Malton Road, Malton YO17 8JF (1 component) Geocoding Needed

A 40MW new build of battery storage unit.

Active • 2027-28 (T-4)
6.16 MW
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components) Geocoding Needed
• New build one-hour duration storage to replace diesel plant
• New build two-hour duration storage to replace diesel plant
Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.97 MW
Lowfields Way, Lowfields Business Park, HX5 9DA (5 components) Geocoding Needed
• BATTERY STORAGE PLANT
• New build battery storage
• New build generating storage unit
Storage (Duration 2h) UK BATTERY STORAGE LTD GREENGRIDPOWER1 LTD New Build Generating CMU Elland Elland +2 more HX5
Active • 2028-29 (T-4), 2025-26 (T-4) ...
61.26 MW
London Road, Holyhead, Isle of Anglesey, Wales, LL65 2TJ, United Kingdom (1 component) Geocoding Needed

2 hour 210 MW battery Storage new build

Storage (Duration 2h) ANGLESEY LAND HOLDINGS LIMITED New Build Generating CMU Anglesey Penrhos BESS LL65
Active • 2027-28 (T-4)
32.32 MW
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG. (6 components) Geocoding Needed

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) MELKSHAM WEST STORAGE LIMITED New Build Generating CMU Melksham West Storage1 Melksham West Storage1 +3 more SN12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
37.03 MW
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG (6 components) Geocoding Needed

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) MELKSHAM EAST STORAGE LIMITED New Build Generating CMU Melksham East Storage1 Melksham East Storage1 +3 more SN12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
36.80 MW
lLand off Lincomb Lane, Lincomb, Stourport On Severn, DY13 9RB (1 component) Geocoding Needed

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
20.73 MW
lLand off Lincomb Lane, Lincomb, Stourport On Severn, DY13 9RB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU WORCESTER091 Rejected DY13
Active • 2028-29 (T-4)
20.73 MW
Little Raith Farm, Auchtertool, Fife, KY5 0AX (7 components) Geocoding Needed
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HEIT LR LIMITED New Build Generating CMU LR22 LR22 +3 more KY5
Active • 2025-26 (T-4), 2024-25 (T-4) ...
101.29 MW
Linwood WWTW, Linwood, Paisley, PA3 3DP (1 component) Geocoding Needed

60MW/120MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU LINWOOD Not Prequalified PA3
Active • 2026-27 (T-4)
14.18 MW
Linton, Highnam, Tewkesbury, Gloucestershire GL2 8AA (2 components) Geocoding Needed

Energy facility comprising of battery energy storage sets and ancillary equipment.

Storage (Duration 2h) STOR 136 LTD New Build Generating CMU Linton Linton GL2
Active • 2027-28 (T-4), 2026-27 (T-4)
38.98 MW
Link Road, Launceston, Cornwall, PL15 9LP England (3 components) Geocoding Needed
• New-Build Li-Ion BESS, 2hr duration.
• Recently-commissioned, existing Li-Ion BESS, 2hr duration.
Storage (Duration 2h) GRIDBEYOND LIMITED New Build Generating CMU PL15
Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.11 MW
Leylodge, Aberdeenshire, AB51 0XY (2 components) Geocoding Needed
• New Build CMU comprising of Solar PV and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Solar Photovoltaic Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Keynesham Kintore Not Prequalified AB51
Active • 2026-27 (T-4)
8.27 MW
Leafield Battery Site, Monks Lane, Corsham SN13 9PH (4 components) Geocoding Needed

electricity storage site comprising brand new batteries, inverters and associated connection plant

Active • 2026-27 (T-4), 2025-26 (T-4)
19.03 MW
Latteridge Lane, Iron Acton, Tytherington, South Gloucestershire, West of England, England, BS35 3TF (2 components) Geocoding Needed

A Distribution Connected Battery Energy Storage System

Storage (Duration 2h) BALANCE ENERGY 11 LTD New Build Generating CMU Iron Acton 1 Iron Acton 2 BS35
Active • 2028-29 (T-4)
20.73 MW
LAND WITHIN HUNSHELF COMPOUND, TOFT'S LANE, OXSPRING, BARNSLEY, S36 8WR (2 components) Geocoding Needed
• New Build 25 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY HS (JV) LIMITED New Build Generating CMU Hunshelf ESS Hunshelf ESS S36
Active • 2027-28 (T-4), 2026-27 (T-4)
7.52 MW
Land West Of Slack Lane, Westhoughton, Bolton, BL5 3LB (1 component) Geocoding Needed

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Bolton088 BL5
Active • 2028-29 (T-4)
6.28 MW
Land West Of Slack Lane, Westhoughton, Bolton BL5 3LB (1 component) Geocoding Needed

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Bolton096 Not Prequalified BL5
Active • 2028-29 (T-4)
3.14 MW
Land west of Roman Camp Road, Calderwood, Broxburn, West Lothian, EH52 5PF (2 components) Geocoding Needed

Standalone battery storage system connecting at 33kV to the Broxburn substation

Active • 2027-28 (T-4), 2025-26 (T-1)
19.47 MW
Land west of Roman Camp Road, Calderwood Broxburn West Lothian EH52 5PF (1 component)

Standalone battery storage system connecting at 33kV to the Broxburn substation

Storage (Duration 2h) BROXBURN ENERGY STORAGE LIMITED New Build Generating CMU Broxburn EH52
Active • 2025-26 (T-1)
12.90 MW
Land West Of Kegworth Road, Ratcliffe On Soar, Nottinghamshire,NG11 0EA (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU RATCLIFFE093 Rejected NG11
Active • 2028-29 (T-4)
20.92 MW
Land West Of Kegworth Road, Ratcliffe On Soar, Nottinghamshire, NG11 0EA (1 component) Geocoding Needed

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
20.92 MW
Land West of Blackpit Lane, Awbridge Farm, Lower Penn, Wolverhampton, Staffordshire, WV4 4YA (2 components) Geocoding Needed

New Build Battery Storage site.

Active • 2028-29 (T-4), 2027-28 (T-4)
17.27 MW
Land west of Blackpit Lane, Awbridge Farm, Lower Penn, Wolverhampton, Staffordshire, WV4 4YA (4 components) Geocoding Needed

New Build Battery Storage Site.

Active • 2028-29 (T-4), 2027-28 (T-4)
27.31 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components) Geocoding Needed
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR WELKIN MILL LIMITED New Build Generating CMU Welkin Mill 1 Welkin Mill 1 +5 more SK6
Active • 2025-26 (T-4), 2024-25 (T-4) ...
46.27 MW
Loading map...
Showing 25 locations