Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

553 unique locations (1600 components) - Page 9 of 23

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Land south of the Rayleigh Main Substation, SS11 8TZ (1 component) Geocoding Needed

New build generating battery storage unit

Storage (Duration 2h) GRESHAM HOUSE DEVCO PIPELINE LIMITED New Build Generating CMU Not Prequalified SS11
Active • 2028-29 (T-4)
83.76 MW
Land South of Staythorpe Road, Staythorpe, NG23 5RG (1 component) Geocoding Needed

New build battery storage

Active • 2028-29 (T-4)
75.38 MW
Land South of National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester, CH66 2HD (4 components) Geocoding Needed

Standalone Battery Storage Asset

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) NATIVE RIVER LTD New Build Generating CMU Native River Native River +1 more CH66
Active • 2026-27 (T-4), 2025-26 (T-4) ...
49.35 MW
Land South Of Marsh Farm Marsh Lane Fobbing Essex SS17 9JW (1 component) Geocoding Needed

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU RAYLEIGH 1 Not Prequalified SS17
Active • 2026-27 (T-4)
11.67 MW
Land South of Inglis Farm, Cockenzie, East Lothian, EH32 0JT (1 component) Geocoding Needed

New build generating storage asset

Storage (Duration 2h) COCKENZIE STORAGE LIMITED New Build Generating CMU Not Prequalified EH32
Active • 2028-29 (T-4)
20.94 MW
Land South of Church Farm, Somersham, IP8 4PN and Land East of The Channel, Burstalhill, IP8 4JL (1 component) Geocoding Needed

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU BRAMFORD 1 Not Prequalified IP8
Active • 2026-27 (T-4)
11.67 MW
10.09 MW
Land South East of the Carrs Fishing Lakes, Letch Lane, Carlton, Stockton-on-Tees, TS21 1EA (1 component) Geocoding Needed

CMU is a 57MW/114MWh Battery Electric Storage System, which will connect to the Transmission network via a tertiary winding at the Norton 275kV substation. The Facility will comprise of 32 …

Storage (Duration 2h) MEADOW FARM BATTERY LIMITED New Build Generating CMU Meadow Farm Battery Limited TS21
Active • 2027-28 (T-4)
5.76 MW
Land south east of Sundon Substation, Water End Lane, Chalton, Luton, LU4 9UB (4 components) Geocoding Needed

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
47.63 MW
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)

Storage (Duration 2h) PIVOTED POWER LLP Existing Generating CMU Pivot Power Sundon Pivot Power Sundon LU4
Active • 2025-26 (T-1), 2024-25 (T-1)
23.55 MW
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components) Geocoding Needed
• A 48MW battery energy storage system
• A 49.5MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HARMONY (PW) LIMITED New Build Generating CMU PILLSWOOD PILLSWOOD +2 more HU16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
80.74 MW
Land South East Of A6108, Darlington Road, Richmond, North Yorkshire, DL10 7ED (1 component) Geocoding Needed

A new build 2 hr duration Lithium-Ion Energy Storage Site

Storage (Duration 2h) HARMONY SK LIMITED New Build Generating CMU DL10
Active • 2027-28 (T-4)
4.16 MW
Land on West of St Michaels Road Widnes, WA8 8TB. (1 component) Geocoding Needed

New Build CMU comprising of battery storage and associated plant.

Storage (Duration 2h) Shell Green Ltd New Build Generating CMU Widnes Not Prequalified WA8
Active • 2026-27 (T-4)
1.26 MW
LAND ON THE WEST SIDE OF MAIN ROAD, GRENDON, NORTHAMPTON, NN7 1JW. (Nearest postcode to grid reference: NN7 1JB). (10 components) Geocoding Needed

Battery Storage Plant

Storage Storage (Duration 2h) Storage (Duration 4h) GRENDON STORAGE LIMITED New Build Generating CMU Grendon Storage 020 Grendon Storage 043 +6 more NN7
Active • 2026-27 (T-4), 2025-26 (T-4) ...
166.86 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (Nearest postcode to grid reference: M33 2JT). (5 components) Geocoding Needed

Battery Storage Plant

Storage Storage (Duration 1h) Storage (Duration 2h) WEST DIDSBURY STORAGE LIMITED New Build Generating CMU West Didsbury Storage West Didsbury Storage 017 +1 more M33
Active • 2024-25 (T-4), 2023-24 (T-4) ...
68.56 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (6 components) Geocoding Needed

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) WEST DIDSBURY STORAGE LIMITED New Build Generating CMU West Didsbury Storage West Didsbury Storage +3 more M33
Active • 2025-26 (T-4), 2024-25 (T-1) ...
37.01 MW
Land on the South Side of Fairy Lane, Sale, M33 2JU (1 component) Geocoding Needed

Battery Storage Plant

Active • 2024-25 (T-1)
10.43 MW
Land On The South East Side Of Medlock Road, Failsworth, Manchester M35 9WG (1 component) Geocoding Needed

A 30MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Medlock Not Prequalified M35
Active • 2028-29 (T-4)
6.28 MW
Land on the Northwest side of Barnett Wood Lane, Leatherhead, KT21 2BU (1 component) Geocoding Needed

98MW / 196MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU MERTON COLLEGE Not Prequalified KT21
Active • 2026-27 (T-4)
23.16 MW
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (11 components) Geocoding Needed

Battery Storage Plant

Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 4h) ENDERBY STORAGE LIMITED New Build Generating CMU Enderby Storage 019 Enderby Storage 042 +6 more LE19
Active • 2025-26 (T-4), 2024-25 (T-4) ...
144.62 MW
Land on the North Side of Desford Road, Enderby, Leicester, LE19 3LR (1 component) Geocoding Needed

Battery Storage Plant

Active • 2024-25 (T-1)
10.20 MW
Land on the North-East side of Honeysuckle Cottage, Morthen Road, Wickersley, Rotherham, South Yorkshire, S66 1DY (1 component) Geocoding Needed

New build generating storage CMU

Active • 2028-29 (T-4)
17.80 MW
Land On The North And South Of Brinsworth Road, Brinsworth, Rotherham S60 5EN (1 component) Geocoding Needed

A 40MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (SOUTH) LIMITED New Build Generating CMU Brinsworth S60
Active • 2028-29 (T-4)
8.38 MW
Loading map...
Showing 25 locations