Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 3h)

38 unique locations (99 components) - Page 2 of 2

Active MW: 451.14 MW
Inactive MW: 0.00 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.02 MW
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Dellsome Power Dellsome Power +1 more AL4
Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.57 MW
Coxhall Power, Coxhall Road, Tattingstone, Ipswich, IP9 2NH (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Storage (Duration 2h) Storage (Duration 3h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Coxhall Power Coxhall Power IP9
Active • 2027-28 (T-4), 2026-27 (T-4)
2.28 MW
Common Lane, Wath upon Dearne, Rotherham, South Yorkshire, S63 7DX (4 components)
• Battery energy storage unit (2)
• New reciprocating genset in acoustic enclosure
Reciprocating engines Storage (Duration 3h) FRP MERCIA HOLDCO LIMITED New Build Generating CMU Common Lane Common Lane S63
Active • 2028-29 (T-4), 2025-26 (T-1) ...
0.69 MW
Colton Farm Lochead Dunfermline Fife, KY 10. This address and pincode was used for grid correspondence. However, the site`s own post-code is yet to be identified. We will notify the DB as soon as it is available. Please see the cover letter for more det (4 components) Geocoding Needed
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
• Solar generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
Active • 2026-27 (T-4)
32.89 MW
Cascade Works, Wellington Rd, Burton-on-Trent, DE14 2DW DE14 2DW Burton Upon Trent (1 component)

Battery storage

Storage (Duration 3h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Wellington Road - Battery Not Prequalified DE14
Active • 2024-25 (T-4)
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified MK15
Active • 2027-28 (T-4), 2024-25 (T-1)
0.13 MW
Albion Close, Worksop, S80 1RA (2 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.68 MW
Aber Park Road, Flint Flintshire CH6 5EX (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 3h) CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Flint C Not Prequalified CH6
Active • 2024-25 (T-4)
Aber Park Road, Flint Flintshire CH6 5EX (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 3h) CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Flint C Not Prequalified CH6
Inactive • 2021-22 (T-1)
5 Foxwood Rd, Chesterfield, S41 9RA (2 components)

Battery energy storage unit (2)

Storage (Duration 3h) POWERTREE (HOLDINGS) LIMITED New Build Generating CMU Sidings Foxwood 1MW BESS S41
Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
4 Sidings Rd, Kirkby in Ashfield, Nottingham NG17 7JZ (2 components)

Battery energy storage unit (2)

Storage (Duration 3h) POWERTREE (HOLDINGS) LIMITED New Build Generating CMU Sidings Foxwood 1MW BESS NG17
Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
24a Flightway Dunkeswell Honiton EX14 4LG (8 components)
• New Build Generating CMU comprising of a battery storage asset (2)
• New Build CMU comprising of battery storage and associated plant
Storage (Duration 3h) Storage (Duration 4h) CONRAD (DUNKESWELL) LIMITED New Build Generating CMU Dunkeswell Dunkeswell +3 more EX14
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 13 locations