Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

553 unique locations (1600 components) - Page 8 of 23

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Land to the west of Slack Lane, West Houghton, Bolton, Greater Manchester, BL5 3LJ (2 components) Geocoding Needed

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Bolton B Bolton B BL5
Active • 2028-29 (T-4), 2027-28 (T-4)
8.18 MW
Land to the west of Pound Road, Axminster EX13 5UP (2 components) Geocoding Needed
• A 120.000 MW / 180.000 MWh battery energy storage system
• A 120.000 MW / 240.000 MWh battery energy storage system
Active • 2027-28 (T-4), 2026-27 (T-4)
42.18 MW
Land to the west of Pound Road, Axminster EX135UP (2 components)
• A 120.000 MW / 180.000 MWh battery energy storage system
• A 120.000 MW / 240.000 MWh battery energy storage system
Storage (Duration 2h) Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU AXMINSTER Axminster - Pound Rd Not Prequalified EX13
Active • 2027-28 (T-4), 2026-27 (T-4)
42.18 MW
Land To The West Of Meardsall Lane,, Swinderby,, North Kesteven, LN6 9JA (1 component)

A standalone 2 hour BESS connecting directly onto the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 3 Not Prequalified LN6
Active • 2025-26 (T-1)
0.26 MW
Land To The West Of Meardsall Lane, Swinderby, North Kesteven, LN6 9JA (1 component) Geocoding Needed

A standalone 2 hour BESS connecting directly onto the DNO network.

Active • 2025-26 (T-1)
0.26 MW
Land to the Westfield Farm, Town Street, Westborough, Newark, NG23 5HG (1 component) Geocoding Needed

A 2 hour BESS connecting directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 4 Not Prequalified NG23
Active • 2025-26 (T-1)
0.26 MW
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (1 component)

Battery Project on Greenfield Site

Storage (Duration 2h) SIZING JOHN LIMITED New Build Generating CMU Sizing John WA9
Active • 2024-25 (T-1)
12.92 MW
Land to the south of National Grid's Rainhill substation, Lea Green Road, Rainhill WA9 4QD (1 component) Geocoding Needed

Battery project on greenfield site

Storage (Duration 2h) SIZING JOHN LIMITED New Build Generating CMU Sizing John WA9
Active • 2025-26 (T-1)
15.48 MW
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR (4 components) Geocoding Needed
• A 49.9 Energy Storage System
• A Lithium Ion Battery Energy Storage System
• A Lithium Ion Energy Storage System
Storage (Duration 2h) Storage (Duration 1.5h) HEIT HP LIMITED New Build Generating CMU Hawthorn Pit Hawthorn Pit BESS +2 more SR7
Active • 2026-27 (T-4), 2025-26 (T-1) ...
46.36 MW
Land to the South of Hawkesbury Hall Farm, Parrotts Grove, Coventry, CV2 1NQ (1 component) Geocoding Needed

98 MW / 196MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU HAWKESBURY HALL Not Prequalified CV2
Active • 2026-27 (T-4)
23.16 MW
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (5 components) Geocoding Needed
• A new build 19MW battery energy storage system
• A new build 20MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT FM LIMITED New Build Generating CMU FARNHAM FARNHAM +2 more GU10
Active • 2025-26 (T-4), 2024-25 (T-4) ...
28.73 MW
LAND TO THE REAR OF HUMBERSTON SUBSTATION, HUMBERSTON, DN36 4RJ (3 components) Geocoding Needed
• New Build 49.9MW Battery Energy Storage system
• New Build Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY HB (JV) LIMITED New Build Generating CMU Humberston ESS Humberston ESS +1 more Not Prequalified DN36
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.77 MW
Land to the north of Stoke Lane, Norwich, NR14 8QD (3 components) Geocoding Needed
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
Storage (Duration 2h) FLEXION ENERGY SPV 2 LTD FPC ELECTRIC LAND LIMITED New Build Generating CMU Norwich B1 Norwich B1 +1 more NR14
Active • 2028-29 (T-4), 2026-27 (T-4)
34.73 MW
Land To The North Of Folly Road, Deanshanger, MK19 6EY (1 component) Geocoding Needed

A 2 hour BESS connecting directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 5 Not Prequalified MK19
Active • 2025-26 (T-1)
0.26 MW
Land to the north of East Howle Farm, Ferryhill, DL17 8SA (1 component) Geocoding Needed

2 hour containerised battery storage

Active • 2028-29 (T-4)
13.82 MW
Land to the north of East Howle Farm Ferryhill DL17 8SA (1 component)

2 hour containerised battery storage

Storage (Duration 2h) SPENNYMOOR ENERGY STORAGE LIMITED New Build Generating CMU Spennymoor DL17
Active • 2028-29 (T-4)
13.82 MW
Land to the north of Chickerell National Grid substation, directly south of Coldharbour, DT3 4BG (1 component) Geocoding Needed

Battery Storage Plant

Storage (Duration 2h) CHICKERELL STORAGE LIMITED New Build Generating CMU Chickerell Storage Limited Not Prequalified DT3
Active • 2027-28 (T-4)
61.56 MW
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (3 components) Geocoding Needed
• New Build 49.5 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY FW LIMITED New Build Generating CMU Flatworth ESS Flatworth ESS +1 more NE29
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.70 MW
5.39 MW
Land to North of Wey Manor Road, Addlestone, New Haw Surrey, KT15 3JR (1 component) Geocoding Needed

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) EL (WEST WEYBRIDGE) LIMITED New Build Generating CMU BYFLEET090 KT15
Active • 2028-29 (T-4)
11.94 MW
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components) Geocoding Needed

This is a 49.99MW battery storage facility connected at 33kV.

Storage (Duration 2h) Storage (Duration 1.5h) ROARING HILL ENERGY STORAGE LTD New Build Generating CMU Roaring Hill Roaring Hill +1 more KY6
Active • 2026-27 (T-4), 2025-26 (T-1) ...
33.35 MW
Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY (2 components) Geocoding Needed

47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site.

Storage (Duration 2h) Storage (Duration 1.5h) SAMBAR POWER LIMITED New Build Generating CMU Indian Queens BESS Indian Queens BESS 1 PL26
Active • 2027-28 (T-4), 2025-26 (T-1)
18.37 MW
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components) Geocoding Needed

Lithium-based battery energy storage system.

Storage (Duration 2h) Storage (Duration 1.5h) WALPOLE GREEN LIMITED New Build Generating CMU Walpole Walpole +1 more PE14
Active • 2026-27 (T-4), 2025-26 (T-1) ...
35.70 MW
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components) Geocoding Needed
• A new build 99.9MW battery energy storage system
• A new build battery energy storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY WB (JV) LIMITED New Build Generating CMU Wakefield ESS Wakefield ESS +1 more Rejected WF1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.77 MW
Loading map...
Showing 25 locations