Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

362 unique locations (1367 components) - Page 9 of 15

Land east of A981, Fraserburgh, Aberdeenshire (4 components)

12 x 3.800MW / 7.491MWh storage units installed on land adjacent to A981, Fraserburgh

Active • 2026-27 (T-4), 2023-24 (T-1)
18.67 MW
LAND EAST AND WEST OF HONILEY ROAD (A4177), HONILEY, KENILWORTH, WARWICKSHIRE (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
11.67 MW
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
49.98 MW
Land close to Smeaton Shaw Farm, Dalkeith, EH22 2NL (1 component)

2H duration Lithium Ion Battery Storage New Build CMU.

Active • 2028-29 (T-4)
35.18 MW
Land At Westerton Road, Keith, Moray, AB55 5NR (2 components)

CMU 24KEI4 is a battery storage CMU.

Active • 2028-29 (T-4)
14.46 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (4 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
286.73 MW
Land at Vause Farm, Town Lane, Charnock Richard, Chorley, PR7 5HL (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
7.95 MW
Land at Tuxton Farm, Plympton, Plymouth, PL7 5AA (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
7.08 MW
Land at The Magazine, Hull Road, Selby, YO8 5BJ (27 components)
• Battery energy storage unit
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4)
33.14 MW
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP (2 components)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Active • 2026-27 (T-4)
4.96 MW
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Active • 2024-25 (T-1)
3.46 MW
Land at STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (2 components)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16MW, located in Buxton.

Active • 2025-26 (T-1)
19.73 MW
Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (4 components)

Lithium ion battery storage system capable of charging, storing and discharging electricity.

Active • 2028-29 (T-4), 2025-26 (T-1)
5.23 MW
Land at Sterte Avenue West, Poole, BH15 2AL (20 components)
• A 7 MW Battery Energy Storage System
• A 7.5MW Tesla Battery Energy Storage System
• A 7MW Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-4) ...
11.01 MW
Land at Smith Road, Wednesbury, WS10 0PD (2 components)
• New build generating battery storage unit.
• New build generating storage unit
Active • 2028-29 (T-4)
48.64 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Active • 2026-27 (T-4)
2.36 MW
Land at Rothienorman, Badenscoth, Aberdeenshire, Scotland, AB51 8XQ (1 component)

49.9 MW Grid connection Battery Storage site.

Active • 2026-27 (T-4)
9.93 MW
Land at Private Road No.5, Colwick Industrial Estate, Nottingham, NG4 2JU (7 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2026-27 (T-4) ...
2.68 MW
15.50 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (5 components)

A Battery Energy Storage System.

Active • 2028-29 (T-4), 2026-27 (T-4)
140.24 MW
Land at Ocker Hill Substation, Power Way, Tipton, DY4 0PW (1 component)

A Battery Energy Storage System.

Active • 2024-25 (T-1)
12.92 MW
Land at Oaklands Farm Featherstone Lane, Wolverhampton, Staffordshire, WV10 7JZ (2 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
22.70 MW
Loading map...
Showing 25 locations