Storage (Duration 3h)

6 unique locations (30 components)

Active MW: 702.22 MW
Inactive MW: 0.00 MW
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (5 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.11 MW
Minchens Lane, Bramley, TADLEY RG26 5BJ (6 components)

99MW of Battery Energy Storage Systems

Storage (Duration 3h) Storage (Duration 2.5h) PENSO POWER LIMITED New Build Generating CMU Not Prequalified RG26
Active • 2027-28 (T-4), 2026-27 (T-4) ...
153.58 MW
Minchens Lane, Bramley, Tadley, RG26 5BJ (6 components)
• 99.000MW Battery Energy Storage site
• 99MW of Battery Energy Storage Systems
• Existing, Operational Battery Energy Storage site. This application is for a built, installed, commissioned and operational battery storage facility, with civil works, power conversion units, battery cells house in containers, transformers, cabling and associated wiring and ancillary equipment relevant for the operation of an energy storage system. The plant is connected to the 132kv network via appropriate equipment, cabling and substation designed and built to meet the relevant DNO requirements.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
153.58 MW
Minchens Lane Bramley Tadley RG26 5BJ (5 components)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
153.58 MW
Former Sanmex Site, Land at Dalmarnock Road, Rutherglen, South Lanarkshire, G73 1NY (4 components)
• New Build Battery Storage
• New build battery Storage
Active • 2029-30 (T-4), 2028-29 (T-4) ...
39.12 MW
Loading map...
Showing 6 locations