Storage (Duration 2h)
362 unique locations (1367 components) - Page 7 of 15
Land at The Magazine, Hull Road, Selby, YO8 5BJ (27 components)
Land at Tuxton Farm, Plympton, Plymouth, PL7 5AA (1 component)
New Build Generating CMU comprising of battery storage and associated plant.
Land at Vause Farm, Town Lane, Charnock Richard, Chorley, PR7 5HL (1 component)
New Build CMU comprising of battery storage and associated plant
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL (2 components)
Battery Storage Plant
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (4 components)
Land At Westerton Road, Keith, Moray, AB55 5NR (2 components)
CMU 24KEI4 is a battery storage CMU.
LAND BETWEEN SHILTON COTTAGE AND M898, SHILTON LANE, BISHOPTON. DRUMCROSS FARM, DRUMCROSS ROAD, BISHOPTON, PA7 5NU (5 components)
BATTERY STORAGE PLANT
Land close to Smeaton Shaw Farm, Dalkeith, EH22 2NL (1 component)
2H duration Lithium Ion Battery Storage New Build CMU.
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (3 components)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 component)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
LAND EAST AND WEST OF HONILEY ROAD (A4177), HONILEY, KENILWORTH, WARWICKSHIRE (1 component)
A 49.400 MW / 98.800 MWh battery energy storage system
Land east of A981, Fraserburgh, Aberdeenshire (4 components)
12 x 3.800MW / 7.491MWh storage units installed on land adjacent to A981, Fraserburgh
Land East of Bowbridge Lane, New Balderton, Newark, Nottinghamshire, NG24 3BY (2 components)
New Build CMU comprising of battery storage and associated plant
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (4 components)
New Build Battery Energy Storage system
Land East of Langford Mill and Tye Farm, Langford, Devon, EX15 2JY (1 component)
Battery storage
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (2 components)
Lithium-based battery energy storage system
Land lying to the east of Rectory Lane, Upton Warren, Bromsgrove, B61 7ET (1 component)
This is a 29.700 MW battery storage facility connected at 66kV.
Land Lying To The South Of Manor Farm, Ratcliffe On Soar, Nottingham NG11 0EA (1 component)
Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
Land lying to the south west of Rouncil Lane, Kenilworth (CV8 1NN) (1 component)
Battery energy storage system, together with associated equipment, infrastructure and ancillary works.
LAND LYING TO THE WEST OF STEPHENSON ROAD, WILSDEN, BRADFORD, BD15 0BZ (1 component)
New Build Battery Storage
Land Near To Monks House, Westerleigh, BS37 8RD (1 component)
BESS with Lit-Ion technology, 2 hours duration
Land Next To Bojea Farm, St Austell, PL25 5RU (1 component)
The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (2 components)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.