Storage (Duration 2h)

358 unique locations (1544 components) - Page 7 of 15

land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (4 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Inactive •
Land At Westerton Road, Keith, Moray, AB55 5NR (3 components)

CMU 24KEI4 is a battery storage CMU.

Active • 2028-29 (T-4)
14.46 MW
Land close to Smeaton Shaw Farm, Dalkeith, EH22 2NL (1 component)

2H duration Lithium Ion Battery Storage New Build CMU.

Active • 2028-29 (T-4)
35.18 MW
Land east of A981, Fraserburgh, Aberdeenshire (5 components)

12 x 3.800MW / 7.491MWh storage units installed on land adjacent to A981, Fraserburgh

Inactive •
Land East of Bowbridge Lane, New Balderton, Newark, Nottinghamshire, NG24 3BY (2 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
8.16 MW
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (5 components)

New Build Battery Energy Storage system

Active • 2028-29 (T-4)
30.99 MW
Land lying to the east of Rectory Lane, Upton Warren, Bromsgrove, B61 7ET (1 component)

This is a 29.700 MW battery storage facility connected at 66kV.

Active • 2028-29 (T-4)
4.67 MW
20.94 MW
Loading map...
Showing 25 locations