Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

362 unique locations (1367 components) - Page 8 of 15

land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (8 components)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity.
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
15.25 MW
Land North Of Stoke Lane Dunston Norfolk, NR14 8QD (2 components)

" Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration"

Active • 2028-29 (T-4)
29.32 MW
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (8 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
13.88 MW
Land north of Indian Queens Substation, Domellick Hill (B3279), St Dennis, St Austell, Cornwall, PL26 8BY (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4), 2025-26 (T-1)
32.03 MW
Land North Of Gala Bingo, Winterton Road, Scunthorpe, DN15 0DH. (1 component)

A Battery Energy Storage System.

Active • 2027-28 (T-4)
14.62 MW
Land North East of Sandyforth Farm, Ashton Road, Wigan WN5 7XZ (2 components)

New Build Battery Storage

Active • 2028-29 (T-4)
29.02 MW
12.15 MW
Land Northeast of Moat Lane, Moat Farm, Wickersley, Rotherham, S66 1DZ (2 components)

New-build energy storage asset

Active • 2028-29 (T-4)
31.41 MW
Land northeast of Kingston Road, Slimbridge, Gloucestershire, GL27BW (1 component)

2 hour Battery Energy Storage System

Active • 2028-29 (T-4)
7.54 MW
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
• A new build 29MW battery energy storage system
• A new build 30MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
6.80 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (6 components)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Active • 2026-27 (T-4), 2025-26 (T-1) ...
36.26 MW
Land north east of Bustleholm Substation Painswick Close Walsall WS5 4SJ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
33.32 MW
Land Next To Bojea Farm, St Austell, PL25 5RU (1 component)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

Active • 2026-27 (T-4)
11.82 MW
Land Near To Monks House, Westerleigh, BS37 8RD (1 component)

BESS with Lit-Ion technology, 2 hours duration

Active • 2027-28 (T-4)
15.30 MW
4.61 MW
20.94 MW
Land lying to the south west of Rouncil Lane, Kenilworth (CV8 1NN) (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2027-28 (T-4)
5.85 MW
Land Lying To The South Of Manor Farm, Ratcliffe On Soar, Nottingham NG11 0EA (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Active • 2027-28 (T-4)
18.47 MW
Land lying to the east of Rectory Lane, Upton Warren, Bromsgrove, B61 7ET (1 component)

This is a 29.700 MW battery storage facility connected at 66kV.

Active • 2028-29 (T-4)
4.67 MW
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (2 components)

Lithium-based battery energy storage system

Active • 2026-27 (T-4), 2025-26 (T-1)
17.92 MW
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (4 components)

New Build Battery Energy Storage system

Active • 2028-29 (T-4)
30.99 MW
Land East of Bowbridge Lane, New Balderton, Newark, Nottinghamshire, NG24 3BY (2 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
8.16 MW
Loading map...
Showing 25 locations