Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

521 unique locations (1480 components) - Page 9 of 21

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ (21 components)

Battery energy storage unit (3)

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Carlisle Road Carlisle Road +1 more S4
Active • 2028-29 (T-4), 2027-28 (T-4) ...
23.96 MW
land at Keelings Road, Southminster, CM0 7JF (4 components)
• New build generating CMU component known as Dengie BESS (2)
• New build generating CMU component known as Dengie Solar Park
Solar Photovoltaic Storage (Duration 2h) BRITISH SOLAR RENEWABLES LIMITED New Build Generating CMU Dengie BESS Dengie Solar Park Not Prequalified CM0
Active • 2027-28 (T-4), 2025-26 (T-1)
3.33 MW
Land at Keithick Estate, PH13 9LZ (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) SIRIUS ECODEV (KEITHICK) LTD New Build Generating CMU Keithick Keithick Not Prequalified PH13
Active • 2026-27 (T-4), 2025-26 (T-4)
1.51 MW
Land at Legacy Substation, Bronwylfa Road, Legacy, Wrexham, LL14 4HY (3 components)
• A Battery Energy Storage System (2)
• A gas fuelled generating station.
Reciprocating engines Storage (Duration 2h) HD639LEG LIMITED New Build Generating CMU Fryston Legacy +1 more LL14
Active • 2026-27 (T-4), 2025-26 (T-1) ...
28.95 MW
Land at Lincomb Farm, Lincomb, Stourport-On-Severn, DY13 9RB (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Stourport0081 Not Prequalified DY13
Active • 2027-28 (T-4)
18.47 MW
Land at Midmill, Kintore, Aberdeenshire, AB51 0XB The located around 1.9km to the south of the centre of Kintore, on the western side of the A96 south of the Denhead Roundabout where the B987 leaves the A96.The site is bordered to the West by Sheriff (1 component)

Standalone battery energy storage project. The site will comprise of batteries, power conversion systems, transformers, switchgear,monitoring and control systems.

Storage (Duration 2h) GIGABOX NO 5 LIMITED New Build Generating CMU Broomhill BESS Not Prequalified AB51
Active • 2027-28 (T-4)
5.39 MW
Land at Mill Hill Substation, Partingdale Road, Barnet, NW7 1NT (3 components)

A Battery Energy Storage System. (3)

Storage (Duration 2h) HB333MIL LTD New Build Generating CMU Mill Hill Mill Hill +1 more NW7
Active • 2027-28 (T-4), 2026-27 (T-4) ...
22.24 MW
Land At Mitchells Ind Park, Barnsley, S73 8HR (12 components)

Battery energy storage unit (2)

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Mitchells Mitchells Not Prequalified S73
Active • 2028-29 (T-4), 2027-28 (T-4)
9.43 MW
Land at Monk Fryston Substation, Rawfield Lane, Leeds, LS25 5JD (3 components)
• A Battery Energy Storage System
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant
Reciprocating engines Storage (Duration 2h) HD777FRY LTD New Build Generating CMU Fryston Fryston +1 more Not Prequalified LS25
Active • 2025-26 (T-4), 2024-25 (T-4)
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF (4 components)
• 49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
• 49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
• 49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
Storage (Duration 2h) Zenobe Wishaw Limited New Build Generating CMU Wishaw Wishaw +1 more ML2
Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.82 MW
Land at Nineveh Farm, Nuneham Courtenay, Oxford OX44 9PA (1 component)

Lithium-based battery energy storage system

Storage (Duration 2h) COWLEY BALDON GREEN LIMITED New Build Generating CMU COWLEY OX44
Active • 2025-26 (T-1)
13.58 MW
Land at Oaklands Farm Featherstone Lane, Wolverhampton, Staffordshire, WV10 7JZ (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Shareshill Shareshill WV10
Active • 2028-29 (T-4), 2027-28 (T-4)
19.09 MW
Land at Ocker Hill Substation, Power Way, Tipton, DY4 0PW (3 components)
• A Battery Energy Storage System. (2)
• A New Build Gas fuelled power plant.
Reciprocating engines Storage (Duration 2h) HD143OCK LTD New Build Generating CMU Ocker Hill Ocker Hill +1 more DY4
Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.92 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.20 MW
LAND AT PRESTON FARM INDUSTRIAL ESTATE, OFF WESTLAND WAY, PRESTON FARM, TS18 3TG (1 component)

New-build energy storage site.

Storage (Duration 2h) HARMONY ST LIMITED New Build Generating CMU Stockton BESS TS18
Active • 2028-29 (T-4)
7.75 MW
Land at Private Road No.5, Colwick Industrial Estate, Nottingham, NG4 2JU (6 components)

Battery energy storage unit (3)

Storage (Duration 2h) FRP MERCIA HOLDCO LIMITED New Build Generating CMU Private Road Battery Private Road Battery +1 more NG4
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.95 MW
Land at Rothienorman, Badenscoth, Aberdeenshire, Scotland, AB51 8XQ (1 component)

49.9 MW Grid connection Battery Storage site.

Active • 2026-27 (T-4)
9.93 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Westhoughton
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Bolton0077 Bolton0078 +3 more Not Prequalified BL5
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.02 MW
Land at Smith Road, Wednesbury, WS10 0PD (2 components)
• New build generating battery storage unit.
• New build generating storage unit
Active • 2028-29 (T-4)
48.64 MW
Land at Somerford Farm, SN16 9RN (4 components)
• A Battery Energy Storage System (2)
• A Battery Energy Storage System.
Storage (Duration 2h) Storage (Duration 8h) PD813ETY LTD PD688IRO LTD New Build Generating CMU Minety 3 Minety 3 +2 more SN16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.18 MW
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
• A 7.5MW Tesla Battery Energy Storage System (2)
• Tesla Battery Energy Storage System
Storage Storage (Duration 1h) Storage (Duration 2h) HARMONY HB LIMITED Existing Generating CMU HOLES BAY HOLESBAY +4 more BH15
Active • 2027-28 (T-4), 2026-27 (T-4) ...
5.32 MW
Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (2 components)

Lithium ion battery storage system capable of charging, storing and discharging electricity. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
2.61 MW
Land at STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16MW, located in Buxton.

Storage (Duration 2h) R&S ENERGY LIMITED Existing Generating CMU Buxton BESS SK17
Active • 2025-26 (T-1)
3.73 MW
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Storage (Duration 2h) R&S ENERGY LIMITED New Build Generating CMU Buxton BESS SK17
Active • 2024-25 (T-1)
3.46 MW
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Storage (Duration 2h) R&S ENERGY LIMITED New Build Generating CMU Buxton BESS SK17
Active • 2026-27 (T-4)
2.48 MW
Loading map...
Showing 25 locations