Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 3h)

37 unique locations (98 components) - Page 2 of 2

Active MW: 451.14 MW
Inactive MW: 0.00 MW
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (1 component)

New Build transmission connected Battery Storage site on land Adjacent to National Grid's Rainhill Substation

Storage (Duration 3h) SIZING JOHN LIMITED New Build Generating CMU Sizing John Phase 2 WA9
Active • 2028-29 (T-4)
17.82 MW
Letchworth Power, Dunhams Lane, Letchworth Garden City, SG6 1JH (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network

Storage (Duration 3h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Letchworth Power SG6
Active • 2027-28 (T-4)
1.10 MW
Minchens Lane Bramley Tadley RG26 5BJ (2 components)
• 99.000MW Battery Energy Storage site
• New Build Battery Energy Storage site
Active • 2025-26 (T-1), 2024-25 (T-1)
66.85 MW
Newby Power, Unit 9, Newby Road Industrial Estate, Stockport, SK7 5DA (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Storage (Duration 2h) Storage (Duration 3h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Newby Power Newby Power SK7
Active • 2027-28 (T-4), 2026-27 (T-4)
3.42 MW
Newton Farm Newton South Queensferry West Lothian It is to be noted that for Grid Connection correspondence post code of EH30 9SN was used. However, the project site`s post code is yet to be identified. We will notify the DB as soon as the exact post cod (6 components)
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 20MW import (2)
• Solar photovoltaic generation scheme connected to the distribution network
Solar Photovoltaic Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) ASE UK HOLDINGS LIMITED New Build Generating CMU Aithrie BESS 3 Aithrie BESS 4 +4 more Rejected EH30
Active • 2027-28 (T-4), 2026-27 (T-4)
37.87 MW
Philip Street Scrapyard, Philip Street, St Philips, Bristol, BS2 0TA (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 3h) CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU St Philips BS2
Active • 2024-25 (T-4)
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.76 MW
Sewage Treatment Works, Chelmsford Road, Dunmow, CM6 1XG (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified CM6
Active • 2027-28 (T-4), 2024-25 (T-1)
0.13 MW
Stephenson Road, Colchester Business Park, CO4 9QP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified CO4
Active • 2027-28 (T-4), 2024-25 (T-1)
0.14 MW
Tabor Avenue Reservoir, CM7 1FB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified CM7
Active • 2027-28 (T-4), 2024-25 (T-1)
0.14 MW
Water Pumping Station, Watson Road, MK42 6BL (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified MK42
Active • 2027-28 (T-4), 2024-25 (T-1)
0.13 MW
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified PE11
Active • 2027-28 (T-4), 2024-25 (T-1)
0.13 MW
Loading map...
Showing 12 locations