Storage (Duration 2h)

521 unique locations (1480 components) - Page 8 of 21

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (3 components)
• A New Build Gas fuelled power plant at Kirkby substation. (2)
• A New Build Transmission Connected Battery Energy Storage System.
Reciprocating engines Storage (Duration 2h) KIRKBY BATTERY STORAGE LTD New Build Generating CMU KIRKBY Kirkby BESS L33
Active • 2027-28 (T-4), 2023-24 (T-4) ...
7.62 MW
Land at Crown Farm, adjacent to Walpole Bank Road, Walpole, PE14 7JA (2 components)
• CMU ID 22KIN4, a new build battery storage CMU
• CMU ID 23KIN4, a new build battery storage CMU
Storage (Duration 2h) Storage (Duration 9h) TALSIE CROWN BESS LIMITED New Build Generating CMU Kings Lynn Kings Lynn Not Prequalified PE14
Active • 2027-28 (T-4), 2026-27 (T-4)
32.75 MW
Land at Davies Road, Blackburn, Lancashire BB1 3HR (2 components)
• CMU ID 22WHI4, a new build battery storage CMU
• CMU ID 24WHI1, a new build battery storage CMU
Storage (Duration 2h) FIELD WHITEBIRK LTD New Build Generating CMU Whitebirk Whitebirk BB1
Active • 2026-27 (T-4), 2025-26 (T-1)
11.12 MW
Land at Devilla Forest, Near Culross, Fife, KY12 8EW (2 components)
• New Build Battery Storage
• New build battery storage
Storage (Duration 2h) ALCEMI STORAGE DEVELOPMENTS 3 LIMITED New Build Generating CMU DEVILL DevillaSupplemental KY12
Active • 2028-29 (T-4), 2027-28 (T-4)
61.83 MW
LAND AT DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB (Nearest Postcode: SS11 8UA). (9 components)

Battery Storage Plant (3)

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 3h) DOLLYMANS STORAGE LIMITED New Build Generating CMU Dollymans Storage Dollymans Storage +4 more SS11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
28.86 MW
Land at Duddingston, Newton, West Lothian, EH30 9SN (1 component)

20MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

Storage (Duration 2h) TOTLEYWELLS NET ZERO LIMITED New Build Generating CMU Aithrie Net Zero BESS EH30
Active • 2028-29 (T-4)
4.19 MW
Land at Dunhams Lane, Letchworth Garden City, SG6 1JH (2 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Letchworth Power SG6
Active • 2026-27 (T-4), 2025-26 (T-4)
1.20 MW
LAND AT DUNHAMS LANE LETCHWORTH GARDEN CITY SG6 1JH (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Letchworth Power Not Prequalified SG6
Active • 2024-25 (T-4)
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System. (2)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.46 MW
Land at Fairholme, SN16 9PW (2 components)

A Battery Energy Storage System. (2)

Storage (Duration 2h) HB222BRI LTD New Build Generating CMU Minety 5 Minety 5 Not Prequalified SN16
Active • 2026-27 (T-4), 2025-26 (T-4)
11.22 MW
Land at Finns Barn, Wellow Road, Eakring, Newark, NG22 0FW (1 component)

A standalone 0.949MW BESS connected directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 1 Not Prequalified NG22
Active • 2025-26 (T-1)
0.26 MW
Land at Frodo Solar Farm, Moss-side, Crimond, Fraserburgh, Grampian, AB43 8YH (1 component)

New Build CMU comprising of battery storage and associated plant.

Storage (Duration 2h) LEL FRODO BATTERY LIMITED New Build Generating CMU Frodo AB43
Active • 2026-27 (T-4)
2.36 MW
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (19 components)
• Battery storage unit (2)
• New reciprocating gensets in acoustic enclosure
Reciprocating engines Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Fulwood Rd Fulwood Road - Battery +2 more NG17
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Land at Gagie Home Farm Holdings, Tealing, DD4 0PR (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) SIRIUS ECODEV (TEALING) LTD New Build Generating CMU Tealing Not Prequalified DD4
Active • 2026-27 (T-4)
7.56 MW
Land at Gagie Home Farm Holdings, Tealing, DD5 3PP (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) SIRIUS ECODEV (TEALING) LTD New Build Generating CMU Tealing Not Prequalified DD5
Active • 2025-26 (T-4)
Land at Guilsborough Lodge Farm, West Haddon Road, Guilsborough, Northampton, NN6 8QE (1 component)

A standalone 0.949MW Battery Energy Storage System connected directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 1 Not Prequalified NN6
Active • 2025-26 (T-1)
0.26 MW
Land at Harrow Lane, Bulphan, Thurrock, Essex RM14 3RE (2 components)

Lithium-based battery energy storage system. (2)

Storage (Duration 2h) WARLEY GREEN LIMITED New Build Generating CMU WARLEY RM14
Active • 2025-26 (T-1), 2024-25 (T-1)
24.91 MW
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP, (4 components)

This is a 20MW battery storage facility connected at 33kV. (3)

Storage (Duration 2h) Storage (Duration 1.5h) HAWKERS HILL ENERGY PARK LIMITED New Build Generating CMU Hawkers Hill Hawkers Hill +2 more SP7
Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.71 MW
Land at Hooks Hole, Chestnut Street, Sittingbourne, Kent, ME9 8DA (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Sittingbourne BESS Not Prequalified ME9
Active • 2027-28 (T-4)
3.84 MW
Land at Hydes Lane, Hinckley, LE10 3DP (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
16.07 MW
Land at Impens Farm, Petherton Road, North Newton, Bridgwater, Somerset, TA7 0BB (2 components)

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU BRIDGWATER 2 WEST BURTON TA7
Active • 2026-27 (T-4)
23.35 MW
Land at Inchbean Farm, Kilmarnock, East Ayrshire, KA1 5JP (1 component)

The CMU component is an energy storage system comprised of lithium ion batteries and associated infrastructure.

Storage (Duration 2h) BSSL EAST AYRSHIRE 1 LTD New Build Generating CMU Inchbean Not Prequalified KA1
Active • 2028-29 (T-4)
8.80 MW
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (2 components)
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant.
Reciprocating engines Storage (Duration 2h) HD000ACT LTD New Build Generating CMU Iron Acton Iron Acton 2 Rejected BS37
Active • 2027-28 (T-4), 2024-25 (T-4)
10.79 MW
Land at Iron Acton Substation, Larks Lane, Iron Acton, South Gloucestershire, BS37 9TX (2 components)

A Battery Energy Storage System. (2)

Storage (Duration 2h) HD000ACT LTD New Build Generating CMU Fairholme Minety BS37
Active • 2027-28 (T-4), 2025-26 (T-4)
7.31 MW
Land at Jamesfield Farm, Abernethy, Fife, KY14 6EW (2 components)

A new build 19MW battery energy storage system (2)

Active • 2025-26 (T-4), 2024-25 (T-1)
4.31 MW
Loading map...
Showing 25 locations