Land adjacent to Salisbury Substation, Salisbury, SP2 0BL (1 component)

49.5MW Battery Energy Storage System

Storage (Duration 2h) SSE BATTERY SALISBURY LIMITED New Build Generating CMU Not Prequalified SP2
Active • 2024-25 (T-4)
Land adjacent to SSE ( South West to) substation on B9134 Old Brechin Road, Forfar. DD8 3DX (1 component)

"49.9 MW standalone battery energy storage project. The site will comprise of batteries, power conversion systems, transformers, switchgear,monitoring and control systems."

Active • 2027-28 (T-4)
5.39 MW
Land adjacent to Taunton GSP Substation, TA4 1AG (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
7.09 MW
Land adjacent to Taunton GSP Substation, Taunton, Somerset, TA4 1AG (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Taunton Taunton TA4
Active • 2028-29 (T-4), 2027-28 (T-4)
13.41 MW
LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX (4 components)
• Battery Energy Storage System
• Energy Storage Site
• New Build 33 MW Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HEIT WG LIMITED New Build Generating CMU Wormald Green BESS Wormald Green ESS +1 more HG3
Active • 2026-27 (T-4), 2025-26 (T-1) ...
30.43 MW
Land adjacent to Worset Lane, Hart. TS27 3BL (1 component)

Battery Energy Storage System connecting into the Hartmoor GSP, to connect into the Transmission system via new bay.

Storage (Duration 2h) FIELD HARTMOOR LTD New Build Generating CMU TS27
Active • 2028-29 (T-4)
35.47 MW
Land Adjacent Unit 66 Gravelly Industrial Park Walker Dr, Birmingham B24 9AW (1 component)

The CMU is a new build 50MW/100MWh battery storage facility connected to the Western Power distribution network at 33kV, located at the Gravelly Industrial Park, Birmingham.

Storage (Duration 2h) GRAVELLY ENERGY STORAGE LTD New Build Generating CMU Not Prequalified B24
Active • 2026-27 (T-4)
11.58 MW
LAND ADJOINING BATES ROAD QUAYSIDE INDUSTRIAL ESTATE MALDON CM9 5FA (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Bates Power Not Prequalified CM9
Active • 2024-25 (T-4)
Land adjoining Outclough Farm, Chatterley, Whitfield, Biddulph Road, Stoke on Trent, ST6 8UW (1 component)

The construction of a new build Battery Energy Storage System (BESS) will comprise of a number of new Batteries supplied by Trina Storage Elementa 2.0 solution and associated equipment required …

Storage (Duration 2h) CHATTERLEY ENERGY STORAGE LIMITED New Build Generating CMU Chatterley ST6
Active • 2028-29 (T-4)
10.45 MW
Land and buildings lying to the East and West of Swinderby Road, Eagle and Swinethorpe being part of the Eagle Hall Estates, LN6 9JA (1 component)

A 2 hour BESS connected directly to the DNO network

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 5 Not Prequalified LN6
Active • 2025-26 (T-1)
0.26 MW
LAND AND BUILDINGS ON THE SOUTH EAST SIDE AND ON THE NORTH WEST SIDE OF CRANBORNE ROAD POTTERS BAR EN6 3JF (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Cranborne Power Not Prequalified EN6
Active • 2024-25 (T-4)
Land at Armshead Farm, Armshead Road, Werrington, ST9 0NB (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Cellarhead Not Prequalified ST9
Active • 2026-27 (T-4)
14.18 MW
Land at Armshead Farm, Armshead Road, Werrington, Staffordshire, ST9 0NB (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Cellarhead Cellarhead Not Prequalified ST9
Active • 2028-29 (T-4), 2027-28 (T-4)
27.04 MW
Land at Axminster Substation, Pound Road, Axminster, Devon, EX13 5RX (4 components)

A Battery Energy Storage System (3)

Storage (Duration 2h) HB825AXM LTD HB411MIN LTD New Build Generating CMU Axminster Axminster +2 more Not Prequalified EX13
Active • 2027-28 (T-4), 2026-27 (T-4) ...
19.47 MW
Land at Bilbo Farm, Crimond, Fraserburgh, AB43 8YP (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) LEL BILBO BATTERY LIMITED New Build Generating CMU Bilbo AB43
Active • 2025-26 (T-4)
Land at Birkhill Commercial Park, Coalburn, S Lanarkshire, ML11 0FT (3 components)
• New Build Battery Storage (2)
• New build battery storage
Storage (Duration 2h) ALCEMI STORAGE DEVELOPMENTS 4 LIMITED New Build Generating CMU COALB1 COALB1 +1 more ML11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
197.67 MW
Land at Birkin Lane, Grassmoor, Chesterfield, S42 5BP (1 component)

A 2 hour BESS connected directly to the DNO network

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 3 Not Prequalified S42
Active • 2025-26 (T-1)
0.26 MW
Land At Bishops Bowl Fishery Stratford-upon-Avon CV47 2SR (14 components)

Battery energy storage unit (2)

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Bishops Bowl Bishops Bowl CV47
Active • 2028-29 (T-4), 2027-28 (T-4)
14.52 MW
Land at Blackhill Quarry Exeter EX5 1JL (1 component)

44.1MW battery energy storage system with matching import and export capability

Storage (Duration 2h) LIVERTON BUSINESS PARK 2011 LIMITED New Build Generating CMU Blackhill Quarry Rejected EX5
Active • 2027-28 (T-4)
6.79 MW
Land at Boreham Street Farm, Boreham Street, Hailsham, Sussex, BN27 4SJ (1 component)

A Battery Energy Storage System

Storage (Duration 2h) PD100NIN LTD New Build Generating CMU Ninfield Not Prequalified BN27
Active • 2025-26 (T-4)
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (6 components)

A new build 11MW battery storage system (3)

Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT BD LIMITED New Build Generating CMU BROADDITCH BROADDITCH +3 more Rejected DA13
Active • 2025-26 (T-4), 2024-25 (T-4) ...
3.85 MW
Land at Broken Cross, S Lanarkshire, ML11 9PB (2 components)
• New Build Battery Storage
• New build battery storage
Storage (Duration 2h) ALCEMI STORAGE DEVELOPMENTS 6 LIMITED New Build Generating CMU COALB2 Coalburn2Supplemental ML11
Active • 2028-29 (T-4), 2027-28 (T-4)
61.83 MW
Land at Brook Farm, 90 High Street, Loscoe, DE75 7LJ (14 components)

Battery energy storage unit (2)

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Brook Farm Brook Farm Not Prequalified DE75
Active • 2028-29 (T-4), 2027-28 (T-4)
14.52 MW
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)

A new build 49.5MW battery energy storage system (3)

Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT BF LIMITED New Build Generating CMU BUMPERS BUMPERS +7 more HP27
Active • 2026-27 (T-4), 2025-26 (T-4) ...
65.35 MW
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (5 components)
• A New Build Battery Energy Storage System (2)
• A New Build Gas fuelled power plant at Capenhurst substation
Reciprocating engines Storage (Duration 2h) HD888CAP LIMITED New Build Generating CMU CAPENHURST CAPENHURST +2 more CH66
Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.92 MW