Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

502 unique locations (1690 components) - Page 8 of 21

Land to North of Wey Manor Road, Addlestone, New Haw Surrey, KT15 3JR (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
11.94 MW
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components)

This is a 49.99MW battery storage facility connected at 33kV. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
22.04 MW
Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY (2 components)

47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site. (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
18.37 MW
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components)

Lithium-based battery energy storage system. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
24.36 MW
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
• A new build battery energy storage system (2)
• A new build 99.9MW battery energy storage system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.77 MW
Land south of the Rayleigh Main Substation, SS11 8TZ (1 component)

New build generating battery storage unit

Active • 2028-29 (T-4)
83.76 MW
75.38 MW
Land South Of Marsh Farm Marsh Lane Fobbing Essex SS17 9JW (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
11.67 MW
20.94 MW
11.67 MW
10.09 MW
Land South East of the Carrs Fishing Lakes, Letch Lane, Carlton, Stockton-on-Tees, TS21 1EA (1 component)

CMU is a 57MW/114MWh Battery Electric Storage System, which will connect to the Transmission network via a tertiary winding at the Norton 275kV substation. The Facility will comprise of 32 …

Active • 2027-28 (T-4)
5.76 MW
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
20.27 MW
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components)
• A 49.5MW battery energy storage system (2)
• A 48MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land South East Of A6108, Darlington Road, Richmond, North Yorkshire, DL10 7ED (1 component)

A new build 2 hr duration Lithium-Ion Energy Storage Site

Active • 2027-28 (T-4)
4.16 MW
Land on West of St Michaels Road Widnes, WA8 8TB. (1 component)

New Build CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
1.26 MW
Land On The South East Side Of Medlock Road, Failsworth, Manchester M35 9WG (1 component)

A 30MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
6.28 MW
Loading map...
Showing 25 locations