1 unique locations (4 components)

land adjacent to the AYRSHIRE GRID 400KV COLLECTOR SUBSTATION, Cambelton Farm, Beech Avenue, Hunterston, West Kilbride, KA23 9QF. (4 components)
• 1 x Gas reciprocating engines with a total rated gross power capacity of 1.992 MW
• Lithium ion battery storage plant
• Paper Mill carrying out DSR using load turn-down.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
36.69 MW