lane Burton upon Trent Staffordshire DE14 1QG (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
5.24 MW
Loading map...
Showing 25 locations